Determination of Appropriate Time Period to be used Analyzing Multiblock Tall Buildings

DOI : 10.17577/IJERTV8IS110260

Download Full-Text PDF Cite this Publication

Text Only Version

Determination of Appropriate Time Period to be used Analyzing Multiblock Tall Buildings

Mr. Sajeet S B Structural Engineer Bengaluru-560086, India

Mr. Janardhana K

Assistant Professor, Department of CivilEngineering PES University,Banashankari,

Bengaluru-560085, India,

Mr. Akshay K Uday

Post-graduate Student-M.Tech (StructuralEngineering), PES University,Banashankari,

Bengaluru-560085, India,

Abstract In present days, structures exceeding 45m in length are designed with one or more expansion joint, where the building are split into two or more and behaves independent. In this study as per the code IS 456-2000 or IS 3414(1968), the building is modeled with expansion joint over a podium in ETABS. Now, while entering the time period for static earthquake forces, in the multiblock tall buildings over podium, structural engineers face challenge to select the building from which the time period has to be selected. Structural engineers had different perspectives on choosing the appropriate time period. But, usual practice was to take the entire buildings plan ignoring the expansion joint. This study discusses how to determine an appropriate time period considering the expansion joint, which time period is to be used in analysing the multi-block tall buildings with an expansion joint over a podium. The time period obtained from the larger size plan should be considered for earthquake analysis of the building

KeywordsHorizontal dimensional, expansion joint, earthquake forces, time period

    1. INTRODUCTION Atimeperiod(denotedby'T')isthetimerequired for one complete cycle of vibration to pass in a given point. As the frequency of a wave increases, the time period of the wave decreases. The unit for time period is 'seconds'. Frequencyand timeperiod are in a reciprocal relationship that can be expressed mathematically as: T = 1/f or as: f

      =1/T

      An expansion joint or movement joint is an assembly designed to safely absorb the temperature-induced expansion and contraction of construction materials, to absorb vibration, to hold parts together, or to allow movement due to ground settlement or earthquakes.They are commonly found between sections of buildings, bridges, sidewalks, railway tracks, piping systems, ships, and otherstructures.

      Building faces, concrete slabs, and pipelines expand and contract due to warming and cooling from seasonal variation, or due to other heat sources. Before expansion joint gaps were built into these structures, they would crack under the stress induced.

    2. THE OBJECTIVES OF THIS STUDY CAN BELISTED AS FOLLOWS:

      • TostudytheEarthquakeresponseofRCC Tall Building with variation of time period inX directionfordifferenttypesofplansbyresponsespectrum analysis.(Individual modelanalysis)

      • TostudytheEarthquakeresponseofRCC Tall Building with variation of time period in y directionfordifferenttypesofplansbyresponse spectrum analysis. (Individual modelanalysis)

      • TostudytheEarthquakeresponseofRCC Tall Building with variation of time period in x & y direction for different types of plans by response spectrum analysis. (Individual model analysis)

      • To Identify the worst time period, when two different building are at samepodium.

    3. PRESENT STUDY

      In present days, the design industries face design failures. The structural engineers go through many possible works identifying the worsttimeperiodwhilemodelingtwodifferent model in a single plane. For instance, when we consider two buildings, where the height of the building remains same, but their plan size is different. Initially, considering two models in a single podium assuming anyone of the models time period was the usual method. Since, considering two buildings we obtain fourinputs of time period. Whereas, ETABS has optionsof only two input. Hence, we sequentially analyse individual model and compare the earthquake response of both the models. We have to identify worst earthquake response among the two models. Once identified, the worst earthquake response of a model, that is given as the input time period from that model and has to be taken for furtheranalysis.

    4. RESPONSE SPECTRUMANALYSIS

      The procedure to compute the peak response of structureduringtheearthquakedirectlyfromthe earthquake response spectrum without the need of time history analysis iscalled response spectrum analysis. A typical design response spectrum(IS-1893) is shown below inFigure 1.

      Fig 1: Design Response spectrum

      MODEL 1

      MODEL 3

      (PLAN SIZE) X=24m Y=40m

      T=.

      (sec)

      (PLAN SIZE) X=24m Y=40m

      as per IS 1893-2016 PART1 X=0.854

      Y=0.661 MODEL 4

      T=.

      (sec)

      as per IS 1893-2016 PART1 X=0.854

      Y=0.661 MODEL 2

      (PLAN SIZE) X=24m Y=48m

      T=.

      (sec)

      (PLAN SIZE) X=28m Y=40m

      as per IS 1893-2016 PART1 X=0.854

      Y=0.604

      T=.

      (sec)

      as per IS 1893-2016 PART1 X=0.790

      Y=0.661

      (PLAN SIZE) X=24m Y=40m

      T=.

      (sec)

      as per IS 1893-2016 PART1 X=0.854

      Y=0.661

      MODEL 6

      (PLAN SIZE) X=28m Y=48m

      (24 x 40 m) and (28 x 40 m) With 0.100m expansion joint

      MODEL 8

      T=.

      (sec)

      (24 x 40 m) and (28 x 48 m)

      as per IS 1893-2016 PART1 X=0.790

      Y=0.604

      With 0.100m expansion joint

      building Plan view combined model 7

      Building elevation view combined model 7

      Building isometric view combined model 7

      Building plan view combined model 8

      Building elevation view combined model 8

      Building isometric view combined model 8

      SEISMIC LOADING ZONE AS PER IS:1893- 2016(PART 1)

      MODEL TYPE

      ALL MODELS

      R

      3

      I

      1

      Z

      .10

      Sa/G

      Type2

      MA MODEL TYPE MATERIAL PROPERTIES

      TERIAL PROPERTI ALL MODELS

      Column

      M40

      Beam

      M25

      Slab

      M25

      MA MODEL TYPE MATERIAL PROPERTIES

      TERIAL PROPERTI ALL MODELS

      Column

      M40

      Beam

      M25

      Slab

      M25

      directional combination

      SRSS

      SRSS

      input response spectra

      1.2×9.81/2 x3

      1.2×9.81/2x 3

      eccentricity ratio

      0.05

      0.05

      directional combination

      SRSS

      SRSS

      input response spectra

      1.2×9.81/2 x3

      1.2×9.81/2x 3

      eccentricity ratio

      0.05

      0.05

      ES

      Density of concrete: 25 KN/m3

      Density of brick masonry: 21.20 KN/m3 Slab thickness: 120 mm

      Wall thickness: 230 mm

      STATIC LOAD ASSIGNMENT

      The loads considered are Dead Load, Live Load, Floor Finish, and Earth Quake Load. All models consist of these loads.

      Dead Load: The dead load of the structure is obtained from Table 1, Page 8, of IS 875 Part 1 1987. The permissible vaue for unit weight of reinforced concrete varies from 24.80kN/m3 to 26.50 kN/m3. From the table, the unit weight of concrete is taken as 25kN/m3. The software has a inbuilt DL calculator

      Self weight of the structural elements Floor finish = 1.5 kN/m2 and

      Wall load on all beams is 11 kN/m

      Imposed Load: The imposed load on the floor is obtained from Table 1 of IS 875 (Part 2) 1987. The uniformly distributed load on the floor of the building is assumed to be 4.0 kN/m2 (for assembly areas, corridors, passages, restaurants business and office buildings, retail shops etc). On roof 1.5 kN/m2, and

      On floors 3.5 kN/m2

      Earth Quake Load: The structure is assumed to be in Zone- II as per IS 1893 2016 (PART 1). So the zone factor is taken as per Table 2 of IS 1893 2002. The damping is assumed to be 5%, for concrete as per Table 3 of IS 1893- 2016 (PART 1).. Importance factor is taken as 1 as per Table 6 of IS 1893 2016 (PART 1).

      Zone II, Soil type II, Importance factor =1.2

      Load combinations: The load combinations is obtained from page no13, clause 6.3.1.2 of. IS 1893 2016 (PART 1)..

      DLEQX=1.2 (DL+LL+SPEC1) DLEQY=1.2(DL+LL+SPEC2)

    5. ANALYSIS INPUT

      TYPES

      All models

      All models

      R VALUE

      R=3

      R=3

      Function input

      0.1

      0.1

      spectrum case name

      Spec x

      Spec y

      structural and function damping

      0.05

      0.05

      model combination

      CQC

      CQC

      TYPES

      All models

      All models

      R VALUE

      R=3

      R=3

      Function input

      0.1

      0.1

      spectrum case name

      Spec x

      Spec y

      structural and function damping

      0.05

      0.05

      model combination

      CQC

      CQC

      Table below shows input for response spectra analysis for various types of models ,

      MODEL 1

    6. RESULTS

      TIME PERIOD OF MODEL 1

      STOREY DISPLACEMENT OF MODEL 1

      STOREY DRIFT OF MODEL 1

      MODEL 3

      STOREY SHEAR OF MODEL 1

      MODEL 7

      STOREY SHEAR OF MODEL 3

      TIME PERIOD OF MODEL 3

      STOREY DISPLACEMENT OF MODEL 7

      STOREY DISPLACEMENT OF MODEL 3

      STOREY DRIFT OF MODEL 3

      MODEL 8

      STOREY DRIFT OF MODEL 7

      STOREY DISPLACEMENT OF MODEL 8

      STOREY DIRIFT OF MODEL 8

    7. CONCLUSION

      Behaviour of earthquake in first phase shows that, as the dimensions of the building increases the time period will decrease but the modal time period increases. The earthquake response of the buildings like displacement, storey drift, and storey shear will increase.

      In second phase it is observed that as the dimensions of the building increases the time period will decrease but the modal time period also decreases as the orientation of columns are in horizontal direction. The earthquake response of the buildings like displacement, storey drift, and storey shear will increase.

      In third phase it is observed that as the dimensions of the building increases the time period will decrease but the modal time period increases. The earthquake response of the buildings like displacement, storey drift, and storey shear will increase.

      Considering the first three phases, it is concluded that the time period of the building with larger horizontal dimension is considered as the appropriate time period for the combined models in fourth phase.

    8. REFERENCES

  1. B.K Raghu Prasad, Sajeet S.B, Amarnath K ,2014,Optimum Earthquake Response Of Tall Buildings, Ijret: International Journal Of Research In Engineering And Technology, Volume: 03 Special Issue: 06,pp230-246

  2. C. G. Konapure , M. S. Muddiddi, 2018,Determination Of Time Period And Evaluation Of Seismic Response Of Framed Structure With Different Approaches, International Research Journal Of Engineering And Technology (Irjet), Volume: 05 Issue: 04,pp 956-960

  3. IS 1893, 2016. Indian Standard criteria for earthquake resistant design of structures (part 1): general provisions and buildings (fifth revision, Bureau of Indian Standards, New Delhi).

  4. IS 3414, 1968. Indian Standard code of practice for design and installation of joints in buildings (second reprint April 1978, Bureau of Indian Standards, New Delhi).

  5. IS 456-2000. Indian Standard plain and reinforced concrete-code of practice (fourth revision, Bureau of Indian Standards, New Delhi).

  6. LarilLawlineCutinha, Pradeep Karanth,2018, Study On Time Period As Per Is Code Using Etabs Software, International Journal Of Current Engineering And Scientific Research (Ijcesr),

    Volume-5, Issue-5,pp 40-44

  7. MehairYacoubian A, Nelson Lam A, Elisa Lumantarna A, John

    L. Wilson B,2017, Effects Of Podium Interference On Shear Force Distributions In Tower Walls Supporting Tall Buildings,Engineering Structures 148,pp 639659

  8. National building code of India 2016Volume 1(Bureau of Indian Standards, New Delhi).

  9. Nedunuri Vishnu Vardhan, Hemal J. Shah,2016, Seismic Analysis Of Podium Structure Using Static And Dynamic Methods, International Journal Of Scientific Development And Research (Ijsdr), Vol.01, Issue 4, 2016, pp 68-71.

  10. NilanjanTarafder, KamaleshBhowmik,K. V. Naveen Kumar,2015,Earthquake Resistant Techniques And Analysis Of Tall Buildings,(Ijret) International Journal Of Research In Engineering And Technology ,Volume: 04 Special Issue: 13 ,Pp 99-104

  11. S. S. Mishra, 2017, Time Period Estimation Of RC Frame Buildings Through Soil Stiffness Modelling, Springer, Issue 09, 2017, pp 303-310.

  12. Sayed Mahmoud, Horizontally Connected High-Rise Buildings Under Earthquake Loadings,2019, Ain Shams Engineering Journal Vol.10,pp 227241

  13. Sopna Nair ,Dr. G Hemalatha,Dr. P Muthupriya ,2017, Response Spectrum Analysis And Design Of Case Study Building,International Journal Of Civil Engineering And Technology (Ijciet), Volume 8, Issue 8, pp. 12271238

  14. Taiki Saito, 2016,Response Of High-Rise Buildings Under Long Period Earthquake Ground Motions,International Journal Of Structural And Civil Engineering Research Vol. 5, No. 4, pp 308- 314

  15. Tejas R. Chaudhari&Akash V. Modi , seismic analysis of podium structure considering bi-directional earthquake foorce,(2019),Global Journal Of Engineering Science And Researches,Vol 6,No. 4pp231-238

  16. Young-Soo Chun, And Moo-Won Hur,Effects Of Isolation Period Difference And Beam-Column Stiffness Ratio On The Dynamic Response Of Reinforced Concrete Buildings,2015, International Journal Of Concrete Structures And Materials, Vol.9, No.4, pp.439451

Leave a Reply