Subcontracting Issues in Construction Companies of Gaza Strip
Ismail Al Daoor, Mahmoud Abu Fanoona , Samar Lulu, Abdalluh Al Shanty
Civil Engineering Department,
Faculty of Applied Engineering and Urban Planning, University of Palestine, Gaza, Palestine
Abstract- This Subcontracting is a common and well-established practice in the Palestinian construction industry. They are very important to the successful completion of most construction projects. Contractors enlist the services of subcontractors to achieve specific objectives, including obtaining cost and time reductions, securing access to specialized services, and risk sharing. A literature review highlights most issues related with subcontracting include the process of selecting subcontractors, Payment Issues, Safety Issues, Productivity Issues, Insurance Issues and Quality Issues. A questionnaire survey was administered to subcontractors, general contractors to investigate these issues and to determine the differences in perceptions between the parties. A seventy-eight questionnaire was distributed as follows: forty-six to contractors and thirty- two to subcontractors. Seventy-two questionnaires were received (90%) as follows: 44 (61.1%) from contractors, 28 (38.9%) from subcontractors. The results reveal the widespread use of subcontracting in the construction industry in Gaza Strip, primarily done to save time and money, and the results indicate that (1) the practices of selection and payments must be done prior to qualifying subcontractors (2) quality, productivity and safety issues are adequate from the view point of general contractors (3) General contractor should covers the sub- contractor in insurance issues and compensate them. The study recommended several actions to improve subcontracting practices in the construction industry in Gaza Strip.
Keywords; Construction Projects, Subcontractors, Practices, Gaza Strip
-
INTRODUCTION
Subcontracting is a common practice in the construction industry. On any particular project, it allows General Contractors to utilize a minimum work force in construction projects and encourage specialization. General contractors may rely on many subcontractors to perform specific tasks on their projects such as construction works, electrical works, plumbing works , roofing, insulation, and so on [1]. Ref [2] sees the subcontractor as a specialist hired by the main contractor to perform specific tasks on a project as part of the overall contract. Ref [3] illustrated that the importance of the subcontractors is due to that approximately 80% of the dollar value of construction is implemented by subcontractors
Although general contractors are commonly known to sublet portions of their work, subcontractors also sublet apportion of their contract to other specialized companies. Thus the process of subcontracting is an efficient and economical means of accessing necessary resources [4]. Nowadays, subcontracting has become a very common practice on many construction projects due to increase complexity of these projects. However, main contractors should be aware of the risks of subcontracting such as bad
performance of the subcontractors and the shortage of experienced workers.
Construction industry plays a major role in development and achievement the goals of society. So the prime contractors rely heavily on the specialized services of subcontractors to reduce costs and increase efficiency on construction Projects
.Through their specialized services; subcontractors execute specific tasks that prime contractors could not perform efficiently [5].
A series of study has been done to enhance the subcontracting practice such as: Bidding practices of subcontractors in Colorado [6]. Ref [4][7] discussed issues involved in subcontracting practices and improvement. In the paper [8] discussed improving sub-contractor selection process in construction projects. In [9], studied in their paper about safety performance of subcontractors in the Palestinian construction industry and they identified, evaluated, and ranked factors that influence safety performance of subcontractors in Palestine. The relationship between contractors and their subcontractors in the Gaza Strip [10],[11]. Subcontracting practices in the construction industry of Pakistan and factors influencing sub-contractors selection in construction projects respectively [12],[13]. The impacts of applying the multi-layer chain subcontracting system on project management performance with reference to Hong Kong construction industry.[14],[15]. In addition, an empirical analysis of the choices made by Japanese firms with respect to subcontracting status [16] The practice of multilayer subcontracting in Malaysian construction industry [17]
In the Palestinian construction industry, subcontracting practices are extensively used in all construction projects, but in recent years, the construction sector has been severely affected by the Palestinian division and the recurrent wars in the Gaza Strip, which in turn led to closures and severe restrictions on the movement of individuals and goods from and to the Gaza Strip, especially construction materials, which led to a significant reduction in trade, investment, and employment so subcontractor the issues regarding subcontracting are seldom acknowledged and addressed. A little research effort has been done to investigate the subcontracting common practices of Gaza Strip contracting companies. Therefore, it is important to explore and evaluate these practices under specific conditions. The aim of this research to investigate the local issues subcontracting practices in contracting comprise in Gaza strip, identify the major problem areas and explore the overall satisfaction with subcontractor practice in Gaza strip. In addition, improve practices of sub-contractors in construction industry in Gaza
Strip regarding issues related to selection, payment, safety, productivity, quality, and insurance.
-
RESEARCH METHODOLOGY
The research is conducted through the following stages: The researchers will review the relevant literature on the subject regarding subcontracting practices in the construction industry of Gaza strip, regarding issue related to selection, payment, safety, productivity, quality, and insurance.
It will take the form of structured questionnaire with experts in the field of subcontracting practices in the construction industry of Gaza strip. Those experts will include project's managers, contractors, and subcontractors. This pilot study will be the pre-stage to develop the final form of questionnaire. In this stage of the pilot study, there will be an amendment, modifications, omission, addition or developments of the questionnaire to be ready for the final stage of distribution.
After the development of questionnaire based on the structured interview and pilot studies, the questionnaire will be distributed among the contractors and subcontractors in this field to obtain their perspectives regarding the mentioned aspects of the subcontracting practices in the construction industry of Gaza strip. Statistical analysis and tests will be conducts by using (SPSS) program. It is expected that this study will provide some clarifications for the different aspects of the subcontracting practices in the construction industry of Gaza strip.
The main source of input data to this research is the data gathered from literature and through the questionnaire surveys that distributed to construction companies holding a valid registration from the contractors union within the Gaza Strip. The study is limited to Gaza strip contracting companies that are classified as first, second, third, fourth, and fifth categories, which have a valid registration in PCU. As such, the size of population for all categories is 303 companies. Seventy-eight copies of the questionnaire were distributed to contractors and subcontractors in Gaza Strip. Seventy two questionnaires were answered and received, which represents 90 % response rate as shown in table 1.
TABLE 1: SAMPLE SIZE AND RESPONSE RATE OF THE STUDY POPULATIONS
Total Population
Calculated Sample Size
Distributed questionnaire
Number of respondents
Response Rate
303
75
78
72
90%
In order to be able to select the appropriate method of analysis, the level of measurement must be understood. For each type of measurement, there is/are an appropriate method/s that can be applied and not others. In this research, ordinal scales were used. Ordinal scale is a ranking or a rating data that normally uses integers in ascending or descending order. The numbers assigned to the important (1, 2, 3, 4, 5) do not indicate that the interval between scales are equal, nor do they indicate absolute quantities. They are merely numerical labels. Based on likert scale we have the following in the table 2.
TABLE 2: LIKERT SCALE
Item
Strongly agreed
Agreed
Do not Know
Disagree d
Strongly disagree d
Scale
5
4
3
2
1
80-100%
60-79%
40-59%
20-39%
0-19%
The distribution of the responses obtained in the two surveys administered to general contractors and subcontractor. Fortunately, the response rate was 61.1% for contractors and 38.9% for subcontractors as shown in Table 3. Also, the table illustrates the year of experience of respondents. 13.9% from the respondents have years of experience less than 5 years, 29.2% from the respondents have years of experience 5-10 years, 36.1% from the respondents have years of experience 11-20 years and 20.8% from the respondents have years of experience more than 20 years.
TABLE 3. CHARACTERISTICS OF RESPONDENTS
General Information
No of Respondents
Percent
%
Nature of the Work
General contractor
44
61.1
Sub-contractor
28
38.9
Years of Experience
Less than 5 years
10
13.9
5 – less than 10 years
21
29.2
11 – less than 20 years
26
36.1
20 years and over
15
20.8
Annual average value of the projects (U.S. $)
Less than 250 thousand $
5
29.2
250 – less than $ 500 thousand
15
20.8
500 – Less than 1 million $
18
25
1 million $ and more
18
25
The number of employees (permanent)
5 or less employees
14
19.4
6-10 employees
26
36.1
11-20 employees
12
16.7
More than 20 employees
20
27.8
However, the table is noticed that 29.2% of the respondents have executed projects with a value less than 250 thousand dollar, 20.8% between 250 – less than 500 thousand dollar,25% from 500 to less than one million dollars, and 25% more than one million dollars. In addition, the table shows the number of employees (permanent) in the company. It shows that 19.4% of the responded companies have number of employees less than 5 employees, 36.1% of them have 6-10, 16.7% of them have 11-20 and 27.8% of them have more than 20 employees.
In other hand, the type of work and classification of the respondents contracting companies is presented in Fig.1&2
19.00%
23.90%
3.80%
28.80%
24.50%
done on time" might occupied the first rank with percent weight (85.6%), and "The ability to get the job done on time" might occupied the second rank with percent weight (79.2%).
On the other hand, it is shown that the "Flexibility and cooperation in the event of delay" and "Personal relationships" are the two lowest items of subcontractor selection process
Buildings Roads
Water and sewer Electro Mechanical Others
FIGURE (1), TYPE OF WORK CONTRACTING COMPANIES
18.60%
0
25.40%
18.60%
0
25.40%
29.40%
29.40%
26.60%
26.60%
First Class A
Second Class
First Class B
Thirth Class
First Class A
Second Class
First Class B
Thirth Class
FIGURE (2), CLASSIFICATION OF THE CONTRACTING COMPANIES
-
RESULTS ANALYSIS
3.1 Subcontracting practices
3.1.1 The reasons for the use of subcontracting
Table (4) shows the opinions of the respondents about the reason of subcontracting to weight. The respondents rank "Save Time" and "Reduce Risk" are the two highest reasons for using subcontracting, which "Save Time" might occupied the first rank with percent weight (80%), and "Reduce Risk" might occupied the second rank with percent weight (74.4%).
On the other hand, it is shown that the Lack of specialized skills in the company" and " Traditional" are the two lowest reasons for using subcontracting, which "Lack of specialized skills in the company" might occupied the penultimate rank with percent weight (69.4%) and " Traditional" might occupied the last rank with percent weight (67.8%).
TABLE 4: THE REASONS FOR THE USE OF SUBCONTRACTING
NO
Item
Mean
Std. Dev
%
weight
Rank
1.
Traditional
3.3889
1.181
67.8
9
2.
Lack of specialized skills in the company
3.4722
1.0342
69.4
8
3.
Reduce cost
3.5694
1.1847
71.4
6
4.
Reduce risk
3.7222
1.1286
74.4
2
5.
Save time
4
1.0481
80
1
6.
Absorb fluctuations in prices
3.7083
0.9991
74.2
3
7.
Maintaining a good relationship
3.625
0.7950
72.5
5
8.
The ability to control working hours
3.6389
1.0112
72.8
4
9.
Get the highest quality
3.5417
1.0738
70.8
7
-
Subcontrctor Selection Process
Table (5) shows that respondents rank "The ability to get the job done on time" and "Experience in the construction industry laws" are the two highest items of subcontractor selection process practice, which "The ability to get the job
practice, which " Flexibility and cooperation in the event of delay" might occupied the penultimate rank with percent weight (70.8%) and "Personal relationships" might occupied the last rank with percent weight (64.4%).
TABLE 5: SUBCONTRACTOR SELECTION PROCESS
No
Item
Mean
Std. Dev
%
Weight
Rank
1.
The ability to get the job done on time
4.2778
0.6329
85.6
1
2.
Flexibility in the terms and conditions of payments
3.8611
1.0251
77.2
5
3.
The terms of the tender price
3.7778
0.9960
75.6
7
4.
Resources subcontractors
3.6528
0.90631
73.1
9
5.
Financial stability (stability of Payments)
3.9028
0.9217
78.1
3
6.
Complete the work within a budget
3.8056
0.9440
76.1
6
7.
Flexibility and cooperation in the event of delay
3.5417
1.1251
70.8
12
8.
Personal relationships
3.2222
1.1161
64.4
13
9.
Past failures
3.6389
1.1171
72.8
10
10.
Compliance with quality specifications
3.9028
1.0767
78.1
4
11.
Experience in the construction industry laws
3.9583
0.9991
79.2
2
12.
Safety awareness in the workplace
3.7222
1.2012
74.4
8
13.
Cooperation between subcontractors in the project
3.5694
1.0724
71.4
11
Table.6 shows that the respondent opinions about improvement of subcontractor selection process practice, the results indicates that "Must be done prior to qualifying subcontractors" might occupied the first rank with percent weight (78.9%), and "Must submit a quote for subcontractors to contractors during the period specified key " might occupied the second rank with percent weight (77.8%).
On the other hand, it is shown that the "union contractors should reduce post the winners in the previous bidding" and "Experience in the construction industry laws" are the two lowest ways to improve the "subcontractor selection process", which "union contractors should reduce post the winners in the previous bidding" might occupied the penultimate rank with percent weight (70.6%) and "No need to improve the practice" might occupied the last rank with percent weight (51.4%).
TABLE 6: IMPROVEMENT OF SUBCONTRACTOR SELECTION PROCESS PRACTICE
No
Item
Mean
Std. Dev
%
weight
Rank
1.
Union contractors Should reduce post the winners in the previous bidding
3.527
1.266
70.6
5
2.
That the owner request a list of subcontractors
3.708
0.9106
74.2
4
3.
Must submit a quote for subcontractors to contractors during the period specified key
3.888
0.8968
77.8
2
4.
Must be done prior to qualifying subcontractors
3.944
0.7670
78.9
1
5.
Must be sent subcontractors offers fair prices
3.805
0.9137
76.1
3
6.
No need to improve the practice
2.569
1.136
51.4
6
-
Payments Issues
Table.7 shows that the "Dues pay subcontractors on time between the parties" is the highest item for payments issues, which might occupied the first rank with percent weight (82.5%).Its because of the nature of the political and economic situation in Gaza strip that leads to delays in payments to main contractors.
On the other hand, it is shown that the "The sub- Contractor shall submit bank guarantees items and bookings to cover any disruption in payments" is the lowest item for payments issues, which might occupied the penultimate rank with percent weight (71.7%).
TABLE 7: PAYMENTS ISSUES
No
Item
Mean
Std. Dev
%
weight
Rank
1.
Contractors pay dues on time
4.0417
1.067
80.8
2
2.
Dues pay
subcontractors on time between the parties
4.125
1.02
82.5
1
3.
The sub-contractor shall submit bank guarantees -items and bookings to cover any disruption in payments
3.583
0.9604
71.7
3
Table.8 shows that the respondent opinions about improvement of payments issues practice, the results indicates that "Sub-contractor should negotiate with the general contractor on how payments before signing the contract" might occupied the first rank with percent weight (88.3%), and "owner should pay for general contractors on time" might occupied the second rank with percent weight (83.1%).
On the other hand, it is shown that the "Subcontractor should submit higher price to cover the losses from delayed payments" and "No need to improve the practice" are the two lowest ways to improve the payments issues practice, which "Subcontractor should submit higher price to cover the losses from delayed payments" might occupied the penultimate rank with percent weight (67.5%) and "No need to improve the practice" might occupied the last rank with percent weight (50.8%).
TABLE 8: IMPROVEMENT OF "PAYMENTS ISSUES" PRACTICE
No
Item
Mean
Std. Dev
%
weight
Rank
1.
Sub-contractor should negotiate with the general contractor on how payments before signing the contract
4.4167
0.7071
88.3
1
2.
Sub-contractor should not work with the general contractor in late payments
3.5556
0.9625
71.1
4
3.
Sub-contractor shoul examine the financial statues of general contractor before entering the tender
3.8611
0.9390
77.2
3
4.
Subcontractor should submit higher price to cover the losses from delayed payments
3.375
1.118
67.5
5
5.
Owner should pay for general contractors on time
4.1528
0.8334
83.1
2
6.
No need to improve the practice
2.5417
1.162
50.8
6
-
Safety Issues
Table.9 shows that the "Sub-contractors adhere to safety procedures in the workplace" is the highest item for safety issues with percent weight (81.7%). On the other hand, it is shown that the "General contractors consider subcontractors 'safety performance before they enter into a subcontracting agreement is the lowest item for safety issues with percent weight (79.7%).
TABLE 9: SAFETY ISSUES
No
Item
Mean
Std. Dev
%
weight
Rank
1.
General contractors consider subcontractors 'safety performance before they enter into a subcontracting agreement
3.986
1.106
79.7
2
2.
Sub-contractors adhere to safety procedures in the workplace
4.083
.8005
81.7
1
Table.10 shows that the respondent opinions about improvement of safety issues practice, the results indicates that "General Contractor should provide full time safety director" might occupied the first rank with percent weight (86.4%), and "Subcontractor should create safe work environment" might occupied the second rank with percent weight (74.4%).
On the other hand, it is shown that the "Ministry of Labor should clearly define the sub-contractor responsibility for safety " and " No need to improve the practice " are the two lowest ways to improve the Safety issues practice, which "Ministry of Labor should clearly define the sub-contractor responsibility for safety" might occupied the penultimate rank with percent weight (81.1%) and "No need to improve the practice" might occupied the last rank with percent weight (43.6%).
TABLE 10: IMPROVEMENT OF SAFETY ISSUES PRACTICE
No
Item
Mean
Std. Dev
%
weight
Rank
1.
Subcontractor should create safe work environment
4.250
0.8680
85.0
2
2.
Sub-contractor should improve the performance of the safety program
through the development of a plan for safety
4.222
0.7911
84.4
3
3.
General Contractor should provide full time safety director
4.319
0.8692
86.4
1
4.
Applying effective training and increasing awareness of safety precautions
4.138
0.9539
82.8
4
5.
Ministry of Labor should clearly define the sub- contractor responsibility for safety
4.055
0.8539
81.1
5
6.
No need to improve the practice
2.180
1.1174
43.6
6
-
Productivity Issues
Table11 shows that the respondent opinions about the factors that lead to low productivity of subcontractors. The findings indicated that Lack of equipment and machines" might occupied the first rank with percent weight (86.4%), and "Lack of materials" might occupied the second rank with percent weight (74.4%). The lack of materials and equipments due to the political conditions that the Gaza Strip suffers from a siege and closure that prevents the entry of certain equipment and materials to the local market.
On the other hand, it is shown that the "Lack of control of workers" and "Supervision" are the two lowest items of Productivity issues practice, which "Lack of control of workers" might occupied the penultimate rank with percent weight (81.1%) and "Supervision" might occupied the last rank with percent weight (43.6%).
TABLE 11: PRODUCTIVITY ISSUES
No
Item
Mean
Std. Dev
%
weight
Rank
1.
The relationship between workers
3.972
0.9782
79.4
5
2.
Supervision
3.638
1.2705
72.8
8
3.
Delay delivery of materials
4.055
1.0331
81.1
3
4.
Lack of equipment and machines
4.277
0.8916
85.6
1
5.
Adverse weather conditions
4.000
0.8558
80.0
4
6.
Change the specifications and drawings at work
3.750
1.1227
75.0
6
7.
Lack of control of workers
3.652
1.0636
73.1
7
8.
Lack of materials
4.125
1.1978
82.5
2
Table.12 shows that the respondent opinions about improvement of productivity issues practice, the results indicates that "Organize work sites" might occupied the first rank with percent weight (89.2%), and "Motivate workers" might occupied the second rank with percent weight (84.4%).
On the other hand, it is shown that the "Subjecting workers to vocational training" and "No need to improve the practice" are the two lowest ways to improve the "subcontractor selection process", which " Subjecting workers to vocational training " might occupied the penultimate rank with percent weight (76.4%) and "No need to improve the practice" might occupied the last rank with percent weight (41.9%).
TABLE 12: IMPROVEMENT OF PRODUCTIVITY ISSUES PRACTICE
No
Item
Mean
Std. Dev
%
weight
Rank
1.
Organize work sites
4.458
0.6486
89.2
1
2.
Motivate workers
4.222
0.9527
84.4
2
3.
Try to reduce accidents in project site
4.111
0.8484
82.2
4
4.
Strengthening the capacity of compatibility between workers
3.986
1.0413
79.7
5
5.
Subjecting workers to vocational training
3.819
0.9393
76.4
6
6.
Close coordination between contractors, subcontractors
4.111
0.8316
82.2
3
7.
No need to improve the practice
2.097
1.0897
41.9
7
-
Quality Issues
Table 13 shows that the "The main contractor takes into account the standards and specifications required for quality" is the highest item for Quality issues with percent weight (80.8%). The importance of this factor is because the commitment of the contractors to the standards and specifications required for quality of the project make it easier for the subcontractor and manager to control and manage them correctly.
On the other hand, it is shown that the "Sub-contractor takes into account the price at the expense of quality" is the lowest item for safety issues with percent weight (61.9%).
TABLE 13: QUALITY ISSUES
No
Item
Mean
Std. Dev
%
weight
Rank
1.
The main contractor takes into account the standards and specifications required for quality
4.041
1.0933
80.8
1
2.
Sub-contractor takes into account the price at the expense of quality
3.097
1.1525
61.9
2
Table.14 shows that the respondent opinions about improvement of quality issues practice, the results indicates that "The use of skilled labor" might occupied the first rank with percent weight (87.8%), and "Quality Workmanship" might occupied the second rank with percent weight (85.6%).
On the other hand, it is shown that the " Higher contract price" and "No need to improve the practice" are the two lowest ways to improve the Quality issues practice, which "Higher contract price" might occupied the penultimate rank with percent weight (67.2%) and "No need to improve the practice" might occupied the last rank with percent weight (47.5%).
TABLE 14: IMPROVEMENT OF "QUALITY ISSUES" PRACTICE
No
Item
Mean
Std. Dev
%
weight
Rank
1.
Coordination between contractors, subcontractors
4.222
0.7911
84.4
3
2.
Quality Workmanship
4.277
0.7547
85.6
2
3.
Experience in the construction industry
4.111
0.7032
82.2
6
4.
The quality of the materials used
4.208
0.9183
84.2
5
5.
The effectiveness of team work
4.208
0.9028
84.2
4
6.
Training of
supervisors
3.972
0.8876
79.4
9
7.
Training of
construction workers
4.027
0.8876
80.6
8
8.
The use of skilled labor
4.388
0.8484
87.8
1
9.
More quality-control engineers
4.041
1.2153
80.8
7
10.
Higher contract price
3.361
1.2593
67.2
10
11.
No need to improve the practice
2.375
1.1437
47.5
11
-
Insurance Issues
Table.15 shows that the "General contractors shift insurance responsibility to subcontractors "is the highest item for Insurance issues with percent weight (76.7%). On the other hand, it is shown that the "General contractors shift insurance responsibility to subcontractors "is the lowest item for Insurance issues with percent weight (60.3%).
TABLE 15: INSURANCE ISSUES
No
Item
Mean
Std. Dev
%
weight
Rank
1.
General contractor
covers the sub- contractor in insurance
3.833
.99293
76.7
1
2.
General contractors shift insurance responsibility to subcontractors
3.014
1.0138
60.3
2
Table16 shows that the respondent opinions about improvement of insurance issues practice, the results indicates that "Responding to insurance issues" might occupied the first rank with percent weight (83.3%), and "Should provide additional insurance for subcontractors" might occupied the second rank with percent weight (77.8%).
On the other hand, it is shown that the "Avoid compensate subcontractors widely" and "No need to improve the practice" are the two lowest ways to improve the "Avoid compensate subcontractors widely" might occupied the penultimate rank with percent weight (58.3%) and "No need to improve the practice" might occupied the last rank with percent weight (42.2%).
TABLE 16: IMPROVEMENT OF "INSURANCE ISSUES PRACTICE
No
Item
Mean
Std. Dev
%
weight
Rank
1.
Responding to insurance issues
4.166
0.8558
83.3
1
2.
Should provide additional insurance for subcontractors
3.888
0.9866
77.8
2
3.
Avoid compensate subcontractors widely
2.916
1.2643
58.3
4
4.
Subcontractors should educate their staff about insurance in contract language
3.833
0.9344
76.7
3
5.
No need to improve the practice
2.111
1.0421
42.2
5
-
-
CONCLUSION
The focal point of this study was to investigate and examine the subcontracting practices in constructing companies in Gaza Strip. Furthermore, to improve the existing subcontracting practices were identified six issues: Subcontractor selection process, payments issues, safety issues, productivity issues, quality issues, and insurance issues.
From the study, save time and reduce risk for the project are the important reasons for using of subcontracting between contractor and subcontractor. Moreover, Subcontractor Selection Process consider The ability to get the job done on time, Must be done prior to qualifying subcontractors, Estrangement on Flexibility and cooperation in the event of delay. Therefore, the owners & Contractors should pay dues on time; Subcontractor should create safe work environment & Organize work sites. The main contractor must be taken into account the standards and specifications required for quality.
REFERENCES
McCord, P. and Gunderson, D.E. (2013), Subcontractor Perspectives: Factors that Most Affect Their Relationships with General Contractors
-A Pacific Northwest Study, 49th ASC Annual International Conference Proceedings.
Hoban, A.M. and Francis, V.E Improving contractor/ subcontractor relationships through innovative contracting, in Uwakwe, B.O. and Minkharah, I.A. (eds) Construction Innovation and Global Challenges, 10th International Symposium on the Organisation and Management of Construction, Cincinnati, Ohio, CRC Press, New York, 9 13September, 2003.2(2),7718.
Manuel, K.M., Legal Protections for Subcontractors on Federal Prime Contracts, Congressional Research Service,2014, 7-5700.
Arditi, D. ,and Chotibhongs, R. "Issues in subcontracting practice." J.Constr.Eng.Manage.,2005.131(8),866876.
Markowitz, J.L. "Exploratory study of subcontracting." M.S. thesis,
Univ. of Florida, Gainesville, FL.2007
Shash, A.A., Bidding practices of subcontractors in Colorado, Journal of Construction Engineering and Management, (ASCE) 1998.Vol. 124, No. 3.
Kumaraswamy, M. M., and Matthews, J. D., Improved subcontractor selection employing partnering principles, Journal of Construction Engineering and Management, (ASCE) 2000.Vol. 16, No.3, pp.4757.
Arslan , G., Kivrak , S., Birgonul, M.T. and Dikmen, I.," Improving subcontractor selection process in construction projects": Web-based subcontractor evaluation system (WEBSES), Automation in Construction, 2008.Vol. 17, pp. 480-488.
Enshassi, A., Choudhry, R.M., Mayer, P.E. and Shoman, Y., Safety Performance of Subcontractors in the Palestinian Construction Industry. Journal of Construction in Developing Countries, 2008.Vol. 13, No. 1.
Tayeh, B.A., The Relationship Between Contractors and Their Subcontractors in . Unpublished masters thesis, Islamic university, Gaza, Palestine. 2009.
Enshassi, A. and Medoukh, Z, "The contractorsubcontractor relationship": the general contractors view.2007.
Choudhry, R. M., Hinze, J. W., Arshad, M., & Gabriel, H. F. Subcontracting practices in the construction industry of Pakistan. Journal of Construction Engineering and Management, 2012. 138(12), 1353-1359.
Marzouk, M. M., El Kherbawy, A. A., & Khalifa, M. Factors influencing sub-contractors selection in construction projects. Hbrc Journal, 2013. 9(2), 150-158.
Tam, V. W., Shen, L. Y., & Kong, J. S.. Impacts of multi-layer chain subcontracting on project management performance. International Journal of Project Management, 2011.29(1), 108-116.
Chiang, Y.H., Subcontracting and its ramifications: "A survey of the building industry in Hong Kong", International Journal of Project Management.2008.
Kimura, F."Subcontracting and the performance of small and medium firms in Japan." Small Bus. Econ., 2002.18(1/3),163175.
Lew, Y. L., Lai, S. Y., Toh, T. C., Tan, O. K., & Yow, L. P. Quality Performance of Multi-layered Subcontracting Practices in Malaysian Construction Industry. In IOP Conference Series: Earth and Environmental Science 2020 (Vol. 498, No. 1, p. 012092). IOP Publishing.