66/11 Kv Distribution Substation Design

Malay1,Chintan2,Rahul3,Vishwas4 1,2,3,4B.Tech Electrical Engineering Indus University, Ahmedabad.

Gujarat, India.

Dr. Sweta Shap

5Asst. Professor

Indus University, Ahmedabad Gujarat, India

Abstract Over the decades, electricity demand has increased considerably. Electric energy is produced in power plants that are located far away from consumers. It is given for consumption through a vast network of transmission and distribution lines. In many places on the power grid, it may be desirable and necessary to modify some features of the power supply. This is accomplished by a suitable device assembly called a substation. Some characteristics of the power supply include voltage level, power factor, frequency, AC to DC, etc. are included. It is a major challenge to design such a modern complex structure keeping in mind all the design parameters.

Key words: Substation design, Autocad design,earthing

  1. INTRODUCTION

    Substations are an important part of the electrical system. The continuity of supply depends to a large extent on the proper functioning of substations. Therefore it is important to take great care while constructing substation and designing. Important points to keep in mind while planning the substation are as follows:

    It should be located at the appropriate site. If possible, it should be located near the load center.

    It should provide a safe and reliable system.

    For safety reasons, compliance with regulatory authorities is required to be taken into account.

    It should be easy to use and maintain.

    This should include a minimum capital cost.

    Bus bars are important components of substations. There are many repeated arrangements

    1. Single bus bar diagram

    2. There are simple bus bars

    3. main bus and transfer bar diagrams with sectioning diagrams.

    4. Double busbar diagram

    5. Diagram of main double bus and transfer bus

    6. Half circuit breaker system

  2. DESIGN OF 66/11KV, SUB-STATION

    Before choosing the nominal values of different devices in the substation and deciding their location in the substation, it is necessary to draw a single line diagram, also called a key diagram.

    Fig1-sld of 66Kv/11Kv Substation

    Here, the unique busbar arrangement with sectioning scheme is described in SLD. All images are created in AutoCAD software. Once the key diagram p is repaired, the configuration diagrams are drawn to show the actual state of each instrument's PLAN & SECTION configuration.

    This provision will reveal the physical condition of each piece of equipment. Distance between different devices.

      • Phase separation distance.

      • Phase land separation distance (horizontal).

      • Ground clearance phase (vertical).

        Interconnection between lines of the same voltage level, this allows the stations to distribute the power of different lines. Change of electrical energy, processors can switch between voltage levels to another. Thus, we can classify MV / LV substations on the networks on which they are used as well as the tasks they complete. Prior knowledge is required to obtain MV / LV stations:

      • Reference standard and regulator equipment (voltage, power quality, short-circuit power, etc.)

      • Linked to specific usage requirements

      • Obstacles, installation and environment; Second.

  3. 11/0.433 KV SUBSTATION

    The decision on MV or LV supply will depend on local conditions and considerations such as those mentioned above, and will usually be imposed by the utility. When it has been

    decided to provide power to MT, there are two widely followed procedures:

        • The electricity supplier builds a standard substation near the consumer's premises, but near the MV / LV transformer load center, the premises. Inside the transformer is located in the room.

        • The consumer builds and furnishes his substation in his own premises, from which the electricity supplier makes MV connection.

    1. Choice of job site:

      The consumer has to provide some data for public service from the first phase of the project. (Maximum expected power demand (KVA), site planning and elevation indicate the location of the proposed substation, the degree of continuity of supply required from the information provided by the consumer), the electricity supplier should indicate:

      • The type of supply proposed and defines the type of supply system: On a cable or underground network, a description of the service connection: service on a line, main ring installation or parallel feeder, and power limit (KVA) and fault current .

      • Nominal voltage and nominal voltage (the highest voltage for the device) Metering details that define: the cost and tariff details of the connection to the power network (consumption and fixed costs).

    2. The request for approval should include the following information, broadly based on the above preliminary discussions:

      • the location of the proposed post;

      • single-line diagrams of power circuits and connections, as well as proposed earthing circuits;

      • to establish all details of electrical equipment, including performance characteristics;

      • Arrangement of equipment and measurement components;

      • Provision to improve the power factor if necessary;

      • Provision of an emergency power plant (MV or LV) if necessary.

    3. For 66/11 kV substations, the following minimum electrical and safety clearances are required.

      Nominal System Voltage (kV)

      Highest System

      Phase And Earth (mm)

      Between Phases (mm)

      Safety Clearance (mm)

      Ground Clearance (mm)

      11

      12.1

      178

      230

      2600

      3700

      66

      72.5

      1970

      1830

      3660

      6400

      Table 1.1

      The design of the substation cannot be finalized without all selection and the design calculations for the equipment to be performed should be postponed and postponed until different items have been ordered and dimensions. Are not obtained from equipment suppliers.

      td>

      5.4

      Technical specification of General Equipments

      Sr. No.

      Description

      1

      Type

      2

      Service

      3

      Reference Standard

      4

      System Details

      4.1

      Rated Voltage

      4.2

      Nos. of phase s

      4.3

      Frequency

      4.4

      System Neutral Earthing

      5

      Insulation Level

      5.1

      HV terminal & earth kVp

      5.2

      Lightning Impulse withstand Voltage

      (1.2/50 s kVp)

      5.3

      Rated current KA rms

      Number of secondary winding

      6

      Temperature rise

      6.1

      Design Ambient Temperature

      6.2

      Maximum

      temperature rise

      7

      Short-time Withstand Current

      7.1

      Rated 1 or 3-second Current KA rms

      7.2

      Rated dynamic Current KA peak

      8

      Auxilia ry System

      8.1

      Motor

      8.2

      Control & Interloc k

      9

      Mounting

      10

      Terminal Connector type

      11

      Partial discharge level in pC

      12

      Creepage distance mm (based on

      31mm/kV)

      13

      Basic Impulsee level (B.I.L.) kV peak

  4. EARTHING SCHEME DESIGN

    The current earthing system in a substation takes the form of a grid or a mat consisting of several sections or rectangular traps of horizontally buried earthing conductors that are connected to multiple electrodes controlled at intervals. As shown in Fig.

    Fig 2- model of earthing grid

    The purpose of the earthing system is to provide as much surface as possible under and around a station, at a uniform potential and on a potential ground as close to or as absolute as possible. Ensure that:

    Total length of conductor in horizontal grid

    Lc

    M

    Peripheral length of grid

    Lp

    M

    RMS Current

    I

    Ka

    Maximum Allowable Temperature

    Tm

    °C

    Ambient Temperature

    Ta

    °C

    Reference Temperature for material constants

    Tr

    °C

    Thermal coefficient of resistivity at 0°C

    0

    1/°C

    Thermal coefficient of resistivity at reference temperature Tr

    r

    1/°C

    Resistivity of the ground Conductor at reference temperature Tr

    r

    .c m

    1/0 or ( 1/r) Tr

    K0

    °C

    Duration of Current

    tc

    Sec.

    Thermal capacity per unit volume

    TCAP

    J/(cm ³.°C)

    Total length of conductor in horizontal grid

    Lc

    M

    Peripheral length of grid

    Lp

    M

    RMS Current

    I

    Ka

    Maximum Allowable Temperature

    Tm

    °C

    Ambient Temperature

    Ta

    °C

    Reference Temperature for material constants

    Tr

    °C

    Thermal coefficient of resistivity at 0°C

    0

    1/°C

    Thermal coefficient of resistivity at reference temperature Tr

    r

    1/°C

    Resistivity of the ground Conductor at reference temperature Tr

    r

    .c m

    1/0 or ( 1/r) Tr

    K0

    °C

    Duration of Current

    tc

    Sec.

    Thermal capacity per unit volume

    TCAP

    J/(cm ³.°C)

    The most affected parameters for the design of earthing grids are:

      • fault current and duration.

      • Soil and surface resistivity in place of substation (soil structure and soil model).

      • Property and cross section of material used for conductors of earth mat.

      • Geometry of grounding mats (area covered by ground mats).

      • Touch and phase capability allowed

        Design Input Data

        Descripiton

        Notation

        Unit

        Symmetrical fault current in substation

        Ig

        A

        Duration of Shock for determining allowable body current

        ts

        Sec.

        Duration of fault current for sizing ground conductor

        tc

        Sec.

        Surface layer resistivity

        s

        -m

        Surface layer thickness

        hs

        M

        Grid reference Depth

        h0

        M

        Soil resistivity

        P

        -m

        Depth of ground Grid Conductors

        H

        M

        Length of Grid conductor in X Direction

        Lx

        M

        Length of Grid conductor in Y direction

        Ly

        M

        No. of Grid conductor in X Direction

        Nx

        Nos.

        No. of Grid conductor in Y direction

        Ny

        Nos.

        Spacing between parallel Conductors

        D

        M

        Length of Ground rod at each Location

        Lr

        M

        Number of rods placed in area

        nR

        Nos.

        Decrement factor for determining IG

        Df

        Equivalent earthing mat area

        A

        m2

        Total length of Buried Conductor=(LX X NY)+(LY X NX)+( Lr X Nr)

        L

        M

        Total length of ground rods

        LR

        M

        Equivalent impedance Zeq

        Zeq

        td>

        M

        Design Input Data

        Descripiton

        Notation

        Unit

        Symmetrical fault current in substation

        Ig

        A

        Duration of Shock for determining allowable body current

        ts

        Sec.

        Duration of fault current for sizing ground conductor

        tc

        Sec.

        Surface layer resistivity

        s

        -m

        Surface layer thickness

        hs

        M

        Grid reference Depth

        h0

        M

        Soil resistivity

        P

        -m

        Depth of ground Grid Conductors

        H

        M

        Length of Grid conductor in X Direction

        Lx

        M

        Length of Grid conductor in Y direction

        Ly

        M

        No. of Grid conductor in X Direction

        Nx

        Nos.

        No. of Grid conductor in Y direction

        Ny

        Nos.

        Spacing between parallel Conductors

        D

        M

        Length of Ground rod at each Location

        Lr

        Number of rods placed in area

        nR

        Nos.

        Decrement factor for determining IG

        Df

        Equivalent earthing mat area

        A

        m2

        Total length of Buried Conductor=(LX X NY)+(LY X NX)+( Lr X Nr)

        L

        M

        Total length of ground rods

        LR

        M

        Equivalent impedance Zeq

        Zeq

        The flow diagram and calculation sample for earthing is described above and below in which all the required parameters are represented by the design of earthing mats of substation 66. K. V.

        • Earthing grid conductor Area,

        • Cs Surface layer derating factor,

        • This is tolerable touch voltage of grid considering 50 kg person.

        • This is tolerable step voltage of grid considering 50 kg people.

        • Grid Resistance

          Typically, the site engineer specifies a grid resistance. Earth resistance should be as low as possible and should not exceed the following limits:

      • Power Stations-0.5 .

      • EHT Substations -1.0 .

      • 66/11 kV Stations -2.0 .

    If the ground resistivity is 800 ohm-meters or more, it will be difficult to obtain the desired low resistance of 1 to 2 ohm for a network station with a single grounding band. In such cases, it becomes necessary to increase the area of the grounding network. Simply increasing the amount of grounding tape may not help much to reduce the resistance of the grounding system, and the use of deeply driven rods may be unavoidable.

    Ground Potential rise (GPR) = (Maximum grid current Ig * Grid resistance Rg)

    Now compare GPR < E touch tolerable voltage If yes then DESIGN IS SAFE.

    If GPR > E touch

    Then Find (Estimated E mesh and E step) Estimated Mesh voltage,

  5. CONCLUSION

The Power Netvo RX will continue to grow and develop, so that the design of the substation evolves to meet the new requirements. The use of a grounding grid with specific spacing and the use of a lightning rod with shielding wire will reduce accidents and at the same time reduce post costs and protection against lightning strikes without affecting the safety of working personnel. Post respectively Therefore, the goal of lower installation and assembly costs, the ability to extend future loads, safer operation and easier maintenance, more reliability can be achieved with optimal design and performance. The substation can be improved.

REFERENCES

  1. Substation Design and Equipments by P.S.Satnam and P.V.Gupta.

  2. IEEE Std 80 -2013 on IEEE Guide for Safety in AC Substation Grounding.

  3. IEEE Std 998 -2012 on IEEE Guide for Direct Lightning Stroke Shielding of Substations.

  4. AutoCAD Software

  5. Case study on installation of OPGW cables for GETCO's 220 kV Transmission Line.

  6. A. S. Pabla, Electrical Power Distribution System, Tata McGraw-Hill,5th eiditon.

    Fig 3:- Earthing grid design

    • Estimated step Voltage:

Compare E mesh estimated < E touch tolerable,

If yes then Compare E step estimated < E step tolerable, if yes then DESIGN IS SAFE.

Otherwise, modify by increasing or decreasing spacing of conductor, Length of conductors or by increasing or decreasing number of rods and Calculate design parameter again.