A Real Coded Genetic Algorithm For Solving Combined Economic Emission Dispatch (CEED) With Practical Constraints

DOI : 10.17577/IJERTV2IS60258

Download Full-Text PDF Cite this Publication

Text Only Version

A Real Coded Genetic Algorithm For Solving Combined Economic Emission Dispatch (CEED) With Practical Constraints

Deepan B 1

1PG Student/Dept.of.EEE Paavai Engineering College, Namakkal

Janani R 2

2Assistant Professor/Dept.of.EEE Paavai Engineering College, Namakkal

Abstract Due to the continual awareness program of society about the global warming and due to the alarming rate of raise in the pollutants in the atmosphere people raise questions concerning environmental protection. So there arises the necessity to reduce the amount of pollutants released from the power generating units. This paper introduces an efficient evolutionary programming based algorithm to solve a Bi-objective (fuel cost and emission objectives) optimization problem. The proposed method has been employed to handle the Equality (Power balance constraints) constraints, Inequality constraints(generator capacity constraints) and also practical constraints such as transmission losses, valve point loading and ramp rate limits and prohibited operating zones. These salient features make the proposed algorithm to be attractive in practical generator operation/large scale highly non- linear and complex systems. The feasibility of the proposed method is tested for various power demands on 3-generator test system, 6-generator test system and also with IEEE-30 bus system for various power demand. The solutions obtained are quite encouraging and useful in the practical economic emission environment.In the proposed work a real coded genetic algorithm is used to solve the problem of Combined Economic Emission Dispatch.

Index terms-Multi-objective optimization problem, Combined Economic Emission Dispatch, Real Coded Genetic Algorithm, Valve Point Loading, Ramp Rate limits, Prohibited Operating Zones.

I INTRODUCTION

Scheduling of power plant generation is of great importance for electric utility systems which is carried out in the power plants on the basis of least fuel cost strategies without considering pollutants released from the thermal generation.One of the prime concerns from social and environment aspects is that both human and non-human life forms are severely affected by the atmospheric pollution caused during generation of electricity from fossil fuels. This may give rise to the problem of global warming. Due to increasing concern over the environmental consideration [1],society demands adequate and secure electricity not only at the cheapest possible price, but also at minimum level of pollution. So the optimal scheduling of generation in a thermal power plant

involves the allocation of generation so as to optimize the fuel cost and emission level simultaneously. The remote location of power plant from the load centre has been identified as one of the reasons which caused high cost. The increase in fuel cost these days has also contributed to this phenomenon. Therefore, economic load dispatch is implemented in order to determine the output (generation) of each generator so that the total generation cost will be minimized. The generator's output has to be varied within limits so as to meet a particular load demand and losses with minimum fuel cost [2].Thus, Economic load dispatch (ELD) is one of the important topics to be considered in power system engineering.

In addition, the increasing public awareness of the environmental protection and passage of clean Air Act Amendments of 1990 have forced the utilities to modify their design or operational strategies to reduce pollution and atmospheric emission of thermal plants such that the electricity using industry must decrease its SO2 emission by 10 million ton/year and the NOX by 2 million ton/year[3]. Apart from heat, power utilities using fossil fuel as primary energy source, produces harmful gasses such as CO2, SO2 and NOx, which cause detrimental effect on human being.

Different methods are offered for reducing emissions such as switching to fuels with low emission potential, installing post-combustion cleaning system e.g. electrostatic precipitators etc. This method of reduction of pollutants increases the total operating cost of the entire thermal power plant. To minimize the overall operating cost the CEED problem seems to be the preferred choice which is an excellent power management approach because it is easily implemented and requires minimal additional costs [4].

The solution of economic power dispatch or minimum emission problems, when attempted in isolation will be different and conflicting with each other. Therefore in order to solve these two objectives (economic and emission) simultaneously, the problem is formulated into multiobjective problem that concurrently reduce both fuel cost and total emissions. While the

emission is reduced the fuel cost may be inappropriately increased or while the fuel cost is reduced the emission may be increased. This difficulty of Multi-objective CEED problem is overcome by changing the multi-objective into a single objective function with the help of a price penalty factor and linear weighted sum method. The Price penalty factor blends the fuel cost and emission output. Many researchers propose the price penalty algorithm based CEED problem. K.Srikrishna and C.Palanichamy have proposed a method for Combined Emission and Economic Dispatch (CEED) using price penalty factor[5].

Recently price penalty approach is presented for solving emission, reserve and economic load dispatch (ERELD) problem with non-smooth and non-convex cost functions problem[6]. Over the past decade, the later approach has attracted many researchers interests due to the new development of multi-objective evolutionary search techniques. Multi-objective evolutionary algorithms like Evolutionary programming (EP)[7], Particle swarm optimization (PSO)[8], Binary coded GA[9] have been introduced to solve the CEED problem. In addition, some other optimization approaches, such as fuzzy satisfaction maximizing technique [10]and genetic and evolutionary programming based hybrid approaches have been proposed [11],[12],[13].

Certain evolutionary programming based hybrid optimization methods have some problems like more time for optimization, operation complexity, etc.. To overcome this problem real coded (continuous) genetic algorithm is proposed to solve the CEED in addition to loss minimization. In this optimization method, the output of each generating unit is represented by a floating point number, instead of binary coding, resulting in absolute precision. Hence dependence of accuracy on string length (number of bits) is eliminated. However, when the variables are continuous, it is more logical to represent them by floating-point

zone by actual performance testing or operating records. The best economy is achieved by avoiding operation in areas that are in actual operation. Hence, the nonlinearconstraints (valve point loading and ramp rate limits and prohibited operating zones) of generator operation must be taken into account to achieve true economic operation.

II PROBLEM FORMULATION

    1. Mathematical Model for Combined Economic Emission Dispatch

      The economic dispatch and emission dispatch are considerably different. Because of this conflicting nature of these two objectives it is necessary to find an operating point that makes a balance between fuel cost and emission which is possible by means of CEED problems. The Combined Economic Emission Dispatch problem is to minimize simultaneously the two competing objective functions fuel cost and emission while satisfying all equality, inequality and practical/non- linear constraints.

      Since CEED problm deals with two single objectives,the mathematical model for the above problem is described as follows:

      i=1

      i=1

      TC = Min Ng [ Fi Pi , Ei(Pi )] Rs/hr2.1Where Fi(Pi ) = ai*Pi 2 + bi Pi + Ci [fuel objective]

      Ei Pi = di Pi 2 + ei Pi + fi[Emission objective]

      TC-the total operating cost objective function

      Ng – the total number of generators in operation

      Fi Pi – the fuel cost of ith generating unit in Rs/h

      Ei Pi – the Emission output of ith generating unit in Kg/hr

      ai, biand ci – fuel cost co-efficient of ithgenerating unit

      d, ei and fi- Emission co-efficient of ith generating unit

      Subject to

      numbers due to which it requires less space, inherently faster and also reduces the chances of error occurrence.

      For convenience in solving the ED problem, the unit generation output is usually assumed to be adjusted smoothly and

      ng Pi = PD + PLoss

      i=1

      i=1

      Pi,min Pi Pi,max 2.3

      Where

      PD -Power Demand in MW

      2.2

      instantaneously. Practically, the operating range of all online units is restricted by their ramp rate limits for forcing the units operation continually between two adjacent specific operation period. In addition, the prohibited operating zones in the input-output curve of generator are due to steam valve operation or vibration in the shaft bearing. Because it is difficult to determine the prohibited

      Pi,min -Minimum power generation limit of the ithunit in MW

      Pi,max -Maximum power generation limit of the ithunit in MW

      The first constraint given by equation(2.2) represents the equality constraint of power balance conditions. Constraint equation(2.3) represents

      inequality constraints of generation real power limits.

    2. Transmission Loss Constraints

Since there is no electrical network without loss, the transmission losses between two generating units must be accounted in order to have an exact CEED problem. In this proposed method transmission loss is calculated using B- Coefficients method which can be expressed as

Ng Ng Ng

PLoss = Pi Bij Pj + BOi + BOO in MW

Where

i=1 j=1

j=1

Fig.1. Valve point loading curve

The valve-point effect may be considered by

Pi -power generation of the ith unit in MW Pj -power generation of the jth unit in MW Bij -the loss coefficientsbetweenith and jth generating unit in MW

PLoss -the power loss in MW

The B-loss coefficients are constant under certain assumed conditions. The above loss formula is called as Georges formula[21].

    1. CEED Problem Considering Practical Operation Constraints Of Generator

      As all the thermal generating units are having some non-linear characteristics in their operation, inorder to make the solution to be practical those non-linearities such as valve point effect, generator ramp-rate limits and prohibited operating zones must be considered while solving problem.Here those non-linearities are presented as follows.

      1. Valve Point Loading

        For more rational and precise modeling of economic and emission function, the above expression of cost function is to be modified suitably. Modern thermal power plants are designed to have generating units with multi-valve steam turbines to incorporate flexible operational facilities but it gives a very different cost curve and exhibits a greater discrepancy in the fuel cost curves. Typically, ripples are introduced in the fuel cost curve as each steam valve starts to operate.

        adding a sinusoidal function to the quadratic cost function described above. Hence, the problem described is revised as follows:

        Fi(Pi ) = ai*Pi 2 + bi Pi + ci +| di*sin(ei*Pimin- Pi )|

        Where Fi(Pi ) is total fuel cost of generation in ($/hr) including valve point loading, di ,eiare fuel cost coefficients of the ith generating unit reflecting valve-point Effect.

      2. Ramp Rate Limit

        The inequality constraints due to ramp rate limits for unit generation changes are given in terms of

        0

        0

        1. as generation increases

          Pi Pi URi

          0

          0

        2. as generation decreases

        Pi Pi DRi

        Fig.2 Generator ramp rate limit curves

        i

        i

        Where P 0 is the power generation of uniti at previous hour and URiandDRiare the upper and lower ramp rate limits respectively. The inclusion of ramp rate limits modifies the generator operation constraints as follows[22],

        min 0 ) max 0

        min 0 ) max 0

        Max (Pi , Pi Pi Pi Min(Pi , Pi Pi )

      3. Prohibited Operating Zone

Due to steam valve operation or vibration in a shaft bearing there are some restricted zones identified in the input-output curve. Because it is difficult to determine the prohibited zone by actual performance testing or operating records, the best economy is achieved by avoiding operation in areas that are in actual operation. Symbolically, for a generating unit i, where j is the number of prohibited zones of unit[8]

Fig.3Two Prohibited Operating Zones Function cost Curve

Recalling that

i

i

Fi (Pi max ) = h Rs/kg

Ei (Pi max )

Step4:Arrang hi (i = 1,2 . . NG) in ascending order

h= [p,p,phn]

Step5: Let Pm be the vector having the maximum values of the respective h Values

Pm= [ Pm1, Pm2,., Pmn]

Let m be the vector having m=[m1,m2,.., mn] wheremi+1=mi+ P mi+1

Step6: Add the maximum capacity of each unit,Pmi one at a time until

Case1:If the load demands PD = mi, then

hm = hi is the modified price penalty factorRs/kg for the given load

Case2: If the load demand PD is between mi and

Pi ,min

Pi

Pl

i,,l

mi+1 , then

(hi+1)

P

P

u

i,j-1

Pi

Pl

i,j

j=1,2, n

hm =hi +

(mi+1

) * (PD mi)

P

P

u

i,ni

Pi

Pimax

Where hm

is the Modified Price penalty

Where j is the number of prohibited zones of unit.

    1. Modified Price Penalty Factor Algorithm

      Since the CEED problem is of conflicting in nature(i.e Minimization cost increases emission and vice versa), a price penalty factor(PPF) method has been chosen as a suitable method to convert a bi-objective problem into a single objective. A practical way of determining PPF is discussed by Palanichamy and Srikrishan[14]. Since the above price penalty factor algorithm provide an approximate value of price penalty factor for the power demand, an accurate method of determining price penalty factor called as Modified Price Penalty Factor(MOPPF) Algorithm is used in this work. Determination of MOPPF is gives as follows.

      Step1:Evaluate the Maximum cost of each generator at its maximum output is

      Fi Pimax = ai*Pi 2 + bi Pi + Ci Rs/hr

      Step2: Evaluate the Maximum Nox emission of each generator at its maximum output is

      Ei Pimax = d*Pi 2 + ei Pi + fi Kg/hr

      Step3: Divide the Maximum cost of each generator by its average Nox emission, i.e

      factor in Rs/Kg, which is fixed for a load demand.

    2. Complete Optimization Problem

The complete CEED optimization problem using Modified Price Penalty Factor is determined by using the following equation.

i=1

i=1

Minimize TC = Min ng [Fi Pi + hm Ei(Pi )]

(Rs/hr)

hm is the Modified penalty factor in Rs/kg

TC isthe total operating cost objective function

III REAL CODED GENETIC ALGORITHM

    1. An Introduction to Genetic algorithm

      A Genetic Algorithm (GA) is an iterative procedure which begins with a randomly generated set of solutions referred as initial population. For each solution in the set, objective function and fitness are calculated. On the basis of these fitness functions, pool of selected population is formed by selection operators; the soution in this pool has better average fitness than that of initial population. The crossover and mutation operator are used to generate new solutions with the help of solution in the pool. The process is repeated iteratively while maintaining fixed number of solutions in pool of

      Fi (Pi max ) Ei (Pi max )

      2

      = (a P +b P +C )

      = (a P +b P +C )

      i i i i i

      dPi 2 +ei Pi+fi

      selected population. As the iteration progresses, the solution improves and optimal solution is obtained.

      During the selection process of the GA, good solutions are selected from the initial generated population for producing offspring. Good solutions are selected randomly from the initial generated population using a mechanism which favors the more fit individuals. Good individuals will probably be selected several times in a generation but poor solutions may not be selected at all.

    2. Structure of Real coded Genetic algorithm for solving CEED Problem formulation

In this paper, real coded genetic algorithm (RGA) is used as an optimization tool for solving the Combined Economic and Emission (CEED) problem formulation. Real coded genetic algorithm does not need any coding and decoding, where it seems to be faster and more accurate than binary GA. Similar to ordinary GA, RGA operators are: selection, crossover and mutation. These terms are explained in the following sections.

3.6 Fitness Evaluation

In the CEED problem of determining minimum operating cost considering the fuel cost and emission output, the goal is to minimize the objective function

ng

TC = Min [Fi Pi + h Ei(Pi )]

i=1

and with the equality constraints

Pi PD PLoss = 0, i = 1,2, . Ng.

i

is changed to an unconstrained optimization

problem using the penalty functions (PF) as given in equation .This becomes the fitness function

Fitness function = TC + PF 3.3

    1. Crossover

      Where = ng

      Pi PD PLoss = 0

      i=1

      i=1

      The task of crossover is the creation of new individual, out of the two individual of the current population. Simple arithmetic blend crossover type is used in this paper, shown in equation(3.1).

      The Second term in the equation (3.3) is the power balance equation. The Penalty function placed in the objective function penalizes any violation of the constraints and forces the unconstrained optima towards the feasible region.

      O = P + 1 P

      This second term becomes zero during the

      O =

      1 1 1

      + P ,

      1 2

      , 0,1 3.1

      initialization of fitness function and it gets a non-

      2 2 P2

      1 2 1

      1 2

      zero value after mutation only if generator vector

      Where, P1, P2are the two parents, O1, O2are their two offspring and 1 , 2 are the two random numbers.

    2. Mutation

      Mutation is for introducing artificial diversification in the population to avoid premature convergence, which corresponds to a local optimum. In this work, simple real mutation type is used, as shown in the equation (3.2).Here it is assumed that for a given parent P, if the gene is selected for mutation, then theresulting gene will

      be selected by using equation

      Ok = ak + bk ak r 3.2

      Whereak, bk are lower and upper bands of Ok and r

      [0, 1 ].

    3. Selection and Survival of fittest

As GAs depicts the natural phenomena, the best individuals survive by competing others. These individuals are selected using roulette wheel with slot sized according to fitness, so that the probabilities of selecting best strings are higher.

violate its limit. Therefore, only F1 becomes the fitness function and is computed for the offspring vector similar to the parent vector.

IV.REAL CODED GENETIC ALGORITHM FOR SOLVING CEED OPTIMIZATION PROBLEM

The real coded genetic algorithm has been structured as follows

Step1 : Read the Power Demand PD

Step2 : Calculate the price penalty factor (hm) using Modified price penalty factor

algorithm

Step3 : Initialize the iteration iter =1 Step4 : Generate n population vector of generatorreal power based on ramp

limit and prohibitedzone constraints

Step5 : Calculate the fitness function using (3.3) Step6 : Select n population size of parent using

Roulette wheel selection method

Step7 : Generaten population size child using equation (3.1)

Step8 :Non-repeated Mutated child formation equationusingequation(3.2)

Step9 : Increment the iteration iter =iter+1

Step10 : Checkiter is greater than maximum iter , If yes go to step 5 otherwise go to step11

Step11 :Print the Minimized operating cost and the corresponding Fuel cost, Emission output, Generator schedule

The flowchart of proposed real coded genetic Algorithm for solving the CEED problem is in Fig.4

Fig.4 Flowchart of Real coded Genetic Algorithm for solving the CEED problem

V RESULTS AND DISCUSSION

The efficacy and viability of the proposed method is tested with 3-generator test system, 6- generator test system and IEEE 30 bus system respectively considering non linearity practical constraints such as transmission losses, ramp rate limits, prohibited operating zone and valve point effect. The performance of each system has been compared with other methods like PSO, GA etc. The coding has been written in MATLAB 7.10 and run on a 3.0 MHZ, 1GB RAM.

    1. Three-Unit Thermal System

      The system consists of three-thermal units. The generator cost coefficients, emission coefficients and generation limits, Bmn coefficient matrix are given in [15],[16]. The proposed Real Coded Algorithm for solving Combined Economic and Emission dispatch for the first test case is tested with the five load demandwhich is given in table 5.1

      Table 5.1 Load Demand details for 3- Unit Thermal System

      S.No

      Load Demand

      1

      350 MW

      2

      400 MW

      3

      450 MW

      4

      550 MW

      5

      600 MW

      Table 5.2 CEED Solution of Three-Generator

      Power Demands (MW)

      350`

      400

      450

      550

      600

      P1 (MW)

      88.4275

      102.5864

      115.6740

      142.0743

      155.6327

      P2 (MW)

      135.1281

      153.6839

      173.0219

      212.1404

      231.7087

      P3 (MW)

      132.0988

      151.1419

      170.7305

      210.0032

      229.6589

      Fuel cost (Rs/h)

      18587.07

      20836.92

      23139.27

      27903.67

      30368.08

      Emission (Kg/hr)

      158.5442

      199.4818

      249.8745

      379.7289

      459.4187

      PPF(Rs/K)

      43.4265

      43.6865

      43.9465

      44.4665

      44.7265

      Total ystem loss (MW)

      5.6545

      7.4122

      9.4264

      14.2179

      17.0001

      Total Cost (Rs/h)

      25472.09

      29551.68

      34121.08

      44788.89

      50916.27

      System

      The CEED Solution of Three-Generator System for all the power demand considered is given in Table 5.2. First row shows the optimal scheduling of the three-Generator units for each power demand. Second row and third row shows the minimized fuel cost in Rs/hr and emissio output level in kg/h. Fourth row shows price penalty factor obtained from modified price algorithm in Rs/kg for different power demand. Fifth row shows system loss in MW. Sixth row

      shows the optimal total cost in Rs/hr at which the system fuel cost and emission level is minimized. The convergence characteristics of minimum total cost obtain using real coded Genetic algorithm for the power demand of 350MWconsidered is shown in Fig.5.1 From the table, it can be observed that the cost required for generating the required power increases as the power demand rises. Also, the emission output rises as the power demand rises.

      1640

      1630

      fitness value

      fitness value

      1620

      1610

      1600

      1590

      Table 5.4 Emission Output (kg/h) for Different Optimization Techniques

      Optimization Techniques

      Power Demand (MW)

      350`

      400

      450

      550

      600

      GA

      159.118

      200.256

      250.929

      381.258

      461.352

      PSO

      159.076

      200.221

      250.866

      381.216

      461.207

      RGA

      158.5442

      199.4818

      249.8745

      379.7289

      459.4187

      Table 5.5 Total Operating Cost (Rs/h) for Different Optimization Techniques

      1580

      Optimization Techniques

      Power Demand (MW)

      350`

      400

      450

      550

      600

      GA

      25481.6

      29563.2

      34138.2

      44810

      50948

      PSO

      25477.2

      29559.2

      34132.8

      44806.8

      50937.3

      RGA

      25472.1

      29551.6

      34121.08

      44788.89

      50916.2

      Optimization Techniques

      Power Demand (MW)

      350`

      400

      450

      550

      600

      GA

      25481.6

      29563.2

      34138.2

      44810

      50948

      PSO

      25477.2

      29559.2

      34132.8

      44806.8

      50937.3

      RGA

      25472.1

      29551.6

      34121.08

      44788.89

      50916.2

      0 10 20 30 40 50 60 70 80 90 100

      Generation

      Fig.5.1Convergence characteristics for350MW load demand

      The proposed Real coded genetic algorithm (RGA) technique is evaluated with the results of optimization techniques like Particle Swarm Optimization (PSO) and Binary Genetic Algorithm (GA) proposed by Lakshmi et.al [17].The fuel cost required by various techniques is provided in table 5.3. From the result, it can clearly suggest that the proposed technique is better which required lesser cost for the system operation when compared to other technique .The emission resulted for using PSO, GA and RGA for various power demands is provided in table 5.4. The emission resulted for using the proposed optimization technique is very much reduced when compared to the other techniques. This case is true not only for particular power demand rather it is true for all cases. By considering the overall result, it can be suggested that the usage of proposed technique will reduce the fuel cost as well as the emission output; Hence the total operating cost of the system is minimized and its comparison with other techniques is given in Table 5.5

      Table 5.3 Fuel Cost (Rs/hr) for Different Optimization Techniques

      Optimization Techniques

      Power Demand (MW)

      350`

      400

      450

      550

      600

      GA

      18591.8

      20840.1

      23142.6

      27905.4

      30372.3

      PSO

      18589.2

      20838.3

      23140

      27904.1

      30368.2

      RGA

      18587.0

      20836.9

      23139.2

      27903.6

      30368.0

    2. Six-Unit Thermal System

      The system consists of six-thermal units. The generator cost coefficients, emission coefficients and generation limits, Bmn coefficient matrix are given in Appendix. The proposed Real Coded Algorithm for solving Combined Economic and Emission dispatch for the first test case is tested with the three load demand is given in table

      Table 5.6Load Demand details for 3- Unit Thermal System

      S.No

      Load Demand

      1

      700 MW

      2

      900 MW

      3

      1100 MW

      The CEED Solution of Three-Generator System for all the power demand considered is given in Table 5.6. First row shows the optimal scheduling of the Six-Generator units for each power demand. Second row and third row shows the minimized fuel cost in Rs/hr and emission output level in kg/h. Fourth row shows price penalty factor obtained from modified price algorithm in Rs/kg for different power demand. Fifth row shows system loss in MW. Sixth row shows the optimal total cost in Rs/hr at which the system fuel cost and emission level is minimized. The convergence characteristics of minimum total

      cost obtain using real coded Genetic algorithm for the power demand of 900MW is shown in Fig.5.2. From the table 5.7, it can be observed that the cost required for generating the required power increases as the power demand rises. Also, the emission output rises as the power demand rises.

      Power Demand (MW)

      700

      900

      1100

      P1 (MW)

      60.7202

      88.2929

      112.0472

      P2 (MW)

      61.5230

      95.2998

      133.9136

      P3 (MW)

      117.7257

      151.5128

      189.7779

      P4 (MW)

      120.6014

      149.0817

      178.7373

      P5 (MW)

      176.5699

      225.7344

      270.0510

      P6 (MW)

      179.9687

      217.5239

      257.3060

      Fuel cost (Rs/h)

      37481.41

      48224.73

      59872.05

      Emission (Kg/h)

      438.76

      694.42

      1034.244

      PPF (Rs/Kg)

      44.320

      45.29

      50.19

      Totalsystemloss(MW)

      17.1059

      27.4455

      41.8330

      Total Cost (Rs/h)

      56930.46

      79678.46

      111780.7

      Power Demand (MW)

      700

      900

      1100

      P1 (MW)

      60.7202

      88.2929

      112.0472

      P2 (MW)

      61.5230

      95.2998

      133.9136

      P3 (MW)

      117.7257

      151.5128

      189.7779

      P4 (MW)

      120.6014

      149.0817

      178.7373

      P5 (MW)

      176.5699

      225.7344

      270.0510

      P6 (MW)

      179.9687

      217.5239

      257.3060

      Fuel cost (Rs/h)

      37481.41

      48224.73

      59872.05

      Emission (Kg/h)

      438.76

      694.42

      1034.244

      PPF (Rs/Kg)

      44.320

      45.29

      50.19

      Totalsystemloss(MW)

      17.1059

      27.4455

      41.8330

      Total Cost (Rs/h)

      56930.46

      79678.46

      111780.7

      Table 5.7 CEED Solution of Six-Generator System

      emission resulted for using Conventional Method, EP and RGA for various power demands is provided in table 5.9 and an illustration for power demand of 700 MW is shown in Fig.5.3 The emission resulted for using the proposed optimization technique is very much reduced when compared to the other techniques. This case is true not only for particular power demand rather it is true for all cases. By considering the overall result, it can be suggested that the usage of proposed technique will reduce the fuel cost as well as the emission output; Hence the total cost of the system is minimized and its comparison with other techniques is given in Table 5.10 .

      Table 5.8 Fuel Cost (Rs/hr) for Different Optimization Techniques

      Optimization Techniques

      Power Demand (MW)

      700

      900

      1100

      Conventional

      37781

      48892

      61208

      EP

      37519

      48318

      59929

      RGA

      37481.41

      48224.73

      59872.05

      8.03

      8.02

      Total fitnesscost in Rs/hr

      Total fitnesscost in Rs/hr

      8.01

      8

      4

      x 10

      Table 5.9 Emission Output (kg/h) for Different Optimization Techniques

      Optimization Techniques

      Power Demand (MW)

      700

      900

      1100

      Conventional

      442

      701

      1044

      EP

      439

      695

      1035

      RGA

      438.76

      694.42

      1034.244

      7.99

      7.98

      7.97

      7.96

      0 20 40 60 80 100

      No of generations

      Fig.5.2. Convergence characteristics of RGA for the load demand 900 MW

      The proposed Real coded genetic algorithm (RGA) technique is evaluated with the results of optimization techniques like Evolutionary Programming (EP) and Conventional Lambda iteration Method proposed by Venkatesh et al [18]. The fuel cost required by various techniques is provided in table 5.8. From the result, it can clearly suggest that the proposed technique is better which required lesser cost for the system operation when compared to other technique .The

      Table 5.10 Total Fuel Cost (Rs/h) for Different Optimization Techniques

      Optimization Techniques

      Power Demand (MW)

      700

      900

      1100

      Conventional

      57573

      82413

      61208

      EP

      56975

      79749

      111875

      RGA

      56930.46

      79678.46

      111780.77

    3. CEED with Practical constraints on IEEE 30 bus system

      The IEEE 30 bus system consists of six- thermal units and 41 transmission Lines. The generator cost coefficients, emission coefficients with valve point data and generation limits with ramp rate and prohibited zone data, Bmn coefficient matrix, are taken from [19].The

      proposed Real Coded Algorithm for solving Combined Economic and Emission dispatch for the above two case provide better results compared to other optimization techniques. Hence the proposed RGA method is used to solve the CEED for IEEE 30 bus system with practical constraints having the load demand of 283.4 MW. The CEED Solution of IEEE 30 bus system all the power demand considered is given in Table 5.11. First row shows the optimal scheduling of the Six-Generator units for each power demand. Second row and third row shows the minimized fuel cost in Rs/hr and emission output level in kg/h. Fourth row shows price penalty factor obtained from modified price algorithm in Rs/kg for different power demand. Fifth row shows system loss in MW. Sixth row shows the optimal total cost in Rs/h at which the system fuel cost and emission level is minimized. The convergence characteristics of minimum total cost obtain using real coded Genetic algorithm for the power demand considered is shown in fig 5.3

      1640

      1630

      fitness value

      fitness value

      1620

      1610

      1600

      1590

      1580

      0 10 20 30 40 50 60 70 80 90 100

      Generation

      Fig .5.3. Convergence characteristics of RGA For the load demand 700 M

      Table No.5.11 CEED Solution of IEEE-30 bus System for Demand of 283.4MW

      Power Demand (MW)

      283.4

      P1 (MW)

      145.0345

      P2 (MW)

      46.6183

      P3 (MW)

      27.0315

      P4 (MW)

      18.3124

      P5 (MW)

      23.9825

      P6 (MW)

      30.8432

      Fuel cost ($/h)

      864.8706

      Emission (Kg/h)

      364.3277

      PPF ($/Kg)

      1.9862

      Total system loss (MW)

      8.4224

      Total Cost ($/h)

      1588.4928

    4. Determination of Parameters for ProposedAlgorithm

The parameter values are selected by trial and error method.Inorder to obtain the optimal solution for implementing this CEED problem using GA, the population size of 50, maximum generation of 100, Crossover Probability of 0.5, Survival Selection Probability of 0.8 has been taken for optimization problem. Programs are developed and simulated using MATLAB 7.10 software package tool.

VI. CONCLUSION

The Proposed RGA algorithm was tested on 3-generator test system and 6-generator test system for determining the minimum operating cost by minimizing the fuel cost and emission output of the Combined Economic and Emission dispatch problem (CEED) and the results were presented for comparison with various optimization techniques such as Binary coded GA, EP, PSO and Conventional lambda iteration method. Results showed that RGA method is well suited for obtaining the best solution for operating cost, fuel cost and Emission output. Savings of approximately 25 Rs/hr and above were obtained by the RGA method for six generator test system. The modified price penalty factor to solve CEED problem corresponding to the load demands was carried out to obtain exact best solution. The Proposed RGA is also tested with IEEE 30 bus system by considering the non-linearity practical constraints such as transmission losses, ramp rate limits, and prohibited operating zone and valve point effect. Practical generator operation has been modeled by this proposed methodology since more realistic constraints have been incorporated. The solutions obtained are quite encouraging and useful in the practical economic emission environment.

REFERENCES

  1. IEEE Working Group, Potential impacts of clean air regulations on system operations, IEEE Trans. Power Syst., Vol 10.pp.647653. 1995.

  2. R.H. Miller, and J. H. Malinowski, Power System Operation, McGraw-Hill, Inc., 1994.

  3. A. A. El-Keib, H. Ma, and J. L. Hart, Economic dispatch in view of the clean air act of 1990, IEEE Trans. Power Syst., vol. 9, no. 2, pp.972978, May 1994.

  4. J.H.Talaq., F.EL-Hawary, M.E.EL-Hawary, A summary of environmental/economical dispatch algorithms, IEEE Trans. Power Syst.,1994, 9, (3), pp. 15081516

  5. C.Palanichamy and K.Srikrishna. Economic Thermal Power Dispatch with Emission Constraint Journal of the Institution of Engineers (India), vol 72, April 1991, pp 11-18.

  6. Rahmat-Allah Hooshmand, MoeinParategari, Mohammad JavadMorshed, Emission, reserve and economicload dispatch problem with non-smooth and non-convex cost functions using Bacterial Foraging -NelderMead algorithm Applied Energy 89(2012).

  7. K.P. Wong and J.Yuryevich, Evolutionary Programming Based Algorithm for Environmentally Constrained Economic Dispatch, IEEE Trans.Power Syst., vol.13, No.2, pp. 301, May 1998.

  8. Y. Zhang, D.W. Gong and Z. Ding, A bare-bones multi-objective particle swarm optimization algorithm for environmental/economic dispatch,article inpressdoi:10.1016/j.ins.2011.06.004.

  9. D. C.Walters and G. B. Sheble, Genetic algorithm solution of economic dispatch with valvepoint loading, IEEE Trans. Power Syst., vol. 8, Aug. 1993.

  10. Chao- Ming Haung, Hong-tzer Yang, and Ching- Lien Huang , Bi- Objective power Dispatch Using fuzzy satisfaction- maximizing decision approach, IEEE Trans. Power system, Vol. 12.

  11. M.A. Abido A niched pareto genetic algorithm for multiobjective environmental/economic dispatch,

    Electrical power and energy system 2003, vol. 25

  12. K.P. Wong and J.Yuryevich, Evolutionary Programming Based Algorithm for Environmentally Constrained Economic Dispatch, IEEE Trans.Power Syst., vol.13, No.2,pp. 301, May 1998

  1. Dun-wei Gong, Yong Zhang *, Cheng-liang Qi, Environmental/economic power dispatch using a hybrid multi-objective optimization algorithm, Electrical Power and Energy Systems, 2010, vol. 32, pp. 607614.

  2. M.A. Abido, Multiobjective particle swarm optimization for environmental/economic dispatch problem, Electric Power Systems Research, vol. 79, pp. 1105-1113, July 2009.

  3. S. Dhanalakshmi, S. Kannan, K Mahadevan, S. Baskar, Application of modified NSGA-II algorithm to combined economic and emission dispatch problem, Electric Power Energy System 2011;33(4):9921002.

  4. S. MuthuVijayaPandian, K. Thanushkodi, An Efficient Particle Swarm Optimization Technique to Solve Combined Economic Emission Dispatch Problem, European Journal of Scientific Research,1450-216X, Vol.54 No.2 (2011), pp.187- 192

  5. Y. Sonmez ,Multi-objective environmental/economic dispatch solution with penalty factor using artificial bee colony algorithm,Scientific Research and Essays Vol. 6 (13), pp. 2824-2831, 4 July, 2011

  6. D.P. Kothari, and J.S. Dhillion , Power system optimization, 2nd edition, PHI,2011,INDIA

  7. Naveen Kumar, K..P.SinghParmar and SurenderDahiya, A Genetic algorithm approach for the solution of economic load dispatch International Journal of Computer Science and Engineering (IJCSE), Vol. 4, NO. 6, 2012, 1063- 1068.

  8. Ganga Reddy Tankasala, Artificial Bee Colony Optimisation for Economc Load Dispatch of a Modern Power system, International Journal of Scientific & Engineering Research, Volume 3,