A Noval Approach of Array to Inverter Matching of Utility Scale Solar PV Plants

DOI : 10.17577/IJERTV3IS080953

Download Full-Text PDF Cite this Publication

Text Only Version

A Noval Approach of Array to Inverter Matching of Utility Scale Solar PV Plants

M. Srinu1

1Department of Electrical and Electronic Engineering, Madanapalle Institute of Science and Technology, Madanapalle, India.

S. Khadarvali2

2Department of Electrical and Electronic Engineering, Madanapalle Institute of Science and Technology, Madanapalle, India.

D. Reddy Sekhar Naidu3

3Department of Electrical and Electronic Engineering, Madanapalle Institute of Science and Technology,

Madanapalle, India.

ABSTRACT- The array to inverter matching of a utility scale solar PV plants are necessary for the PV plant design. In practical environment at low temperatures, the module voltage increases. If the inverter is switch off on a sunlit winter day, this can guide to the open-circuit voltage being moreover high when it is switch back on again. At high temperature during summer, modules on a roof can easily heat up to around 70°C. If the working voltage of the system drops lower than the minimum MPP voltage of the inverter, this would no longer feed the maximum possible power and, in the worst case, would even switch off itself. To solve this problem, in this paper the goals of array to inverter matching is proposed and the maximum and minimum number of modules in series per string and the number o f modules connected in parallel for the inverter is calculated using pv syst software, also the MATLAB/SIMULINK model for the PV array designed depending on the specifications of the module selected.

In this paper we selected a site which has a Global Horizontal Irradiance of 5.65 kWh/m2/day, and requires an area of 160582m2 for developing a 25MW utility scale PV power plant having 50 inverters, for each inverter has 2000 modules, connected 20 in series and 100 in parallel and has an annual yield of 41,313 MWh.

Key words: photovoltaic (PV), utility scale solar PV plant, PV Syst software.

  1. INTRODUCTION

    In the most recent time, fresh energy sources have been planned and urbanized due to the need and regular increase of expenses of vestige fuel. On additional hand, vestige fuels have a enormous pessimistic blow on the atmosphere. In this circumstance, the novel energy sources are basically non-conventional energies [1]. It is predictable that the electrical energy generation from non conventional energy sources will boost from 19% in 2010 to 32% in 2030 most important to a subsequent decline of CO2 emission [2]. The planetary PV systems have established that they can produce power to extremely

    minute electronic devices up to utility range PV power plant. The current power system is more and more attractive benefit of solar power systems incoming the marketplace. Solar PV power systems setting up in the region of the universal demonstrate a almost exponential boost.

    Utility-scale PV plants are typically owned and operated by a third party and sells the electricity to a market or load serving entity through a Purchase Power Agreement (PPA). Utility scale systems that can reach tens of megawatts of power output under optimum conditions of solar irradiation [3]. These systems are usually ground mounted and span a large area for power harvesting [16]. Several components are needed to construct a grid coupled PV system to perform the power generation and conversion functions [4]. A PV array is used to transfer the light from the sun into DC current and voltage [3]. A three phase inverter is then attached to perform the power conversion of the array output power into AC power appropriate for injection into the grid [16] [15]. A harmonics filter is additional after the inverter to diminish the harmonics in the output current which result from the power conversion process [17]. An interfacing transformer is connected after the filter to step up the output AC voltage of the inverter to match the grid voltage level. The feat of a PV system is in general evaluate under the standard test condition (STC), where an regular planetary spectrum at AM1.5 is used, the irradiance is standardize to 1000W/m2, and the cell hotness is defined as 25oC [10] [11]. On the other hand, under actual working circumstances with changeable irradiance as well as major temperature changes in the ground most profitable modules do not automatically perform as in the condition given by the manufacturers [11]. The array to inverter matching of a utility scale solar PV plants are necessary for the PV plant design and the goals of array to inverter matching proposed in this paper. The major goal of matching an array to an inverter is to make sure that the inverter can capture a high proportion of the available

    energy that the array produces for the period of all of the environmental circumstances probable at the site. Frequently an inferior goal is to capitalize on the inverter ability so that the inverter will work at or near full power

    temperature

    Voc-max = Voc + {(T_min – T_STC ) × (coefficient of Voc )}

    Where

    (3)

    throughout high irradiance periods without power

    Nmax = Maximum number of modules in series per string.

    restrictive. It is important that power restrictive happen only for the period of excellent or temporary conditions not

    Voc

    =Open circuit voltage of the module.

    under ordinary working situation.

  2. ARRAY TO INVERTER MATCHING

    The overall power of the PV system can decides the number and power rating of inverters [19]. The solar array and inverter(s) have to be optimally coordinated to each other's yield values. The insignificant power of inverters can be ±20 per cent of the PV array yield power under STC depending in the lead the inverter and module expertise and the local surroundings such as local insolation and orientation of the modules. For sizing of PV plant the ratio between the PV array power and inverter power is 1:1 [19]. The level of the inverter's voltage is the addition of the voltages of the succession attached modules in a string. Since the voltage of the whole PV array depends upon the hotness, tremendous cases of wintry weather and summer. In order to make feasible inverters to be optimally coordinated to the solar array, it is important to take the modules hotness and irradiance in service parameters into description [18]. The working range of the inverter has to be matched with the I-V curve of the PV array. In order to make possible inverters to be optimally matched to the

    Voc-max =Maximum module voltage.

    T-min =Minimum temperature for the site.

    T-STC =Temperature at Standard Test Conditions.

    B. Minimum number of modules in series per string

    During summer, modules on a roof can easily heat up to around 70°C. This temperature is generally used as a basis when determining the minimum number of modules in a string [18]. With open systems a maximum temperature of 60°C and full irradiance in summer a PV system has a lower voltage than at STC conditions due to the increased temperatures as shown in fig.2 [20]. If the operating voltage of the system drops below the minimum MPP voltage of the inverter, this would no longer feed the maximum possible power and in the worst case would even switch of itself. For this reason, the system should be sized such that the minimum numeral of series-connected modules in a string is derived from the minimum input voltage of the inverter at the MPP and the voltage of the module at the MPP at 70°C [19]. The following formulas from (4) to (6) provides the lower limit value for determining the number of modules in a series.

    minimum dc input voltage for the inverter

    solar array following considerations are taking into account. Those are Maximum numeral of modules attached in series per string, Minimum numeral of modules attached in series per string, Maximum numeral of strings linked in

    Nmin

    maximum expected module maximum power voltage(Vmp_min )

    (4)

    parallel per inverter and Maximum array capacity.

    temperature

    temperature

    A. Maximum number of modules in series per string.

    The primary boundary is defined by a wintry weather temperature. At low temperatures the module voltage increases as shown in fig.2 [20]. The maximum voltage that can take place in a working circumstance is the open- circuit voltage at low temperatures [18]. If the inverter is

    Vmp_min = Vmp + {( difference ) × (coefficient of Vmp )}

    (5)

    temperature Vmp_min = Vmp + {(T_max – T_STC ) × (coefficient of Vmp )}

    (6)

    Where

    switched off on a fair wintry weather day, this can guide to the open-circuit voltage being too high when it is switched on again. This voltage must be lower than the maximum DC input voltage at the inverter; otherwise the inverter can be broken. Thus, the maximum numeral of series- connected modules is consequential from the proportion of the maximum input voltage of the inverter and the open-

    Nmin Vmp Vmp_min

    = Minimum number of Modules in Series

    = Maximum power voltage

    = Minimum expected module maximum

    power voltage

    circuit voltage of the module at low temperature [19]. The maximum figure of modules for string can be calculated by using the equation (1) to (3) mentioned below.

    T_max

    T_stc

    = Maximum temperature for the site

    = Temperature at Standard Test Conditions

    Nmax

    inverter maximum dc input voltage

    maximum module voltage(Vocmax )

    (1)

    1. Maximum number of strings in parallel per inverter

      The highest figure of parallel strings that can be con-

      temperature

      temperature

      nected to the inverter without causing current limiting can

      (2)

      Voc-max = Voc + {( difference ) × (co – efficient of Voc )}

      generally firm by a simple calculation without the need for temperature adjustment. To calculate the maximum numeral of equivalent strings, divide the maximum inverter

      input current by either the module Maximum power current (Imp) or Short-circuit current (Isc) [19].

      Where N = Maximum number of modules to the inverter

      PTC = Power Test Condition

      N maximum inverter input current maximum power current at STC

      Where N = Maximum number of Strings in Parallel

    2. Maximum array capacity

    (7)

  3. MODELING OF PHOTOVOLTAIC ARRAY

    A Photovoltaic (PV) cells are used to convert the sunlight into direct current (DC). Due to the low voltages

    The final step in formative the array to inverter match is to inspect the array maximum power. Some array configurations that do not go beyond the voltage or current constraints could still result in power levels that go beyond the inverters output power capabilities. If this happens, precious solar-generated energy will be dissipate into the surroundings as waste heat or else vanished when the inverter is forced into power preventive [18].

    Solitary method to match array input to inverter output power is to consider the arrays PVUSA Photo Voltaic United States of America Test Condition rating. Power Test Condition (PTC) ratings better reflect real world performance. subsequent to matching an arrays PTC rating to the inverter output power consider a factoring in the inverters CEC (California Energy Commission) weighted efficiency. Inverter output power in this case should be less than or equal to the array PTC rating divided by the inverters CEC weighted efficiency. Furthermore, the high irradiance conditions that could lead to inverter cutting or fleeting. The equation for manipulative the maximum number of modules in this manner is

    Inverter Power N × PTC × CEC weighted

    and current generate in a PV cell several PV cells are connected in series and then in parallel to form a PV module for desired output. The modules in a PV array are generally first connected in succession to obtain the desired voltages and individual strings are then connected in equivalent to allow the system to produce more current. The equivalent circuit of PV array is shown in fig.1 [6] [8] [9].

    From the fig.1.

    IA = (Iph Np ) – Ish – Id (11)

    The array output current is a function of Iph, Ish and Id. The equations from (11) (18) are the required to design a solar PV array.

    efficiency

    PTC = fixed module power deratingfactor

    (8)

    Fig.1.Equivalent circuit of a PV array.

    of 0.90 × Pmp_STC (9)

    Where N = Maximum number of modules to the inverter

    PTC = Power Test Condition

    Iph = Irr (Isc + Ki (Top – Tref ))

    [ V + IRS ]

    (12)

    I = I N {{exp

    N

    S

    × V × C} – 1}

    Pmp_STC = Maximum power at standard test condition.

    d S P n T

    (13)

    Genuine full power inverter efficiency is somewhat lower than the weighted CEC efficiency. In adding together voltage fall, module inequality and array soiling could result in other system sufferers. A land based

    VT =

    KTOP

    q (14)

    2

    systems in an ideal world oriented to the sun for summer

    I = I [ TOP 3

    q Eg 1 1

    energy yield but high cell temperatures considerably derate

    S rs

    ] (exp

    T

    ( – ))

    Kn Tref Top

    peak power output. Wintry and comprehensible conditions at other times of the year are improbable to produce

    ref (15)

    I = Isc – 1

    hypothetical high peak power outputs because the suns incidence angle would not be idyllic. This is a case where oversizing the array in the proposed work may be acceptable. A further derating factor of 0.95 can be used to approximation the combined outcome of these supplementary factors.

    rs qV

    oc

    exp( )

    KCTopn

    I = IRS + V Sh R P

    (16)

    (17)

    Inverter Power

    (CEC weighted efficiency) × N × PTC×{(deratingfactor)

    }(10)

    VT =

    KTOP

    q (18)

    Where

    Table.2 SMA Solar Technology AG SC 500CP XT.

    Manufacturer

    SMA Solar Technology AG

    Maximum PV power (Pdc) kW

    560

    Maximum open circuit voltage (Vdc)

    1000

    MPPT circuits

    1

    MPPT range(Vdc)

    430-850

    Maximum DC input current (Idc)

    1250

    Maximum Output power(Pac) KW

    500

    Nominal output voltage (Vac)

    243-310

    AC output wiring

    3wire w/neut

    Maximum Output current (Iac)

    1176

    Maximum efficiency (%)

    98.6

    CEC-weighted efficiency (%)

    98.4

    IA PV array output current

    IPh Solar cell photocurrent

    Ish Id Np

    Shunt current of PV array diode current of PV array number of modules in parallel

    VA array output voltage

    Rs R P

    Irr

    series resistance of the PV module parallel resistance of the PV module

    cell reverse saturation current at temperatureTref

    Isc short circuit current of the PVcell

    Ki short circuit current temperature coefficient

    Top operating temperature of the PV cell in Kelvins

    Tref reference temperature of the PV cell in Kelvins

    By using the equations (1) (10) and the data available in the table.1 and table.2 the number of modules connected in per string are 20 and the number of strings per

    Is Vt Irs EG

    Reverse saturation current equation at Top

    terminal voltage of the pvcell

    cell reverse saturation current at temperatur Tref

    band gap of the semiconductor used in the cell

    inverter are 100 so the total number of inverters required for generating the 25MW are 50 each of capacity 500kW total number of modules are 1, 00,000, and also we are using the PV syst software for analyzing the same with practically the results are shown in the fig.3 and fig.4.

    K Boltzmann's constant,1.380658e 23 J / K q Electron charge,1.60217733e 19 Cb

    Ns number of modules in series

    Np number of modules in parallel n p – n junction ideality factor

    C total number of cells in a PV module

    In this paper we are considering a typical CS6P- 250P PV modules and SMA Solar Technology AG 500 XT inverter for designing a 25MW utility scale solar PV plant as given in table 1 and table 2 respectively [11] [12].

    Table.1 Parameters of a CS6P 250P solar array under Standard test condition (STC).

    Manufacturers

    Canadiasolar inc250 P

    Technology

    Poly

    Maximum Power (Pmax )

    250W

    Rated power @ PTC (W)

    227.6W

    Module efficiency (%)

    15.54%

    Power tolerance

    +2%

    Maximum Power Voltage (Vmpp )

    30.1 V

    Maximum Power Current ( Impp)

    8.30 A

    Open Circuit Voltage ( Voc)

    37.2 V

    Short Circuit Current ( Isc)

    8.87 A

    Voltage/Temperaturecoefficient(Kv )

    -0.0034 V/K

    Current/Temperaturecoefficient ( Ki)

    0.00065 A/K

    Series Connected cells ( C)

    60X1

    Fig.2 module behavior according to temperature [20]

    Fig.3. Power system sizing (solar PV modules and inverter)[20].

    Fig.4. Solar PV power plant components sizing[20].

    From the fig.3 the operating voltage of the inverter is in between 430 V to 850 V, operating current is 42,97A and the power generation is 22,506 kW. The total area required for generating 25MW is 1,60,852m2; having tilt angle of 35 with south facing on ground based mounting structure [20].

  4. MATLAB/SIMULINK MODELING OF PV

    ARRAY PER INVERTER

    By grouping the all the equations from (11) (18) and the data available in the fig.3 the Simulink model for the PV array is shown in fig.5 [5] [7].

    Fig.5.Simulink model of the PV array per inverter.

    From fig.4 the number of modules per string is 20 and the number of string per inverter are 100. In this paper we are

    designing a 25 MW PV power plant that require 50 inverters each of capacity 500kW and the total number of modules are 1, 00,000 [20].

  5. SIMULATION RESULTS AND DISCUSSIONS The PV array voltage is powerfully dependent upon

the temperature. The working range of the inverter must be

coordinated with the I-V curve of the PV array [16]. The maximum occurring temperature is determined by the location of the system. This should be taken into account when determining the voltage change.

Fig.6 V-I Characteristics of PV array

Fig.7 P-V characteristics of PV array

CONCLUSION

For developing a 25MW utility scale PV power plant in this paper a site which has a GHI of 5.65 kWh / m2

/ day is selected. It requires total area of 1, 60,582 m2 and annual yield is 41,313 MWh. In this paper sizing of basics components of solar PV plant can be designed using the PV syst software and Simulink model for PV array per inverter is designed. The major goal of matching an array to an inverter is to make sure that the inverter can capture a high proportion of the available energy that the array produces for the period of all of the environmental circumstances probable at the site. Frequently an inferior

goal is to capitalize on the inverter ability so that the inverter will work at or near full power throughout high irradiance periods without power restrictive. It is important that power restrictive happen only for the period of excellent or temporary conditions not under ordinary working situation.

REFERENCES

  1. F.Bouchafaa1, D.Beriber1, M.S.Boucherit, Modeling and control of a gird connected PV generation system, 18th Mediterranean Conference on Control & Automation Congress Palace Hotel, Marrakech, Morocco June 23-25, 2010

  2. M.G.Molina and P. E. Mercado Modeling and Control of Gridconnected PV Energy Conversion System used as a Dispersed Generator.978-1-4244-2218-0/08/©2008 IEEE B.

  3. Verhoeven, et. al. Utility aspects of grid connected photovoltaic power systems, International Energy Agency PVPS task V, 1998.

  4. P. Karki, B. Adhikary and K. Sherpa, "Comparative Study of Grid- Tied Photovoltaic (PV) System in Kathmandu and Berlin Using PV syst," IEEE ICSET, 2012.

  5. K. T. Tan, P. L. So, Y. C. Chu, and K. H. Kwan, (2010). Modeling, Control and Simulation of a Photovoltaic Power System for Grid- connected and Standalone Applications, IEEE- IPEC.46

  6. Fei Ding, Peng Li, Bibin Huang, Fei Gao, Chengdi Ding and Chengshan Wang, (2010). Modeling and Simulation of Grid- connected Hybrid Photovoltaic/Battery Distributed Generation System, China International Conference on Electricity Distribution.

  7. Altas, I. H.; Sharaf, A.M., A Photovoltaic Array Simulation Model for Matlab-Simulink GUI Environment, Clean Electrical Power, 2007. ICCEP '07. International Conference on 21-23 May 2007 Page(s):341 345.

  8. H.L. Tsai, C.S. Tu, Y.J. Su, Development of generalized photovoltaic model using MATLAB/SIMULINK, in: Proceedings of the World Congress on Engineering and Computer Science, San Francisco, USA, 2008.

  9. M.G. Villalva, J.R. Gazoli, E.R. Filho, Comprehensive approach to modeling and simulation of photovoltaic arrays, IEEE Transaction on Power Electronics 24 (2009) 1198-1204

  10. J.T. Bialasiewicz, Renewable energy systems with photovoltaic power generators: Operation and modeling, IEEE Transactions on Industrial Electronics 55 (2008) 2752-2758.

  11. Vasareviius D., Martaviius R. Solar Irradiance Model for Solar Electric Panels and Solar Thermal Collectors in Lithuania // Electronics and Electrical Engineering. Kaunas: Technologija, 2011.

    No. 2(108). P. 36.

  12. T. Shimizu, M. Hirakata, T. Kamezawa, H. Watanabe, Generation control circuit for photovoltaic modules, IEEE trans. on power electronics, vol. 16, no. 3, pp. 293-300, May 2001.

  13. Huan-Liang Tsai, Ci-Siang Tu, and Yi-Jie Su, Development of Generalized Photovoltaic Model Using MATLAB/SIMULINK Proceedings of the World Congress on Engineering and Computer Science 2008 WCECS 2008, October 22 – 24, 2008, San Francisco, USA

  14. H. Watanabe, T. Shimizu, G. Kimura, A novel utility interactive photovoltaic inverter with generation control circuit, IEEE proc. Of 24th IECON, vol. 2, pp. 721-725, August – September 1998, Germany.

  15. R. Mechouma, B.Azoui, M.Chaabane, Three-Phase Grid Connected Inverter for Photovoltaic Systems, a Review, 2012 First International Conference on Renewable Energies and Vehicular Technology.

  16. M. Carrasco, L. G. Franquelo, J. T. Bialasiewicz, E. Galván, R. C. Portillo-Guisado, M. A. Martín-Prats, J. I. León, N. Moreno- Alfonso, Power electronic systems for the grid integration of renewable energy sources: a survey, IEEE Trans. Industrial Electronics, vol. 53, no. 4, pp.1002-1016, 2006.

  17. A. Reznik, M.Godoy Simões, Ahmed Al-Durra, S. M. Muyeen, Colorado School of Mines, EECS Dept., Golden, CO, USA LCL Filter Design and Performance Analysis for Grid Interconnected Systems, Petroleum Institute, Electrical Engineering Department, Abu Dhabi, UAE.

  18. Anita Marangoly George 2012 utility scale solar pv plant a guide for evelopers and investors

  19. Array to Inverter Matching Mastering Manual Design Calculations solar weekly By John Berdner.

  20. Pv syst software

Leave a Reply