Assessment of Single and Precise Point Positioning Over Long Observational Periods

DOI : 10.17577/IJERTV8IS050112

Download Full-Text PDF Cite this Publication

Text Only Version

Assessment of Single and Precise Point Positioning Over Long Observational Periods

Mohamed El-Tokhey

Public Works Department

Faculty of Engineering, Ain Shams University Cairo, Egypt

Ahmed Ragheb

Public Works Department

Faculty of Engineering, Ain Shams University Cairo, Egypt

Tarek Hassan

Public Works Department

Faculty of Engineering, Ain Shams University Cairo, Egypt

Abstract: In this work, the accuracy of using Single Point Positioning (SPP) and Precise Point Positioning (PPP) techniques is assessed in case of using long observational periods. Positioning using Differential Global Navigation Satellite System (DGNSS) technique is adopted to achieve reliable accurate results to be used as a reference in the evaluation process for both SPP and PPP positioning techniques. A number of neighboring International GNSS Service (IGS) stations were participated in this study for the differential positioning. GNSS data over one month for a continuous operating station at Faculty of Engineering, Ain Shams University were collected and processed on a daily basis in the SPP and PPP processing modes. In addition, DGNSS processing sessions using the IGS stations were carried out for each day of the month. The positional differences for both SPP and PPP solutions with respect to the DGNSS solutions were computed. The results showed that the SPP solutions had positional differences with mean value 23.4cm, while the PPP solutions had positional differences with mean value 12.7cm. In addition, by considering a unique monthly solution for each technique, the positional difference reaches to 15 cm in case of the SPP solution and 12.5 cm in case of the PPP solution. Thus, applications that do not require immediate positioning, such as wildlife management and insect infestation, can benefit from these results with low-cost hardware components. In addition, monitoring significant tectonic motions caused by earthquakes is another application in this context.

Keywords DGNSS, IGS, PPP, SPP.

  1. INTRODUCTION

    In recent years, there has been continuous interest in achieving high positional accuracy using a single GNSS receiver (standalone receiver). The need to lower the costs of differential (relative) positioning using multiple receivers in addition to saving time and effort while occupying multiple stations have always pushed for accelerating steps to achieve prompt higher positional accuracy using single receiver.

    GNSS has shown the capacity to deliver much improved positioning services and accuracy due to the modernization of the satellite system, significantly upgraded error estimation models, much increased mobility for the end-user receivers, and more reliable and rapid integer ambiguity resolution approaches [1].

    The coordinates of a single point are determined by point positioning when using a single receiver while measuring

    pseudoranges to (normally four or more) satellites. Instead of "point positioning", the term "Single Point Positioning" or "SPP" is used [2]. Various relevant references always emphasize that SPP is suitable for navigation and not for surveying works as the positioning accuracy degrades to few meters due to different biases caused by the ionosphere and troposphere signal propagation media, satellite clock, orbital data and other evolving errors [2]. This study discusses how far the SPP solution accuracy can reach by using long observational periods of GNSS data.

    Also, this study discusses the positioning accuracy of another breakthrough in the GNSS field which is the precise point positioning technique (PPP). IGS has ensured open access and high-quality GNSS data products since 1994. These products enable access to the definitive global reference frame for different scientific and commercial applications. IGS products include different information such as GNSS satellite ephemerides and satellite clock information, which can be used to provide orbit/clock corrections for the PPP solutions.

    A number of software packages can be used to process the GNSS data in both SPP and PPP processing modes. The used software in this study is RTKLIB version 2.4.2 which is an open source program package for standard and precise positioning with GNSS. RTKLIB employs an iterated weighted Least Square Estimation (LSE) for the SPP mode, while it uses Extended Kalman Filter (EKF) estimation process for the PPP mode [3].

    The assessment strategy for both SPP and PPP techniques relies on the existence of a continuous operating station at Faculty of Engineering, Ain Shams University to collect GNSS data over long period (one month in this study). DGNSS solutions for the collected data are obtained, by involving six neighboring IGS stations in the processing sessions, to be used as a reference in the evaluation process for the quality and applicable usability of both SPP and PPP positioning techniques.

  2. COLLECTED DATA

    The GNSS data used in the different processing stages in this study were acquired from the continuous operating station at Faculty of Engineering, Ain Shams University with a Trimble NetR9 GNSS reference receiver which offers 440

    channels for GNSS multiconstellation tracking performance and supports a wide range of satellite signals. Currently, the NetR9 platform is capable of tracking signals from GPS, GLONASS, Galileo, Beidou, and QZSS constellations [4]. GNSS data from these constellations will be used in this study. The continuous operating station at Faculty of Engineering, Ain Shams University was given the name "SHMS". More details about the establishment and operation of this station can be found in [5].

    Receiver INdependent EXchange (RINEX) data files for the observations of SHMS station in June, 2017 were acquired in the form of 30 one-day RINEX data files with one second sampling rate; one file for each day of the month. Also, the IGS final orbits files were acquired from the Crustal Dynamics Data Information System (CDDIS) data center which is one of the IGS data centers that can be used to download the different IGS products and the RINEX data files for all IGS stations.

    For the SPP and PPP processing modes, the acquired RINEX data files for SHMS station and the files of the IGS final orbits (for PPP) are sufficient to proceed on the processing stage. However, the DGNSS processing mode is not that simple and other data are needed. Basically, it is essential to obtain the RINEX data files for a number of available neighboring IGS stations in the form of 30 one-day RINEX files; one for each day of month June, 2017. The chosen IGS stations to be involved in this study are listed in Table I, while Figure 1 shows the location of the used IGS stations, in addition to SHMS station.

    TABLE I. CHOSEN IGS STATIONS INVOLVED IN THE IGS DGNSS TECHNIQUE

    Site

    ID

    NICOSIA-ATHALASSA

    NICO

    Noto

    NOTl

    Ohrid

    ORID

    Haifa

    BSHM

    Mitzpe Ramon

    RAMO

    Metzoki Dragot

    DRAG

    Fig. 1. Involved IGS stations along with SHMS station

    In addition, and to relate all processing and analysis stages to a specific reference system, International Terrestrial Reference Frame 2008 (ITRF2008) is adopted in this study. Position coordinates for the chosen IGS stations were obtained

    from the ITRF website [6] to be used in the DGNSS processing mode as contraints. ITRF2008 coordinates for all chosen stations were obtained for the 30 days of the month (at epochs 1/6/2017, 2/6/2017, 3/6/2017, ………., 30/6/2017).

    It should be noted that the World Geodetic System 1984 (WGS84) – G1762 reference frame compared to ITRF2008 shows Root Mean Square (RMS) difference of one centimeter overall [7]. Comparisons between the National Geospatial- Intelligence Agency (NGA) GPS precise ephemerides, referenced to WGS84 (G1762), and the IGS GPS precise ephemerides, referenced to ITRF2008, validate that the two reference systems are consistent. This indicates that these two reference frames are essentially identical with differences being statistically insignificant for most applications [7]. This note is necessary to avoid any confusion caused by referencing the SPP and PPP solutions to the WGS84 reference system while referencing the DGNSS solutions to the International Terrestrial Reference System (ITRS).

  3. DATA PROCESSING

    As discussed earlier, the collected data were processed in three modes: DGNSS, SPP and PPP.

    DGNSS processing mode was performed once for each day of the month and for this processing mode, Trimble Business Center (TBC) software was used. The input data for each processing session (each day) are the RINEX files for SHMS station and the used IGS stations at this day in addition to the corresponding ITRF2008 coordinates of each IGS station to be used as constraints in the adjustment solution.

    The GNSS observables collected at reference stations for the post-processing positioning are likely to be provided by a public data service on a routine basis with a large sampling interval of 30 seconds. This low-rate data might lead to non- matching observations with another high-rate data, e.g., sampling interval of one second or five seconds [8]. In this study, the RINEX data files acquired from SHMS station are of one-second sampling interval, while the RINEX data files acquired from the used IGS stations have a sampling interval of 30 seconds. To achieve the highest possible accuracy for using one-second sampling interval in the differential solutions, GNSS observables are required to have the same sampling interval for the two baseline stations. Consequently, the DGNSS solutions in this study will adopt a 30-second sampling interval in the processing stage. In addition, it should be noted that there are a number of implemented algorithms and techniques for pseudorange and carrier phase reference station data interpolation at a high level of accuracy to overcome the sampling interval synchronization problem. In [8] and [9], detailed discussions concerning this issue are presented.

    Finally, the DGNSS processing sessions were performed for each day keeping in mind that at least, four IGS stations participated in each session. The absence of one or two stations at any session is caused by the unavailability of some IGS stations RINEX data files at this day. The GNSS final orbits files were used in the processing while the most desirable mask angle of 15 degrees was guaranteed [10]. Table II shows statistics of standard deviations of the resulted coordinates in the X-direction (x), in the Y-direction (y) and in the Z- direction (z) over the month for DGNSS solutions.

    TABLE II. STATISTICS OF STANDARD DEVIATIONS OF THE RESULTED COORDINATES OVER THE MONTH FOR DGNSS SOLUTIONS

    Value

    x (m)

    y (m)

    z (m)

    Minimum

    0.016

    0.011

    0.012

    Maximum

    0.047

    0.026

    0.036

    Mean

    0.029

    0.017

    0.022

    RTKLIB software was used to process the data in both SPP and PPP modes. SPP processing is performed once for each day of the month using the acquired RINEX data for SHMS station. The broadcast ephemeris is the adopted satellite ephemeris in this mode, Ionospheric Free Linear Combination (Iono-Free LC) is used as an ionosphere correction, Estimated Zenith Total Delay (Estimated ZTD) is used as a troposphere correction which was recommended by [11], while the used mask angle is 15 degrees. Table III shows statistics of x, y and z of the resulted coordinates over the month.

    TABLE III. STATISTICS OF STANDARD DEVIATIONS OF THE RESULTED COORDINATES OVER THE MONTH FOR SPP SOLUTIONS

    Value

    x (m)

    y (m)

    z (m)

    Minimum

    0.007

    0.005

    0.004

    Maximum

    0.008

    0.006

    0.006

    Mean

    0.009

    0.005

    0.005

    PPP processing mode is also performed once for each day of the month using the acquired RINEX data for SHMS station. Unlike the SPP processing mode, the files of the IGS final orbits (precise ephemeris files) are used in the PPP processing mode while using the same processing parameters regarding ionosphere correction, troposphere correction and mask angle. Table IV shows statistics of x, y and z of the resulted coordinates over the month.

    TABLE IV. STATISTICS OF STANDARD DEVIATIONS OF THE RESULTED COORDINATES OVER THE MONTH FOR PPP SOLUTIONS

    Value

    x (m)

    y (m)

    z (m)

    Minimum

    0.004

    0.003

    0.002

    Maximum

    0.004

    0.003

    0.003

    Mean

    0.004

    0.003

    0.002

    Figures 2, 3, and 4 show the resulted coordinate variations over the month for the X, Y, and Z coordinates, respectively, in case of using the DGNSS, SPP and PPP positioning techniques. For publication purposes, certain number was subtracted from all X coordinates in Figure 2 and the same procedure was done for Y and Z coordinates in Figures 3 and 4, respectively.

    It is clear from Figures 2, 3 and 4 that DGNSS solutions are the most stable solutions and this result was expected. This stability in addition to the reliability of DGNSS solutions are the reasons behind choosing these solutions as reference in the assessment process for both SPP and PPP solutions. In addition, the figures show that PPP soultions are much more stable than SPP solutions and the fluctuation in SPP solutions from one day to another is clear.

    It is well known that the accuracy of SPP and PPP solutions degrades with shorter observation periods. For completeness here, three additional processing sessions were performed to give a quick indication to the accuracy of SPP and PPP solutions in case of using a short observation period (4-hour observation period). A sample of 4-hour observation period, from 1 June 2017, was processed in the DGNSS, SPP and PPP modes to check the differences resulted between both SPP and PPP solutions and the DGNSS solution. The same processing parameters, used earlier to process the 24-hour observation periods in the different modes, were used here to process the 4- hour observation period.

    Table V shows x, y and z of the resulted coordinates using 4-hour observation period.

    TABLE V. STANDARD DEVIATIONS OF THE RESULTED COORDINATES USING 4-HOUR OBSERVATION PERIOD

    Mode

    x (m)

    y (m)

    z (m)

    DGNSS

    0.046

    0.028

    0.036

    SPP

    0.012

    0.009

    0.008

    PPP

    0.010

    0.006

    0.006

  4. DATA ANALYSIS AND RESULTS

    At this stage, the DGNSS solutions are considered as the reference in the ealuation process of the quality and accuracy of the SPP and PPP solutions. Based on this consideration, the daily coordinate differences between the SPP and the DGNSS solutions as well as the daily coordinate differences between the PPP and the DGNSS solutions were computed using the following equations:

    = (1)

    = (2)

    = (3)

    = 2 + 2 + 2 (4)

    where

    , and are the coordinate differences in the , and

    directions, respectively.

    , and are the resulted SPP or PPP coordinates.

    , and are the resulted DGNSS coordinates.

    is the positional difference between DGNSS solution and SPP solution or PPP solution.

    For the resulted coordinates using 4-hour observation period, the differences between both SPP and PPP solutions and the DGNSS solution are listed in Table VI.

    TABLE VI. COORDINATE DIFFERENCES BETWEEN THE SPP AND PPP SOLUTIONS AND THE DGNSS SOLUTION

    Modes

    X (m)

    Y (m)

    Z (m)

    P (m)

    SPP-DGNSS

    0.629

    0.278

    0.513

    0.858

    PPP-DGNSS

    0.155

    -0.172

    0.050

    0.237

    Table VI emphasized large positional differences that resulted from using only 4-hour observation period. On the

    Day

    (m)

    (m)

    (m)

    (m)

    1

    0.023

    -0.140

    -0.200

    0.245

    2

    -0.119

    -0.169

    -0.107

    0.233

    3

    -0.136

    -0.090

    -0.088

    0.186

    4

    0.102

    -0.161

    -0.019

    0.191

    5

    -0.067

    -0.229

    -0.120

    0.267

    6

    0.182

    -0.127

    -0.065

    0.231

    7

    -0.118

    -0.276

    -0.180

    0.350

    8

    -0.121

    -0.220

    -0.160

    0.297

    9

    0.292

    -0.049

    0.058

    0.302

    10

    0.086

    -0.238

    -0.151

    0.295

    11

    -0.145

    -0.181

    -0.144

    0.273

    12

    0.112

    -0.015

    -0.208

    0.237

    13

    0.241

    0.019

    -0.020

    0.243

    14

    -0.026

    -0.234

    -0.199

    0.308

    15

    0.253

    0.029

    0.035

    0.257

    16

    0.306

    -0.129

    -0.062

    0.338

    17

    -0.044

    -0.164

    -0.040

    0.174

    18

    -0.021

    -0.120

    -0.120

    0.171

    19

    0.153

    0.084

    0.032

    0.177

    20

    0.223

    0.045

    0.050

    0.233

    21

    0.112

    -0.153

    -0.061

    0.199

    22

    0.000

    -0.023

    -0.089

    0.092

    23

    0.136

    0.014

    -0.011

    0.137

    24

    0.122

    -0.141

    -0.112

    0.218

    25

    -0.040

    -0.038

    -0.108

    0.122

    26

    -0.209

    -0.328

    -0.291

    0.485

    27

    0.111

    -0.127

    0.098

    0.195

    28

    -0.039

    -0.110

    -0.166

    0.203

    29

    0.141

    -0.064

    -0.038

    0.160

    30

    0.189

    -0.063

    0.038

    0.203

    Day

    (m)

    (m)

    (m)

    (m)

    1

    0.023

    -0.140

    -0.200

    0.245

    2

    -0.119

    -0.169

    -0.107

    0.233

    3

    -0.136

    -0.090

    -0.088

    0.186

    4

    0.102

    -0.161

    -0.019

    0.191

    5

    -0.067

    -0.229

    -0.120

    0.267

    6

    0.182

    -0.127

    -0.065

    0.231

    7

    -0.118

    -0.276

    -0.180

    0.350

    8

    -0.121

    -0.220

    -0.160

    0.297

    9

    0.292

    -0.049

    0.058

    0.302

    10

    0.086

    -0.238

    -0.151

    0.295

    11

    -0.145

    -0.181

    -0.144

    0.273

    12

    0.112

    -0.015

    -0.208

    0.237

    13

    0.241

    0.019

    -0.020

    0.243

    14

    -0.026

    -0.234

    -0.199

    0.308

    15

    0.253

    0.029

    0.035

    0.257

    16

    0.306

    -0.129

    -0.062

    0.338

    17

    -0.044

    -0.164

    -0.040

    0.174

    18

    -0.021

    -0.120

    -0.120

    0.171

    19

    0.153

    0.084

    0.032

    0.177

    20

    0.223

    0.045

    0.050

    0.233

    21

    0.112

    -0.153

    -0.061

    0.199

    22

    0.000

    -0.023

    -0.089

    0.092

    23

    0.136

    0.014

    -0.011

    0.137

    24

    0.122

    -0.141

    -0.112

    0.218

    25

    -0.040

    -0.038

    -0.108

    0.122

    26

    -0.209

    -0.328

    -0.291

    0.485

    27

    0.111

    -0.127

    0.098

    0.195

    28

    -0.039

    -0.110

    -0.166

    0.203

    29

    0.141

    -0.064

    -0.038

    0.160

    30

    0.189

    -0.063

    0.038

    0.203

    other hand, Table VII shows the resulting coordinate differences between PPP and DGNSS solutions, while Table VIII shows the resulting coordinate differences between SPP and DGNSS solutions using 24-hour observation period. In addition, these differences are plotted together in Figure 5.

    TABLE VII. RESULTING COORDINATE DIFFERENCES BETWEEN PPP AND DGNSS SOLUTIONS

    TABLE VIII. RESULTING COORDINATE DIFFERENCES BETWEEN SPP AND DGNSS SOLUTIONS

    Day

    (m)

    (m)

    (m)

    (m)

    1

    0.113

    -0.001

    0.021

    0.115

    2

    0.136

    0.014

    0.029

    0.140

    3

    0.135

    0.014

    0.036

    0.140

    4

    0.140

    0.021

    0.035

    0.145

    5

    0.149

    0.028

    0.041

    0.157

    6

    0.122

    0.005

    0.022

    0.124

    7

    0.112

    0.005

    0.025

    0.115

    8

    0.105

    0.002

    0.025

    0.108

    9

    0.112

    0.002

    0.030

    0.116

    10

    0.076

    -0.001

    0.014

    0.077

    11

    0.099

    -0.025

    0.012

    0.103

    12

    0.107

    0.016

    0.032

    0.113

    13

    0.096

    -0.005

    0.022

    0.099

    14

    0.116

    -0.033

    0.015

    0.121

    15

    0.174

    0.029

    0.063

    0.187

    16

    0.164

    0.022

    0.054

    0.174

    17

    0.139

    0.003

    0.028

    0.142

    18

    0.141

    0.008

    0.035

    0.145

    19

    0.153

    0.015

    0.041

    0.159

    20

    0.142

    0.030

    0.033

    0.149

    21

    0.107

    0.022

    0.022

    0.111

    22

    0.122

    0.029

    0.031

    0.129

    23

    0.117

    0.031

    0.030

    0.125

    24

    0.109

    -0.012

    0.023

    0.112

    25

    0.101

    0.009

    0.024

    0.104

    26

    0.105

    -0.019

    0.030

    0.111

    27

    0.112

    -0.008

    0.029

    0.116

    28

    0.116

    -0.002

    0.028

    0.119

    29

    0.125

    0.004

    0.022

    0.127

    30

    0.129

    0.001

    0.023

    0.131

    Fig. 2. X coordinate time series over the month in case of the SPP, PPP and DGNSS solutions

    Fig. 3. Y coordinate time series over the month in case of the SPP, PPP and DGNSS solutions

    Fig. 4. Z coordinate time series over the month in case of the SPP, PPP and DGNSS solutions

    Fig. 5. Positional differences between DGNSS solutions and both SPP and PPP solutions over the month

    Table IX and Figure 6 show statistics of the resulting daily differences between the PPP and DGNSS solutions.

    TABLE IX. STATISTICS OF THE RESULTED DIFFERENCES BETWEEN PPP AND

    DGNSS SOLUTIONS OVER 30 DAYS

    Value

    Minimum (m)

    0.076

    0.001

    0.012

    0.077

    Maximum (m)

    0.174

    0.033

    0.063

    0.187

    Mean (m)

    0.122

    0.014

    0.029

    0.127

    RMS (m)

    0.120

    0.017

    0.030

    0.125

    Fig. 6. Statistics of the resulted differences between the PPP and DGNSS solutions

    On the other hand, Table X and Figure 7 shows statistics of the resulting daily differences between the SPP and DGNSS solutions.

    TABLE X. STATISTICS OF THE RESULTED DIFFERENCES BETWEEN SPP AND DGNSS SOLUTIONS OVER 30 DAYS

    Valu e

    (m)

    (m)

    (m)

    (m)

    Min.

    0.000

    0.014

    0.011

    0.092

    Max.

    0.306

    0.328

    0.291

    0.485

    Mean

    0.129

    0.126

    0.102

    0.234

    RMS

    0.151

    0.151

    0.123

    0.246

    Fig. 7. Statistics of the resulted differences between the SPP and DGNSS solutions

    If a unique monthly solution for each processing mode is considered, the weighted mean values of the processed days (30 days) have to be calculated. The resulted differences between the SPP solution and the DGNSS solution was found to be 15cm in the positional difference. On the other hand, the resulted differences between the PPP solution and the DGNSS solution was found to be 12.5cm in the positional difference. Thus, it is clear that the accuracy of both SPP and PPP techniques is very close to each other in case of considering a unique monthly solution.

  5. CONCLUSION

An accuracy assessment for the SPP and PPP techniques was performed to evaluate the quality of applying both techniques in case of long observational periods. Data

collected, from a continuous operating station at faculty of engineering, Ain Shams University, for June 2017 was used in this study. The final results showed that the SPP solutions had a positional difference with respect to the DGNSS solutions ranging from 9.2 cm to 48.5 cm with mean value 23.4cm and RMS value 24.6cm over the month. By considering a unique monthly solution (weighted mean value), the positional difference reaches to 15 cm. On the other hand, the PPP solutions had a positional difference with respect to the DGNSS solutions ranging from 7.7cm to 18.7cm with mean value 12.7cm and RMS value 12.5cm over the month. By considering a unique monthly behavior, thepositional difference reaches to

12.5 cm. Finally, it is clear that the accuracy of both SPP and PPP techniques is very close to each other in case of considering a unique monthly solution. Thus, applications that do not require immediate positioning, such as wildlife management and insect infestation, can benefit from these results with low-cost hardware components. In addition, monitoring significant tectonic motions caused by earthquakes is another application that can benefit from these results keeping in mind that there will be no need to apply any post- processing corrections to the measurements and thus, the system cost can be reduced significantly.

REFERENCES

  1. X. Meng, A.H. Dodson, T. Moore, and G. Roberts. Ubiquitous Positioning: Anyone, Anything, Anytime, Anywhere. GPS World, 18(6): 60-65, 2007.

  2. B. Hofmann-Wellenhof, H. Lichtenegger, and J. Collins. Global Positioning System, Theory and Practice, Fifth, revised edition. Springer-Verlag Wien GmbH, 2001.

  3. T. Takasu. RTKLIB ver. 2.4.2 Manual, April 29, 2013.

  4. Trimble Inc. NetR9 GNSS Reference Receiver User Guide, version 4.15, revision A, May 2010.

  5. M. El-Tokhey, Y. M. Mogahed, M. Mamdouh, T. W. Hassan. Establishment of New Continuous Operating Reference Station (CORS) at Faculty of Engineering, Ain Shams University. International Journal of Engineering and Advanced Technology (IJEAT), ISSN: 2249 8958, Volume-7 Issue-4, April 2018.

  6. http://itrf.ensg.ign.fr/site info and select/ solutions extraction.php

  7. National Geospatial-Intelligence Agency (NGA). Department of Defense World Geodetic System 1984: Its Definition and Relationships with Local Geodetic Systems, July 8, 2014.

  8. C. C. Chang and H. Y. Lee. Performance of High Rate Interpolated Data Applied to GPS Kinematic Positioning. Survey Review, 43, 321 pp.303- 313, DOI 10.1179/003962611X13055561708425, July 2011.

  9. T. Schüler. 10 Hz or 10 s? GPS Solutions, 11:77-83, DOI 10.1007/s10291-006-0034-8, 2007.

  10. Mohd Hafiz Yahya and Md Nor Kamarudin. Analysis of GPS Visibility and Satellite-Receiver Geometry Over Different Latitudinal Regions. International Symposium on Geoinformation (ISG 2008) at: Kuala Lumpur, Malaysia, January 2008.

  11. I. F. Shaker, T. F. Fath-Allah, M. M. El-habiby, A. E. Ragheb and A. I. Awad. Enhancement of Precise Point Positioning Using GPS Single Frequency Data. International Journal of Scientific & Engineering Research, Volume 7, Issue 12, December 2016.

Leave a Reply