Effect of Change in Mixing Time of Mixer on Wet Density, Dry Density, Workability and Compressive Strength of M-20 Grade Concrete

DOI : 10.17577/IJERTV5IS120115

Download Full-Text PDF Cite this Publication

Text Only Version

Effect of Change in Mixing Time of Mixer on Wet Density, Dry Density, Workability and Compressive Strength of M-20 Grade Concrete

Dr. M. B.Varma1 1Assosiate Professor,

Applied Mechanics Department Government College of Engineering, Aurangabad, Maharashtra, India

25

25

2 month

2 month

20

20

15

15

28 days

28 days

Compressive Strength MPa

Compressive Strength MPa

.Abstract on actual construction site at the time of concrete production, mixing time of concrete mixer is kept as 2 minutes. This study was carried out on concrete properties by changing its mixing time. Ten concrete samples were prepared and tested with mixing time of mixture 1 minute, 2 minutes, and 3 minutes up to 10 minutes. Concrete of M-20 grade was prepared as per IS 456-2000. Using Nominal mix (guide lines of IS 456-2000) concrete was manufactured. Wet and dry density, workability and compressive strength were recorded for ten concrete mixes. Results obtained were presented in this paper.

10

10

Keywords Mixing Time, Compressive Strength, Density Of Concrete

INTRODUCTION

The compressive strength ,weight and dry density and workability of concrete depends upon many factors, e.g. quality and quantity of cement, water and aggregates; batching and mixing; type of mixture, mixing time, placing, and compaction and curing. Concrete was produced in laboratory using pan type mixture. Concrete properties weight density, dry density workability and compressive strength was studied by carrying out experimental study.

Researcher worked on mixing time and compressive strength of concrete and established some relation for 7 Days compressive strength, 28 Days compressive strength and 2 months compressive strength. Refer Figure 1 for relation between mixing time and compressive strength of concrete. The graph showing the relationship between the compressive

5

7 days

5

7 days

0

Time of Mixing – Minute

0

Time of Mixing – Minute

0

5

10

15

0

5

10

15

Figure 1: Strength and Mixing time of Concrete [1]

Strength of concrete and mixing time of concrete mixer in minutes is parabolic in nature.

Properties of concrete depend on

  1. Proper Mixing of concrete,

  2. mixing time,

  3. Type of concrete mixture.

    In construction activities on site, general practice adopted by engineer is use nominal mix and mixer for concrete production. No importance is given for mixing time in spite of it has direct impact on properties of concrete. There is need to study effect of change in mixing time on properties of concrete. In present research work main thrust was given to mixing time. Study was carried out by changing mixing time from 1 minute to 10 minutes without changing mix proportion, concrete is produced. The effect of mixing time on wet density, dry density, workability and compressive strength of concrete was experimentally studied and reported.

    At the time of production of concrete slump and compaction factor was recorded for measurement of workability of concrete. Wet weight and dry weight of concrete were recorded and from this weight dry and wet density of concrete were calculated. All the observations regarding 7 days compressive strength, 28 days compressive

    strength, slump of concrete, compaction factor of concrete, wet and dry weight of concrete were presented in Tables below. Figure 2 shows the concrete mixture used in laboratory to produce concrete.

    Figure 2: Concrete Mixer used in Laboratory

    Revolution of concrete mixer was 25 revolutions per minute. Figure 3 below shows the plate vibrator which was used to cast concrete cubes in laboratory by giving vibration.

    Figure 4: Compression Test on Concrete Cube

    Concrete was produced in laboratory using above proportion. Empty weight of cube moulds and weight of mould with concrete was recorded. All results obtained were tabulated below (Table 1); from obtained results wet density of concrete was calculated.

    Material:

    Ordinary Portland cement, Natural River sand, coarse aggregate from crusher of size 12 mm (1/2 inch), 20 mm (3/4 inch) and potable water was used to produce concrete in laboratory.

    Specimens:

    Concrete was produced using nominal mix. Cube mould of size 15 x 15 x 15 cm was used. Ten mixes was prepared by changing mixing time by 1 minute. For each mix, six cubes were cast and kept for water curing. After water curing of 7 days and 28 days, compressive strength was recorded.

    Figure 3: Table Vibrator [5]

    Figure 4 shows UTM 40 ton capacity which was used to find compressive strength of concrete cube.

    1. PRIOR APPROACH

      For a particular mixer, a relation between mixing time and uniformity is provided. Mixing less than 1 to 1.25 minutes result a significantly variable concrete but prolonging the time of mixing beyond these values render no significant improvement in uniformity. The length of mixing time depends on quality of blending materials during charging of mixture. [3]

      The exact value of mixing time is also a function of size of mixture. A minimum mixing time of 1 minute for mixer size of 1 cum. yd (3/4 cum. m) and 15 additional seconds for each addition cubic yard is giving satisfactory uniformity of mixing. [4]

      Mixing time is counted from the time when all the solid materials have been put in the mixer. Mixing time should count from the time when the entire ingredient has been discharged into the mixer. Exceptions many modern large mixers perform satisfactorily with a mixing time of 1 to 1.5 minutes. In high speed pan mixers, the mixing time can be as short as 35 seconds when lightweight aggregate is used, the mixing time, less than 5 minutes, may hamper developments of strength for better result. Sometimes mixing of aggregate with water for 2 minutes is done first followed by 3 minutes mixing after cement is added. [5]

    2. OUR APPROACH

      Mixing time minute

      Empty Weight of cube mould

      Filled Weight

      Wet Weight

      Wet Density of concrete

      Wet Density of concrete

      Kg

      Kg

      Kg

      Kg/m3

      Kg/m3

      1

      10.3

      19.3

      9

      2666.67

      2686

      10

      19.1

      9.1

      2696.30

      9.2

      18.35

      9.15

      2711.11

      10.45

      19.4

      8.95

      2651.85

      9.3

      18.45

      9.15

      2711.11

      10

      19.05

      9.05

      2681.48

      2

      9.35

      18.95

      9.6

      2844.44

      2780

      10.05

      18.95

      8.9

      2637.04

      9.45

      18.65

      9.2

      2725.93

      9.1

      18.5

      9.4

      2785.19

      9.7

      19.3

      9.6

      2844.44

      9.95

      19.55

      9.6

      2844.44

      3

      9.35

      18.95

      9.6

      2844.44

      2780

      10.05

      18.95

      8.9

      2637.04

      9.45

      18.65

      9.2

      2725.93

      9.1

      18.5

      9.4

      2785.19

      9.7

      19.3

      9.6

      2844.44

      9.95

      19.55

      9.6

      2844.44

      4

      9.35

      18.75

      9.4

      2785.19

      2767

      9.95

      19.35

      9.4

      2785.19

      9.1

      18.55

      9.45

      2800.00

      10.05

      19.05

      9

      2666.67

      9.7

      19.05

      9.35

      2770.37

      9.45

      18.9

      9.45

      2800.00

      5

      10

      19.55

      9.55

      2829.63

      2765.40

      10

      19.35

      9.35

      2770.37

      9.2

      18.65

      9.45

      2800.00

      10.45

      19.25

      8.8

      2607.41

      9.3

      18.7

      9.4

      2785.19

      10.3

      19.75

      9.45

      2800.00

      6

      9.3

      18.55

      9.25

      2740.74

      2767

      10

      19.15

      9.15

      2711.11

      9.2

      18.85

      9.65

      2859.26

      10.45

      19.59

      9.14

      2708.15

      10.3

      19.55

      9.25

      2740.74

      10

      19.6

      9.6

      2844.44

      7

      10.45

      19.75

      9.3

      2755.56

      2758

      10.3

      19.65

      9.35

      2770.37

      10

      19.45

      9.45

      2800.00

      9.3

      18.4

      9.1

      2696.30

      10

      19.1

      9.1

      2696.30

      9.2

      18.75

      9.55

      2829.63

      8

      10.45

      19.15

      8.7

      2577.78

      2780

      10.3

      19.8

      9.5

      2814.81

      10

      19.35

      9.35

      2770.37

      9.3

      18.7

      9.4

      2785.19

      10

      19.6

      9.6

      2844.44

      9.2

      18.95

      9.75

      2888.89

      9

      10.45

      19.15

      8.7

      2577.78

      2745

      10.3

      18.85

      8.55

      2533.33

      9.2

      19.1

      9.9

      2933.33

      10.3

      19.8

      9.5

      2814.81

      10

      19.6

      9.6

      2844.44

      10

      19.35

      9.35

      2770.37

      10

      9.3

      18.3

      9

      2666.67

      2733

      10

      19.5

      9.5

      2814.81

      9.2

      18.5

      9.3

      2755.56

      10.45

      19.15

      8.7

      2577.78

      10.3

      19.8

      9.5

      2814.81

      10

      19.35

      9.35

      2770.37

      Mixing time minute

      Empty Weight of cube mould

      Filled Weight

      Wet Weight

      Wet Density of concrete

      Wet Density of concrete

      Kg

      Kg

      Kg

      Kg/m3

      Kg/m3

      1

      10.3

      19.3

      9

      2666.67

      2686

      10

      19.1

      9.1

      2696.30

      9.2

      18.35

      9.15

      2711.11

      10.45

      19.4

      8.95

      2651.85

      9.3

      18.45

      9.15

      2711.11

      10

      19.05

      9.05

      2681.48

      2

      9.35

      18.95

      9.6

      2844.44

      2780

      10.05

      18.95

      8.9

      2637.04

      9.45

      18.65

      9.2

      2725.93

      9.1

      18.5

      9.4

      2785.19

      9.7

      19.3

      9.6

      2844.44

      9.95

      19.55

      9.6

      2844.44

      3

      9.35

      18.95

      9.6

      2844.44

      2780

      10.05

      18.95

      8.9

      2637.04

      9.45

      18.65

      9.2

      2725.93

      9.1

      18.5

      9.4

      2785.19

      9.7

      19.3

      9.6

      2844.44

      9.95

      19.55

      9.6

      2844.44

      4

      9.35

      18.75

      9.4

      2785.19

      2767

      9.95

      19.35

      9.4

      2785.19

      9.1

      18.55

      9.45

      2800.00

      10.05

      19.05

      9

      2666.67

      9.7

      19.05

      9.35

      2770.37

      9.45

      18.9

      9.45

      2800.00

      5

      10

      19.55

      9.55

      2829.63

      2765.40

      10

      19.35

      9.35

      2770.37

      9.2

      18.65

      9.45

      2800.00

      10.45

      19.25

      8.8

      2607.41

      9.3

      18.7

      9.4

      2785.19

      10.3

      19.75

      9.45

      2800.00

      6

      9.3

      18.55

      9.25

      2740.74

      2767

      10

      19.15

      9.15

      2711.11

      9.2

      18.85

      9.65

      2859.26

      10.45

      19.59

      9.14

      2708.15

      10.3

      19.55

      9.25

      2740.74

      10

      19.6

      9.6

      2844.44

      7

      10.45

      19.75

      9.3

      2755.56

      2758

      10.3

      19.65

      9.35

      2770.37

      10

      19.45

      9.45

      2800.00

      9.3

      18.4

      9.1

      2696.30

      10

      19.1

      9.1

      2696.30

      9.2

      18.75

      9.55

      2829.63

      8

      10.45

      19.15

      8.7

      2577.78

      2780

      10.3

      19.8

      9.5

      2814.81

      10

      19.35

      9.35

      2770.37

      9.3

      18.7

      9.4

      2785.19

      10

      19.6

      9.6

      2844.44

      9.2

      18.95

      9.75

      2888.89

      9

      10.45

      19.15

      8.7

      2577.78

      2745

      10.3

      18.85

      8.55

      2533.33

      9.2

      19.1

      9.9

      2933.33

      10.3

      19.8

      9.5

      2814.81

      10

      19.6

      9.6

      2844.44

      10

      19.35

      9.35

      2770.37

      10

      9.3

      18.3

      9

      2666.67

      2733

      10

      19.5

      9.5

      2814.81

      9.2

      18.5

      9.3

      2755.56

      10.45

      19.15

      8.7

      2577.78

      10.3

      19.8

      9.5

      2814.81

      10

      19.35

      9.35

      2770.37

      Cement OPC of 43 grade cement was used. Fine aggregate natural Godavari river sand was used. Coarse aggregate crushed angular 20 mm and 12 mm size were used; potable water was used to production of cement concrete of grade M20. Material used in following proportion (by weight, and nominal mix provisions of IS 456-2000) [1]

      Laboratory Proportion to produce M 20 grade concrete C:F.A:C.A:W/C RATIO (by weight)

      1:1.67:3.31:0.6

      Cement =10 Kg; Sand (F.A.) =16.7 Kg

      12 mm C.A= 8.30 Kg; 20 mm C.A. =24.80 Kg

      Water= 6 Ltr

      Properties of Fresh Concrete

      Concrete differs from conventional concrete in that its fresh properties are vital in determining whether or not it can be placed satisfactorily. The various aspects of workability which control its filling ability, its passing figure carefully controlled to ensure that its ability to be placed remains acceptable.

      Concrete is primarily strong in compression and in actual construction, the concrete is used in compression. Higher the compressive strength better is the durability. Bond strength also improves with the increase in compressive strength and is important in R.C.C. work. Compressive strength also indicates extent of control exercised during construction.

      Concrete was produced using nominal mix. Cube mould of size 15 x 15 x 15 cm was used. 10 Number of mixes was prepared by changing mixing time by minute. For each mix, six cubes were cast and kept for water curing. After water curing of 7 days and 28 days, compressive strength was recorded, after carrying compression test on cubes.

      All the observations regarding 7 days compressive strength, 28 days compressive strength, slump of concrete, compaction factor of concrete, wet and dry weight of concrete were presented in Table below.

      Table 1: Comparison for Various Mixes with Different Mixing Time and Weight Density of Concrete

      Mixing time (Minute)

      Dry Weight(cube)

      Dry Density

      28

      Days Dry Density

      Kg

      Kg

      Kg/m3

      1

      8.75

      2592.5

      2610

      8.7

      2577.7

      8.9

      2637.0

      8.75

      2592.5

      8.85

      2622.2

      8.9

      2637.0

      2

      9.1

      2696.3

      2684

      8.95

      2651.8

      8.7

      2577.7

      9.2

      2725.9

      9.15

      2711.1

      9.25

      2740.7

      3

      9.3

      2755.5

      2711

      8.9

      2637.0

      9.1

      2696.3

      9.2

      2725.9

      9.15

      2711.1

      9.25

      2740.7

      4

      9.15

      2711.1

      2696

      9.2

      2725.9

      9.05

      2681.4

      8.9

      2637.0

      9.2

      2725.9

      9.1

      2696.3

      5

      9.25

      2740.7

      2706

      9.2

      2725.9

      9.25

      2740.7

      9

      2666.6

      9

      2666.6

      9.1

      2696.3

      6

      9.1

      2696.3

      2706

      9.1

      2696.3

      9.2

      2725.9

      9.2

      2725.9

      9.1

      2696.3

      9.1

      2696.3

      7

      9.3

      2755.5

      2694

      9.05

      2681.4

      8.8

      2607.4

      9.15

      2711.1

      9.15

      2711.1

      9.1

      2696.3

      8

      9.45

      2800.0

      2726

      9.2

      2725.9

      9.1

      2696.3

      9.15

      2711.1

      9.1

      2696.3

      9.2

      2725.9

      9

      9.2

      2725.9

      2709

      9.2

      2725.9

      9.05

      2681.4

      9.15

      2711.1

      9

      2666.6

      9.25

      2740.7

      10

      9.15

      2711.1

      2721

      9.3

      2755.5

      9.35

      2770.3

      9.1

      2696.3

      9.2

      2725.9

      9

      2666.6

      Mixing time (Minute)

      Dry Weight(cube)

      Dry Density

      28

      Days Dry Density

      Kg

      Kg

      Kg/m3

      1

      8.75

      2592.5

      2610

      8.7

      2577.7

      8.9

      2637.0

      8.75

      2592.5

      8.85

      2622.2

      8.9

      2637.0

      2

      9.1

      2696.3

      2684

      8.95

      2651.8

      8.7

      2577.7

      9.2

      2725.9

      9.15

      2711.1

      9.25

      2740.7

      3

      9.3

      2755.5

      2711

      8.9

      2637.0

      9.1

      2696.3

      9.2

      2725.9

      9.15

      2711.1

      9.25

      2740.7

      4

      9.15

      2711.1

      2696

      9.2

      2725.9

      9.05

      2681.4

      8.9

      2637.0

      9.2

      2725.9

      9.1

      2696.3

      5

      9.25

      2740.7

      2706

      9.2

      2725.9

      9.25

      2740.7

      9

      2666.6

      9

      2666.6

      9.1

      2696.3

      6

      9.1

      2696.3

      2706

      9.1

      2696.3

      9.2

      2725.9

      9.2

      2725.9

      9.1

      2696.3

      9.1

      2696.3

      7

      9.3

      2755.5

      2694

      9.05

      2681.4

      8.8

      2607.4

      9.15

      2711.1

      9.15

      2711.1

      9.1

      2696.3

      8

      9.45

      2800.0

      2726

      9.2

      2725.9

      9.1

      2696.3

      9.15

      2711.1

      9.1

      2696.3

      9.2

      2725.9

      9

      9.2

      2725.9

      2709

      9.2

      2725.9

      9.05

      2681.4

      9.15

      2711.1

      9

      2666.6

      9.25

      2740.7

      10

      9.15

      2711.1

      2721

      9.3

      2755.5

      9.35

      2770.3

      9.1

      2696.3

      9.2

      2725.9

      9

      2666.6

      Figure 5: Graph of mixing time v/s wet density of concrete

      Figure 6: Graph of mixing time v/s wet density of concrete

      Graph was plotted to show values of wet density of concrete against water cement ratio. (Figure 6)

      Table 2: Comparison for Various Mixes with Different Mixing Time and Dry Density of Concrete

      Changing mixing time diagram was plotted in Figure below (Figure 7)

      Figure 7: Graph of Mixing Time v/s Dry density of concrete

      Figure 8: Graph of Mixing Time v/s Dry density of concrete

      Table 3: Comparison Different Mixing Time with Compaction Factor of Concrete Mixes

      mix

      Mixing time (Minute)

      Compaction factor

      1

      1

      0.957

      2

      2

      0.956

      3

      3

      0.946

      4

      4

      0.938

      5

      5

      0.937

      6

      6

      0.934

      7

      7

      0.944

      8

      8

      0.945

      9

      9

      0.948

      10

      10

      0.944

      Figure 9: Graph of Mixing Time v/s wet Compaction Factor

      Figure 10: Graph of Mixing Time v/s wet Compaction Factor

      Table 4: Comparison Different Mixing Time with slump of Concrete Mixes

      Mix

      Mixing time(minutes)

      Slump mm

      1

      1

      120

      2

      2

      118

      3

      3

      110

      4

      4

      93

      5

      5

      93

      6

      6

      90

      7

      7

      93

      8

      8

      94

      9

      9

      99

      10

      10

      107

      A graph was plotted to show variation in slump with change in mixing time below (Figure 11)

      Table 5: Comparison Different Mixing Time with Slump & Compaction Factor of Concrete Mixes

      Mixing Time

      Slump mm

      Compaction factor

      1

      120

      0.957

      2

      118

      0.956

      3

      110

      0.946

      4

      93

      0.938

      5

      93

      0.937

      6

      90

      0.934

      7

      93

      0.944

      8

      94

      0.945

      9

      99

      0.948

      10

      107

      0.944

      Concrete cubes of size 15×15×15 cm were tested after water curing of 7 days under Compression Testing Machine. Results obtained were recorded in Table below (Table 4). Compressive strength calculated and tabulated in Table below.

      Table 6: Comparison Mixing Time and Compressive Strength (7 Days) of Concrete

      150

      100

      50

      slump

      Mix

      Mixing time (Minute)

      Load kN

      Comp. Strength N/mm2

      Av. Comp. Strength N/mm2

      1

      1

      300

      13.33

      13.04

      300

      13.33

      280

      12.44

      2

      2

      340

      15.11

      16.15

      380

      16.89

      370

      16.44

      3

      3

      410

      18.22

      18.96

      420

      18.67

      450

      20.00

      4

      4

      410

      18.22

      19.26

      460

      20.44

      430

      19.11

      5

      5

      430

      19.11

      19.85

      420

      18.67

      490

      21.78

      6

      6

      440

      19.56

      20.15

      480

      21.33

      440

      19.56

      7

      7

      450

      20.00

      20.15

      490

      21.78

      420

      18.67

      8

      8

      430

      19.11

      20.00

      470

      20.89

      450

      20.00

      9

      9

      430

      19.11

      20.00

      430

      19.11

      490

      21.78

      10

      10

      470

      20.89

      19.85

      430

      19.11

      440

      19.56

      Mix

      Mixing time (Minute)

      Load kN

      Comp. Strength N/mm2

      Av. Comp. Strength N/mm2

      1

      1

      300

      13.33

      13.04

      300

      13.33

      280

      12.44

      2

      2

      340

      15.11

      16.15

      380

      16.89

      370

      16.44

      3

      3

      410

      18.22

      18.96

      420

      18.67

      450

      20.00

      4

      4

      410

      18.22

      19.26

      460

      20.44

      430

      19.11

      5

      5

      430

      19.11

      19.85

      420

      18.67

      490

      21.78

      6

      6

      440

      19.56

      20.15

      480

      21.33

      440

      19.56

      7

      7

      450

      20.00

      20.15

      490

      21.78

      420

      18.67

      8

      8

      430

      19.11

      20.00

      470

      20.89

      450

      20.00

      9

      9

      430

      19.11

      20.00

      430

      19.11

      490

      21.78

      10

      10

      470

      20.89

      19.85

      430

      19.11

      440

      19.56

      slump

      0

      1 2 3 4 5 6 7 8 9 10

      Figure 11: Variation slump of concrete with different Mixing Time

      Figure 12 shows comparison of slumps

      Figure 12: Comparison of slump of concrete with Mixing Time

      Figure 13: Graph of Mixing Time v/s Compressive Strength (7 Days)

      Figure 14: Graph of Mixing Time v/s Compressive Strength (7 Days)

      Table 7: Comparison Mixing Time and Compressive Strength (28 Days) of Concrete

      Mix

      Mixing Time

      Load (kN)

      Comp. Strength (N/mm2)

      Av. Comp. Strength (N/mm2)

      1

      1

      400

      17.78

      20.44

      540

      24.00

      440

      19.56

      2

      2

      600

      26.67

      25.04

      570

      25.33

      520

      23.11

      3

      3

      660

      29.33

      28.59

      670

      29.78

      600

      26.67

      4

      4

      670

      29.78

      30.96

      750

      33.33

      670

      29.78

      5

      5

      680

      30.22

      31.11

      760

      33.78

      660

      29.33

      6

      6

      680

      30.22

      31.26

      730

      32.44

      700

      31.11

      7

      7

      660

      29.33

      31.11

      710

      31.56

      730

      32.44

      8

      8

      620

      27.56

      29.63

      740

      32.89

      640

      28.44

      9

      9

      700

      31.11

      29.78

      650

      28.89

      660

      29.33

      10

      10

      740

      32.89

      29.63

      630

      28.00

      630

      28.00

      Figure 15: Graph of Mixing Time v/s Compressive Strength (28 Days)

      Figure 16: Mixing Time v/s Compressive Strength (28 Days)

      28 days compressive strength was calculated and tabulated in Table 5 above. Obtained value suggest as mixing time increases 28 Days Compressive Strength of concrete decreases

    3. CONCLUSION

From the results obtained & following observations it was concluded that the workability, compressive strength of concrete was higher when the mixing time is within 4 to 7 minutes.

  1. Slump Values

    1. For initial three minutes of mixing slump value is higher due to inadequate mixing time.

    2. From 4 to 7 minutes of mixing the slump value is better than that of other durations of mixing.

    3. From 8 to 10 minutes of mixing the slump value again increases due to segregation of concrete ingredients caused by prolonged mixing.

  2. Compaction factor

    1. For initial two minutes of mixing results shows higher values compaction factor. But due inadequate mixing, the concrete cannot be properly compacted.

    2. For final 2 minutes also, the results are higher due to inadequate compaction but due to segregation of material.

  3. Compressive Strength of Concrete

  1. For initial two to three minutes of mixing, results shows low values of compressive strength is due to adequate mixing

  2. For mixing time within 4 to 7 minutes the compressive strength was maximum

  3. Further mixing may result in lower strength probably due to segregation of concrete ingredients.

REFERENCES

  1. IS-456-2000 for Reinforcement Concrete

  2. CEMEX USA Technical Bulletin 9.1,2013,p.p. 1-5

  3. OMOTOLA ALAWODE. Effects of Water-Cement Ratios on the Compressive Strength and Workability of Concrete and Lateritic Concrete Mixes., et.al. The Pacific Journal of Science and Technology,

    Volume 12. Number 2. November,p.p.99-105

  4. KAMA; RAHMANIP.P. et.al. Effect Of Water Cement Ratio On Compressive Strength And Abrasion Of Microsilica Concrete, Middle-

    East Journal of scientific research 12(8),2012,p.p. 1056-1061

  5. M.B.Varma, Effect of change in water cement ratio on wet density, dry density, workability and compressive strength of M-20 grade concrete,IJMER,ISSN :2249-6645,Volume 5,Issue 10,October 2015,pp.43-59

  6. Effects of fresh concrete temperature and mixing time on compressive strength of concrete ,ACI, ACCESSION NO.00807536, Mahborb K.C., Cutshaw Q.A., 2001-1, pp 59-62