Analysis of Traffic Performance of NH79 Road, Rajasthan, India
Lasmar Garba1, Dr. Esar Ahmad1, Dr. Tanveer Ahmed Kazi2 1,2Department of Civil Engineering, Mewar University, Chittorgarh, Rajasthan. India
Abstract:- This research focused on analyzing the traffic performance of NH79 road from Chittorgarh/Bhilwara Rajasthan India. The road is currently a 2 way-direction with
3 lane carriageways in both the direction, after closely observation the problems identified, were traffic congestion, delay, prone to accident which associated with high traffic volume and inappropriate parking facilities. The parameters considered in this research were Capacity, Density, Saturation Ratio. After analysis conducted from the data collected, it was revealed that, the road section has an average daily capacity of 12609 veh/day and average hourly traffic flow of 1261veh/hour with average speed of 54 K.P.H. the traffic density of the road is 112vs/m, therefore based on the parameters evaluated it is concluded that road belongs to level of service E, this is because all the parameter are within the range service class E in compliances with the recommendation made in the (HCM, 2000), thus it is recommended that the NH79 section shall be facilitated with proper Planning due to the fact the road is still growing and changing, resulting in a more responsive and useful transportation process, also Management and Maintenance will immensely help for the road to sustain its life span without deterioration and provision of well-integrated Traffic control system especially in Gangrar town junction will reduce the level conduction, delay prone to accident and travel time of the drivers and other road user.
Keywords: Performance, Traffic, Volume, Parameters, Delay
1.0: INTRODUCTIONS
A times, the expressway with multiple lane was considered to be the answer to making of the traffic problems associated with road high volume. When a multiple lane is used as the form of control at road high volume, its geometric features are of great impact on its ability to properly carry out its intended function. Apart from queuing delays which occur due to heavy traffic at peak hours, the geometric features of expressway with multiple lane could cause delays at other times throughout the day, thereby affecting traffic performance significantly. Congestion, particularly on city streets and urban freeways continue to pose a serious problem to traffic engineers. However, construction of new roads or widening of existing ones may not always be the solution for relieving congestion since the capacity of urban roads are generally governed by that of their intersection; the solution might be to increase the capacity of critical intersection rather than constructing new roads or widening the entire length of the road way.
According to research by (1) on The Effect Analysis of Traffic Volume, Velocity and Density in Dr. Siwabessy Salobar Road, they found the street is considered to be one of the busy streets in ambon city with various vehicles
passing by along with the crowded pedestrian activities. Especially in the morning and evening hours, the flow analysis of Dr. siwabessy road traffic is said to have not experienced saturation because the ratio of volume to capacity has a value less than 1. Based on their study it was found out that both traffic flow from ambon city to Air sabolar or vice versa shows the dominant influence of vehicles speed (Us) on traffic density(D) compared to traffic volume factor(V), (1) generated a regression model of DR. siwabessy road the formula for ambon to air salobar is D=18.32-0.35Us + 0.024Q And that of air salobar to ambon is D=18.67-0.396Us+0.021Q where both have a very high correlation value of (R2=0.999). (2) found that the effective of management urban planning comes directly from the accurate data collections and analysis at various central business district (CBD), from the analysis of tanke- tipper intersection, they found that the existing capacity intersection is given as 4969Vph and practical capacity are Qp=4224Vph and 6676Vph as the new propose practical capacity. Also (2), research found that the video-graphy cost N8,700 while the manual counting method cost N 11,400, they further concluded that the tanke-tipper intersection operate level of service F which need a serious modification.
The operational performance of mengxi square rotary intersection in Zhenjiang, china was surveyed and analysed by (3) based on the following parameters which include vehicle velocity distribution, gap distribution and lane distribution which provide the basis for design and improving traffic flow on the rotary intersection, (3) concluded that the average velocity increase from lane 1, lane 2 to lane 3 also the average velocity for Light vehicles is much compared to that of Heavy vehicles for all the sections. According to Assessment study conducted by (4) at Baban Gwari roundabout a rotary intersection along katsina road in Kano metropolis of Kano state of Nigeria. it was observed that the roundabout experienced daily and frequent concurrent delay, accidents, queue built up at morning and evening peak hours.
2.0: NEED FOR THE RESEARCH
NH79 Road Chittorgarh/Bhilwara section is presently a 2- way with 3-lane carriageway in each direction in which traffic movement is very high mostly along gangrar because of a market presence. After closely observing the roads, the problems identified are high traffic volume which lead to traffic congestion because of crossing, inadequate parking facilities along gangrar market. Therefore, this study is necessary to explore the effects of the geometric features and traffic flow parameters as it
affects the traffic performance of NH79 Road, Chittorgarh/Bhilwaras section.
-
: AIM AND OBJECTIVES OF THE STUDY
-
: Aim
The aim of the research work is to analyse the traffic performance of NH79 road, Chittorgarh/Bhilwaras section.
-
: Objectives of the Study
The objectives of this study were
To conduct a preliminary survey on the existing features of Chittorgarh/Bhilwaras section of the NH79 road.
To Determine traffic volume of Chittorgarh/Bhilwaras section of the NH79 road.
To Determine Operational Performance most specifically on Chittorgarh/Bhilwaras section of the NH79 road.
-
: GENERAL DESCRIPTION OF THE STUDY AREA
The NH79 is the road which links Chittorgarh and Bhilwara district within Rajasthan (India). its also made up of rigid pavement having 2-way with 3-lane
carriageway in each direction, each carriage way is 4.2m and service lane which its currently under construction. other physical features of NH79 include
-
Roadway median: The roadway median in the NH79 has the height of 0.23m and width of 5m.
-
Drainage: Drainage is one of the most important features in any road because it drains water from
the road and discharge it to the discharging point, the drainage system along NH79 has the height of 0.6m and width of 1.43m
-
Pedestrian walkway: The pedestrian walkways was constructed to in compliances with the IRC Provision it has width of 2m and length of 0.25
-
Flyovers: There are currently 5 flyovers between gangrar to Chittorgarh four out of the five are
fully constructed while one is under construction.
-
Service lane: The service lane in NH79 is currently under construction about 1.5 km is
-
completed the service lane width is 7m
Figure 5.0: Portion of NH79 Road, Chittorgarh/Bhilwaras Section.>
average travel speed. Was determined by Procedures
5.0: METHODOLOGY
The methods employed to obtained the required data for this research includes; Preliminary survey on the existing features of the NH79 road section, Traffic Volume study on section of NH79 road. Which was determined manually by using the Procedures Observers were positioned at various cross section of the roadway, the number of vehicles that passes each observer was noted The vehicles timing was expressed in hourly periods and different type of vehicle was categories and record for ten hours, This was repeated for a week. The results were tabulated and from the methods employed the relevant parameters such as passengers car unit, Capacity, Density, Saturation Ratio were determined in order to assess the performance capacity of the road section used for the research. Also,
followed; The chosen distance was measured, the observer was stationed at initial point of measured distance, the specimen vehicle was identified, the time taken to reached the end point was noted, Then, the speed was calculated.
-
: ANALYSIS AND DISCUSSIONS OF RESULT
-
: Traffic Volume Count Result
Seven consecutive days traffic volume count was conducted for 10 hours count (08:00am- 06:00pm) at the NH79 Chittorgarh/Bhilwara Road Rajasthan India. The traffic volume of the vehicle recoded during the survey was converted to passengers car unit/equivalence using an appropriate conversion factors as stated in the Indian road congress (6). And the result was presented below.
20000
15000
10000
5000
0
MONDAY
TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY
20000
15000
10000
5000
0
MONDAY
TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY
Figure 6.1.1: Traffic Volume Count of Chittorgarh/Bhilwara
The result of the Traffic Volume Count in Figure above revealed that there is increased of traffic in volume in the morning hours and with the 09:00am-10:00am as the morning peak hours and also having the 3:00pm-04:00pm as evening peak hours this shows that there is high volume of traffic in both morning and evening hours and less
traffic during the mid-day hours, the average daily traffic obtained is 12609veh/day shows that the road is moderately dense in comparison with the recommendation of daily traffic volume stated Highway capacity manual (HCM 2000), therefore the road capacity can be seen as adequate.
3500
3000
2500
2000
1500
1000
500
0
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
SUNDAY
Figure 6.2: Passengers Car Unit of Bhilwara/Chittorgarh
the result of the Traffic Volume Count of Bhilwara- Chittorgarh presented above follsow similar trend with its counter direction having morning peak hour period of 09:00am-10:00am and 05:00-06:00pm as evening hours peak hour period, the average daily traffic obtained is
50000
40000
30000
20000
10000
0
10477veh/day shows that the road is highly dense in comparison of the recommendation of daily traffic volume stated Highway capacity manual (HCM 2000), therefore the road capacity can be seen as adequate.
CHITTORGAR H/BHILWARA
BHILWARA/C HITTORGARH
Figure 6.3: Annual Average Daily Traffic
The summary of annual average daily traffic obtained during the analysis can be seen that Bhilwara Chittorgarh has little higher value compared with the Chittorgarh to Bhilwara. And Tuesday with the highest value while Sunday having lowest value. This may be due to higher
population of people moving from the Chittorgarh to Bhilwara.
6.4: Traffic Density
Traffic density was evaluated and presented in the table and figure below
500
400
300
200
100
0
MONDAY
TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
SUNDAY
500
400
300
200
100
0
MONDAY
TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
SUNDAY
Figure 6.5: Traffic Density of Chittorgarh/Bhilwara
The result of the traffic presented above revealed that the road is highly dense in the morning hours between 08:00- 11:00am which correspond to morning peak hours while at the evening hours there it increased from 03:00-06:00pm with Wednesday having the highest value while Sunday
having the lowest value as shown in the figure above this happened due to variation of vehicles movement on the road. The daily density of this direction is 116vs/m and its within the range of the recommended value Highway capacity manual (HCM 2000),
400
300
200
100
0
MONDAY
TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
SUNDAY
400
300
200
100
0
MONDAY
TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
SUNDAY
Figure 6.6: Traffic Density of Bhilwara/Chittorgarh
The same nature of traffic movement obtained along the Bhilwara/Chittorgarh when compared with the other direction but the peak hours here is 9-10am while the densely hours occurred between 04:00-06:00pm during
200
150
100
50
0
midday hours there is less movement of traffic along the direction of the Bhilwara/Chittorgarh and the average daily density is 112vs/m and when its compared with the Highway capacity manual (HCM 2000),
MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY SUNDAY
Figure 6.7: Average Hourly Speed Chittorgarh/Bhilwara
The result of vehicles speed were presented above revealed that there is less speed during both morning and evening peak hours, which resulted from the high flow traffic during morning and evening hours respectively, while the
speed increases as the traffic flow decreases during mid- day (12:00pm to 03:00pm) this resulted from less movement of both commercial and private vehicle along the road.
150
100
50
0
MONDAY
TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
SUNDAY
150
100
50
0
MONDAY
TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY
SUNDAY
Figure 6.8: Average Hourly Speed Bhilwara/Chittorgarh
7.0: THE SPEED
The speed of the Bhilwara/Chittorgarh flow similar trend with that of Chittorgarh/Bhilwara the little difference is the average speed.
60
40
CHITTORGARH/ BILWARA
SPEED (kmp/h)
60
40
CHITTORGARH/ BILWARA
SPEED (kmp/h)
20
0
BILWARA/ CHITTORGARH
SPEED (kmp/h)
20
0
BILWARA/ CHITTORGARH
SPEED (kmp/h)
Figure 7.1: Average Speed of Moving Vehicles
The daily average speed of the vehicle which ranges from
46.8 to 54 K.P.H to conclude on the speed it can be categories as the level service E, It can be also be seen that the average speed of the vehicle is within the recommended speed of 50-60KPH Highway capacity manual (HCM 2000).
-
: Saturation Ratio
The saturation level is very negligible having an average value of 0.1 for each hour this can be has little impact on the level of service of the road.
-
: GENERAL DISCUSSION
The analysis preliminary conducted along the NH79 revealed that the road has high probability of accident this is because there is no any provision of traffic regulation the will guide vehicle and other road users such as pedestrian to the right path, also poor parking facilities is found to negate the smooth movement of vehicle due to rampant and irregular parking along the road side of the NH79 especially in gangrar junction market, this market proximity cause congestion, delay, and sometimes prone to accident potentialities along the road. the analysis of data of traffic volume count, traffic density, capacity, speed, level of saturation along the NH79 section revealed that the road has an average daily capacity 12609veh/day and average hourly traffic flow of 1261veh/hour with average speed of 4 K.P.H, the traffic density of the road is 112, therefore base on the parameters evaluated it can concluded that road can be level of service E this is because all the parameter are within the range with in compliances with the recommendation made in the (HCM, 2000).
-
: CONCLUSIONS
With the result discussed above, the following conclusions were drawn.
The preliminary survey conducted on the NH79 road section revealed that its made up of rigid pavement having 2-way with 3-lane carriageway in each direction, each carriage way is 4.2m and service lane which its currently under construction there is no any provision of parking facilities along the road especially in Rangarar town where there is tendency of high volume of daily traffic due to the presence of market and railway station.
Traffic volume study carried out along the road section revealed that the peak hour volume occurs Chittorgarh/Bhilwara in the morning (09:00am-10:00am) and evening (3:00pm-04:00pm) hours with average daily volume of 12609veh/day while Bhilwara/Chittorgarh direction has morning peak hour period between 09:00am to 10:00am and 05:00 to 06:00pm as evening hours peak hour period with an average traffic obtained is 10477veh/day respectively and less flow of traffic is experience during midday hours due to less movement of vehicles during the period which former conditions associated with less speed of and later conditions with an incremental speed of 53.5K.P.H. all falls within the recommended range of speed limit of 50-60K.P.H Highway capacity manual (HCM 2000).
Operational Performance or level of service of NH79 road section can be categories as E this is because the average speed is 53.5K.P.H the average daily traffic volume of 11543Veh/day an average traffic density of 114 as well as the saturation capacity of 0.1 therefore the road is within its good condition of operation using Highway capacity manual (HCM 2000).
9.0: FUTURE SCOPE/RECOMMENDATIONS
Based on survey and analysis of result, the following recommendations can be drawn from the study.
Planning: Although the NH79 road is still growing and changing, and undoubtedly many of the methods and procedures used today will be modified in the future, resulting in a more responsive and useful transportation process such as provision of parking facilities along in Rangarar, town.
Management and Maintenance: traffic management system is also important as the design of the road facilities itself, unless the system is adequately managed so to serve its function well. Therefore, there is need for the continuous maintenance to prolong the service life of the road.
Traffic control system: regulation of traffic by provision traffic signal system along the NH79 especially in Rangarar town junction will reduce the level conduction, delay prone to accident and travel time of the drivers and other road user.
10.0: REFERENCE
-
Selviana walsen, La mohamat (2017) The effect analysis of traffic volume, velocity and density in Dr. siwabessy salobar road. International journal of advanced Engineering Research and Science. Vol-4 issue 11, Nov. ISSN: 2349-6495
-
Jimoh Y.A, Itiola I. O. and Adeleke O.O. (2014) Traffic Performance Analysis and Cost Comparison of Data Collection Methods for an Urban Rotary. International journal of traffic and transportation Engineering(2014).
-
Ying Liu et,al (2013) Analysis of traffic operation performance at roundabouts. In
-
Govind Singh Chauhan, Auwal Alhassan Musa and Lasmar Garba (2020) performance assessments of rotary intersection capacity (case study of baban gwari round about) Compliance Engineering Journal Volume 11, Issue 2, 2020 Pp:207- 213
-
Highway capacity manual, HCM-2000. Transportation Research Board, Washington DC, 2000.
-
Guidelines For Capacity Of Urban Roads In Plain Areas IRC: 106-1990
-