Optimal Coordination of Over Current and Distance Relays

DOI : 10.17577/IJERTV3IS100657

Download Full-Text PDF Cite this Publication

Text Only Version

Optimal Coordination of Over Current and Distance Relays

Sindhu A Dr. Bisharathu Beevi A .

M.Tech Scholar, Associate Professor

Dept of Electrical Engg. Dept of Electrical Engg

College of Engineering, Trivandrum, Kerala. College of Engineering, Trivandrum, Kerala.

Abstract- Over current and Distance relays are commonly used for protecting power systems. In many sub-transmission and transmission power systems , the main protection schemes use distance relays and directional over current relays are used as secondary protection. In the optimal methods, the operating times of the relays are minimized in the frame of the objective function, subject to coordination constraints, relay characteristic curves and the limits of the relay settings. In the project a new optimal method for the coordination of over current and Distance relay based on genetic algorithm has been developed. Various over current relays characteristics are considered and the best of them is selected by genetic algorithm to fulfill optimal coordination.

Keywords- Power System Protection;Overcurrent Relay; Distance relay; Optimal Coordination; Relay characteristics; Genetic Algorithm

  1. INTRODUCTION

    In a power system some failure will occur somewhere in the system.When a failure occurs on any part of the powersystem, the relays detect the abnormal conditions and operates. The relays supply information to the circuit breaker which performs the function of circuit interruption. The circuit breaker isolate the defective element from the rest of the system.The main function of protection system is to isolate the minimum possible part of power system at a fault or an abnormal condition. When a fault occurs in a power system , it should always be detected by two different protection relays. The protection relays are normally designated Main and Backup protection.

    Distance and overcurrent relays are mainly used for transmission and sub transmission protection system. To consider comprehensive coordination, a distance relay with distance one, an overcurrent relay with overcurrent and finally a distance relay with an overcurrent one when one of them is considered to be main relay and other as backup must be coordinated. In many transmission systems the main protection schemes use distance relays and the directional over current relays are used as a secondary protection.

    When the main protection fails to operate, the first stage backup protection should operate. The determination of time delay for the operation of all backup relays is known as coordination of protection system. Several optimization methods are proposed for coordination of overcurrent relays. The optimal coordination of over current relays has been performed using linear programming techniques such as simplex

    [2];two phase simplex[3]; and dual simplex [4] methods. The optimal solution is made by constraints only in [6].The disadvantage in the above method is that an optimal solution is not obtained if the constrains are not fulfilled.

    The optimal coordination by evolutionary algorithm

    [9] may have two problems; miscoordination and lack of a solution. This is because optimization techniques as based on an initial guess and can be trapped in local maximum or minimum values. The intelligent optimization method using Genetic Algorithm does not have this problem. For optimal coordination of relays the critical fault locations have to be determined. The discrimination time between backup and main relays are minimum at critical fault points. The coordination of relays is done based on the constraints derived from values of t for critical fault locations .

    In all existing mathematical coordination methods, fixed characteristics is applied for all over current relays. To achieve optimal coordination the best characteristics for over current relay is required.In this paper the best characteristics of over current relay is selected by genetic algorithm for optimal oordination.In this method the constraints are included in the objective function.

  2. REVIEW OF COORDINATION PROBLEM

    1. Problem Statement :

      The optimal coordination of relay can be considered as an optimization problem. The aim of the optimization problem is to minimize the objective function subject to constraints. The general form is

      Obj = min ti (1)

      1in

      Subject to

      Tb- Tm CTI (2)

      Where n is the number of relays and ti is the operating time of ith relay. Tb is the operating time of backup relay and Tm is the operating time of primary relay. CTI is the coordination time interval.

    2. Relay characteristics:

      The relays used for protection are distance and overcurrent relays. The distance relays have fixed time of operation while we consider various characteristics for each overcurrent relay.The operating time of over current relay can be found out using the formula

      t= TSM [ k + L]

      M

      Where M is the ratio of short circuit current to pick up current of relay, t is the relay operating time, K,,L are the scalar quantities.The value of K,,L differ for each characteristics of overcurrent relay which is given in Table I The TSM of the relays are having discrete value ranging from 0 to 1 in steps of 0.05.

      TABLE I

      Number of characteristics

      Type of characteristics

      Standard

      K factor (C1)

      factor

      L factor

      1

      Short time inverse

      AREVA

      0.05

      0.04

      0

      2

      Standard inverse

      IEC

      0.14

      0.02

      0

      3

      Very inverse

      IEC

      13.5

      1

      0

      4

      Extremely inverse

      IEC

      80

      2

      0

      5

      Long time inverse

      AREVA

      120

      1

      0

      6

      Moderately inverse

      ANSI/IEEE

      0.0515

      0.02

      0.114

      7

      Very inverse

      ANSI/IEEE

      19.61

      2

      0.491

      8

      Extremely inverse

      ANSI/IEEE

      28.2

      2

      0.1217

      CHARACTERISTICS OF OVERCURRENT RELAYS

    3. Coordination constraints:

      The coordination constraint is

      Tb- Tm CTI (4)

      In the paper the protection scheme composed of over current and distance relays hence the constraint becomes

      tb(F) tz`2 CTI

      Where tb(F) is the operating time of overcurrent relay at F, tz2 is the operating time of second zone of distance relay and CTI is the coordination time interval. tb(F) depend on the characteristic type of overcurrent relay.

  3. APPLICATION OF GENETIC ALGORITHM TO RELAY

    COORDINATION

    Genetic algorithm is one of the most powerful search methods for solving optimization problems. TSM and various characteristics of overcurrent relays are the unknown quantities in the optimization. Therefore these two parameters are considered as genomes of chromosomes in GA. Hence the initial value of TSM and characteristics set are randomly selected.

    R1

    R2

    R3/p>

    Rn

    TSM 1

    CHAR1

    TSM2

    CHAR2

    TSM3

    CHAR3

    TSMn

    CHARn

    Fig 1 . Structure of chromosome

    The Objective Function (OF) is used to evaluate the goodness of each. Chromosome with more effectiveness are used for producing new generation of chromosomes. The new offsprings are produced by genetic operation crossover or mutation.[4]. The new offsprings indicate the new TSM and characteristics of relays.

    The process is terminated after a fixed number of generations. Better solutions are obtained if the number of generations are higher.obtained.The r number of generation depends on complexity of the system and population size.

  4. PROPOSED METHODOLOGY The objective function formulated is

    Where 1, 2 and 3, are weighing factors, i is the number of overcurrent relays( i=1 to N), k1 is the number of main and backup overcurrent relays(k1=1 to P1), k2 is the number of main distance and backup overcurrent relays (k2=1toP1), tmbti| is the discrimination time between main and backup over current relays.

    The second and third term in the objective function fulfill the requirement of coordination of over current and distance relays. If tmbDISOCIk2I is positive then the relative term is zero. If it is negative the term will have large values.Then based on selection and evaluation of GA , the Chromosomes with more optimal objective function values are selected for next generation.Therefore the TSM and characteristics set belongs to miscoordination which produces large OF is not chosen.

    The flowchart of proposed method is shown in Fig 2.The network data are initially entered, then the impedance of first, second and third zone of distance relay is calculated. The short circuit current for fault close to circuit breaker of overcurrent relay is calculated. Time of operation of distance relay and overcurrent relay are calculated and initial values for population are entered. After that GA will start, the process will be continued for a fixed number of generation.

    Fig 2. Flowchart of proposed method

  5. TEST CASE

    A.Network Information

    The proposed method is applied to a sample power network which consists of 6 buses, 7 lines, 2 transformers and 2 generators. The R (pu) and X (pu) are based on100MVA and 150kV. All the lines are protected by both overcurrent and distance relays.

    Fig 3. Sample network

    The network information is given in Table II, III and Table IV.

    TABLE II

    LINE INFORMATION OF SAMPLE NETWORK

    Line

    R(pu)

    X(pu)

    V(kv)

    1

    .0018

    .0222

    150

    2

    .0018

    .0222

    150

    3

    .0018

    .02

    150

    4

    .0022

    .02

    150

    5

    .0022

    .02

    150

    6

    .0018

    .02

    150

    7

    .0022

    .0222

    150

    TABLE III

    0.1

    V(kV)

    X(pu)

    GENERATOR INFORMATION OF SAMPLE NETWORK

    Generator

    10

    TABLE IV

    0.026666

    X (pu)

    TRANSFORMERS INFORMATION OF SAMPLE NETWORK

    Transformer

    The primary and backup relay pair is identified by using graph theory and it is given in table V.

    TABLE V.

    LIST OF PRIMARY/BACKUP RELAY PAIRS

    Pair no.

    Primary relay

    Backup relay

    Pair no.

    Primary relay

    Backup relay

    1

    2

    1

    11

    13

    8

    2

    14

    1

    12

    8

    9

    3

    3

    2

    13

    14

    9

    4

    4

    3

    14

    9

    10

    5

    5

    4

    15

    10

    11

    6

    6

    5

    16

    11

    12

    7

    7

    5

    17

    7

    13

    8

    1

    6

    18

    12

    13

    9

    2

    7

    19

    6

    14

    10

    8

    7

    20

    12

    14

    The short circuit current for the back up over current relays is listed in Table VI.

    TABLE VII

    Relay No.

    Pick up current

    1

    125

    2

    200

    3

    150

    4

    200

    5

    137

    6

    137

    7

    162

    8

    137

    9

    135

    10

    137

    11

    162

    12

    137

    13

    150

    14

    200

    PICKUP CURRENT SETTINGS DATA

    TABLE VI

    SHORT CIRCUIT CURRENT DATA

    Relay No.

    Short circuit current

    1

    828

    2

    816

    3

    3505

    4

    1769

    5

    1103

    6

    340

    7

    337

    8

    2682

    9

    1571

    10

    1563

    11

    2492

    12

    340

    13

    337

    14

    1174

    The pick up current settings of the relays is listed in Table VII.

    GA Information

    The GA control parameters are given in Table VIII, the parameters are found out by trial and error procedure.

    TABLE VIII

    GA Parameters

    GA parameters

    value

    No. of generation

    100

    Size of population

    20

    Initial population

    random

    Mutation

    1

    C. Results and discussion

    The proposed GA is applied to the sample network.Optimum TSM and over current relay characteristics are obtained. The operating time of second and third zone of distance relay is selected as 0.3(sec) and 0.6(sec). The TSMs obtained are in a valid range (0.05-1.0) and the operating times are lower than that obtained using fixed characteristics. Best overcurrent relay characteristics selected by GA for each relay position is given in column 2. The operating time of relay considering fixed characteristics (characteristic 2) are shown in the column 4 and the operating time obtained considering TSM and characteristics selected by GA are listed in table IX and X. Fom the result obtained it is clear that operating time selected by GA is less than that obtained with fixed characteristics .

    TABLE IX

    Operating time of over current relay with fixed characteristics

    TABLE X

    Operating time obtained by GA

    Rela y No.

    TS M

    No. of chara selecte d

    Operatin g time

    1

    .05

    2

    .1652

    2

    .1

    2

    .2236

    3

    .15

    2

    .3858

    4

    .2

    2

    .7584

    5

    .05

    2

    .3577

    6

    .1

    2

    .2147

    7

    .15

    2

    .4261

    8

    .2

    2

    .4335

    9

    .05

    2

    .3272

    10

    .1

    2

    .2887

    11

    .15

    2

    .3457

    12

    .2

    2

    .3979

    13

    .05

    2

    .1831

    14

    .1

    2

    .3050

    Rela y No.

    TSM(G A)

    No. of chara selecte d

    (GA)

    Operatin g time

    1

    .05

    4

    .0932

    2

    .35

    4

    .0914

    3

    .05

    5

    .5559

    4

    .05

    1

    .0353

    5

    .05

    4

    .7753

    6

    .05

    5

    .3229

    7

    .05

    4

    .0434

    8

    .05

    5

    .3490

    9

    .05

    1

    .0664

    10

    .05

    4

    .0552

    11

    .15

    2

    .3684

    12

    .05

    5

    .2336

    13

    .3

    1

    .2139

    14

    .4

    1

    .2331

    TABLE XI

    Rela y No.

    TSM(selecte d by GA)

    No.of chara selected

    by GA

    Operating time in sec selected by

    GA

    Operating time (sec)(fixe

    d chara)

    1

    .05

    4

    .0932

    .1652

    2

    .35

    4

    .0914

    .7790

    3

    .05

    5

    .5559

    .1286

    4

    .05

    1

    .0353

    .1896

    5

    .05

    4

    .0753

    .3577

    6

    .05

    5

    .3229

    .4074

    7

    .05

    4

    .0434

    .1420

    8

    .05

    5

    .3490

    .3584

    9

    .05

    1

    .0664

    .3272

    10

    .05

    4

    .0552

    .1444

    11

    .15

    2

    .3684

    .3984

    12

    .05

    5

    .2336

    .9995

    13

    .3

    1

    .2139

    1.0985

    14

    .4

    1

    .2331

    7

    1.2202

    Comparison of output with and without GA

    1.5

    1

    0.5

    GA

    Fixed chara

    0

    1 3 5 7 9 11 13

    Fig. Comparison of output with and without GA

  6. CONCLUSION

    Transmission lines are a vital part of the electrical distribution system, the line protection schemes are composed of distance relays and directional overcurrent relays. Protective relays coordination is very important in protection of the system. A method to automatically determine the optimum setting of overcurrent relays considering both distance and overcurrent relays has been presented.Separate relay computation would lead to loss of selectivity.Various relay characteristics are considered for each over current relay and best of them is selected by Genetic Algorithm for optimal relay coordination. The method has been tested on a sample six bus power network and from the results obtained it has been shown that the method is accurate and efficient.

  7. REFERENCES

    1. R. Mohammadi Chabanloo, H. Askarian Abyaneh, S. S. Hashemi Kamangar, and F. Razavi, A new genetic algorithm method for optimal coordination of O/C and distance relays considering various characteristics for O/C relays, presented at the PECON Conf., Johor Bahru, Malaysia, Dec. 2008.

    2. Reza Mohammadi Chabanloo, Hossein Askarian Abyaneh, Somayeh Sadat Hashemi Kamangar, and Farzad Razavi, Optimal Combined Overcurrent and Distance Relays Coordination IncorporatingIntelligent Overcurrent Relays Characteristic Selection IEEE Trans. Power Del., vol. 26, no. 3, pp. 1381-1391, Jul. 2011

    3. C. W. So and K. K. Li, Time coordination method for power system protection by evolutionary algorithm, IEEE TransInd.Appl., vol. 36, no. 5, pp. 1235-1240, Sep./Oct. 2000.

    4. F. Razavi, H. Askarian. Abyaneh, M. Al-Dabbagh, R. Mohammadi and H. Torkaman, A new comprehensive genetic algorithm method for overcurrent relays coordination, Electr

      .Power Syst. Res. , April 2008.

    5. A. J. Urdaneta, H. Resterpo, J. Sanchez and J. Fajardo, Coordination of directional overcurrent relays timing using linear programming, IEEE Trans. on Power Delivery, vol. 11, no. 1, pp.122- 129, January 1996.

    6. B. Chattopadhyay, M. S. Sachdev, and T. S. Sidhu, An on-line relay coordination algorithm for adaptive protection using linear programming techniques, IEEE Trans. Power Delivery, vol. 11, no. 1, pp. 165-173, January 1996.

    7. H. Askarian. Abyaneh and R. Keyhani, Optimal co- ordination of overcurrent relays in power system by dual simplex method, in: Proc 1995 AUPEC Conf. , Perth, Australia, vol. 3, pp. 440-445,1995.

    8. H. Askarian Abyaneh, M. Al-Dabbagh, H. K. Karegar, S.

      H. H.Sadeghi, and R. A. H. Khan, A new optimal approach for coordination of O/C relays in interconnected power systems, IEEE Trans. PowerDel., vol. 18, no. 2, pp. 430-435, Apr. 2003.

    9. Walter A. Elmore Protective Relaying Theory and Applications, Marcel Dekker Inc., New York, Second Edition.

    10. Luis G. Perez and Alberto J. Urdaneta,“Optimal Computation of Distance Relays Second Zone Timing in a Mixed Protection Scheme with Directional Overcurrent Relays,'' IEEE Transactions on Power Delivery, vol. 16, no. 3, pp. 385-388, July 2001.

    11. F. Kavehnia, H. Seifi, H. Keivani , and S. M.R. Askari“Optimal Coordination of Directional ver Current Relays in Power System Using Genetic Algorithm,'' in Proc. UPEC Conf.,pp 824-827 ec.2006

Leave a Reply