Congestion Management in a Deregulated Power System with Thyristor Controlled Series Capacitor
Guguloth Ramesp, T.K. Sunil Kumar 2
1, 2 Department of Electrical Engineering, National Institute of Technology Calicut, Kerala, India
Abstract
This paper presents congestion management in deregulated power systems. In a deregulated environment, every buyer wants to buy power from the cheapest generator available, irrespective of relative geographical location of buyer and seller. As a consequence of this, the transmission corridors evacuating the power of cheaper generators would get overloaded if all such transactions are approved. Congestion management is a mechanism to prioritize the transactions and commit to such a schedule which would not overload the network. The congestions in the transmission lines are determined by optimal power flow solution, which is carried based primal liner programming method and congestion in the transmission lines have been alleviated by optimal placement of thyristor controlled series capacitor. A method to determine the optimal location of thyristor controlled series capacitor has been suggested based on real power flow performance sensitivity index based approach. The effectiveness of proposed method has been demonstrated on modified IEEE-14 and 30 bus test systems.
-
Introduction
The privatization and deregulation of electricity markets has a very large impact on almost all the power systems around the world. Competitive electricity markets are complex systems with many participants who buy and sell electricity. In competitive market, system security plays a vital role from the market/system point of view. When power producers and consumers of electrical energy desire to produce and consume in total amount that would cause the transmission system to operate at or beyond one or more transfer limits, the system is said to be congested [1]. Congestion is a technical problem, which occurs frequently in deregulated power Systems due to transmission line insufficient transfer capabilities and line outages in the systems, and competition among the power consumers and power producers [2].
Congestion management is a mechanism to prioritize the transactions and commit to such a schedule which would not overload the network. Despite these measures, congestion can still occur in real time following a forced outage of transmission line. The system operator then handles this situation by means of real time congestion management. Thus, congestion management involves precautionary as well as remedial action on system operators part [3]. The scope of transmission congestion management in the deregulated environment involves defining a set of rules to ensure control over generators and loads in order to maintain acceptable level of system security and reliability [4]. Congestion in transmission line is relied by load curtailment, generation rescheduling, built new parallel transmission line and connect Flexible AC Transmission System (FACTS) devices in the systems [5-6].
FACTS devices provide new control facilities, both in steady state power flow control and dynamic stability control [7-8]. The possibility of controlling power flow in an electric power system without generation rescheduling or load curtailment changes can improve the performance considerably [9]. Using controllable components such as controllable series capacitors and phase shifters line flows can be changed in such a way that thermal limits are not violated, losses minimized, stability margin increased, contractual requirement fulfilled etc, without violating specified power dispatch [10].
The increased interest in these devices is essentially due to two reasons. Firstly, the recent development in high power electronics has made these devices cost effective and secondly, increased loading of power systems, combined with deregulation of power industry, motivates the use of power flow control as a very cost effective means of dispatching specified power transactions. It is important to ascertain the location for placement of these devices because of their considerable costs [11-12].
This paper is describes congestion management in deregulated power system with thyristor controlled series capacitor. The congestion problem is occurred in IEEE 14 and 30 Bus systems due to competition in consumers in deregulated environment, which is determined by optimal power flow solution based on primal liner programming method. The bus data, line data and generation data are taken of IEEE 14 and 30 bus systems from [13]. The remedial action has been
, , (8)
0 (9)
Where, , are real and reactive power generations and , are real and reactive power demand at bus . , , , and , , , are real and reactive power minimum and maximum
generation limits at bus . , , , and
taken by thyristor controlled series capacitor (TCSC),
and the optimal placement of TCSC is found by real
,
, ,
are real and reactive power minimum
line flow sensitivity index, where which line have most negative real power line flow sensitivity is the best location for placement of TCSC.
This paper is organized as follows: Section 2 deals with congestion management. Section 3, presents Thyristor Controlled Series Capacitor (TCSC) has been modeled in the systems. Section 4, describes sensitivity approach method. Section 5, presents simulations results at various operating conditions. Section 6, concludes the paper.
-
Congestion Management
The basic principle for the transmission congestion management could be illustrated with the help of the traditional spot pricing theory. In this framework, the central dispatcher optimally dispatches the generators such that the social welfare is maximized while satisfying the operation and security related constraints. Specifically, the dispatcher solves the following optimization problem with optimal power flow solution, which is carried by primal linear programming method to maximize the social welfare, where changes system controls to enforce liveried constraints while minimize the cost:
min( (1)
and maximum demand limits at bus .
The objective function is cost function for generating real power , and is demand function at bus . is the bilateral transaction between suppliers at node and consumer at node . By solving above optimization problem the generation schedule can be obtained and with this schedule lines flow can be found. Then check whether all line flows are within the maximum limits are not, if any (one or more) of
line flow exceeds the limit that the line is said to be congested and it has to be relieved as quickly as possible. Here congestion is relieved by thyristor controlled series capacitor has been placed in optimal location of the system.
-
Static Modelling of TCSC
The effects of FACTS devices like TCSC on the network can be seen as a controllable reactance inserted in the related transmission line. The model of the network with TCSC is shown in Fig.1.
=1
Subjected to
=1
=1
=1
= cos (2)
=1
=1
= sin (3)
, , (4)
, , (5)
, , (6)
, , (7)
Fig.1. Modelling of transmission line with TCSC
During steady state the CSC can be considered as a static capacitor/ reactor offering impedance . The basic idea behind series capacitive compensation is to decrease the overall effective series transmission line impedance from sending end to receiving end. Since losses are neglected, the impedance of TCSC is purely
reactive. The capacitive reactance of TCSC is obtained from equation (10) is given by
=
1
(10)
case with many small violations may be comparable in value to the index for a case with one huge violation, is known as congestion. By most of the operational
Where and are capacitive and inductive reactance of TCSC. Moreover, to avoid over compensation of the line, the working range of the TCSC is considered to be (-0.5 and 0.5), where is total line inductive reactance before connecting TCSC. The controllable reactance is directly used variable to be implemented in the power flow equations. The real and reactive power flow equations of the branch flowing from bus to can be expressed as:
= 2 cos + sin (11)
standards, the system with one huge violation is much more severe than that with many small violations. The congestion can be an avoided using lower order performance index that is < 1 .
The real power flow sensitivity factor with respect to the parameters of TCSC can be defined as
= = 0 (15)
The sensitivity of with resect to TCSC parameter connected between bus and bus can be written as
2
=
4
3 1
= + sin
=1
3
(16)
cos (12)
The real power flow in a line can be represented in
= 2 + + sin +
terms of real power injection using DC power flow
cos (13)
equations, were is slack bus, as
2
2
=1
2
2
Where =
+
2 and =
+
2
=
(17)
=1
+
=
The TCSC can improve maximum power transfer capacity of line as well as improve the voltage profile of the system; it is assumed that only one TCSC per lines is allowed because considerable cost of TCSC.
Using equation (17), the following relation can be derived as bellow
+
-
Method of Optimal Location of TCSC
=
+
+
=
(18)
The real power flow power flow performance index sensitivity approach method is taken for finding optimal location of TCSC, to relieve congestion
problem in the system. The severity of the system
The terms and can be derived as
loading under normal and contingency cases can be described by a real power line flow performance index, as given below
bellow
=0
=0
=
2
=
=1 2
(14)
=0
=0
Where the real power is flow and is the rated
= 2(2 cos
)
capacity of line , is the exponent and a real non-
2 + 2 2
negative weighting coefficient which may be used to
2 2
reflect the importance of the lines. will be high,
+ cos
(19)
2 + 2 2
when all the lines are within their limits and reach a small value when there is congestion. Thus, it provides a good measure of severity of the line congestion for given state of the test system. The lack of discrimination, in which the performance index for a
7
4
5
-2.288
8
4
7
-4.030
9
4
9
-1.9675
15
7
9
-1.5087
17
9
14
-0.9525
7
4
5
-2.288
8
4
7
-4.030
9
4
9
-1.9675
15
7
9
-1.5087
17
9
14
-0.9525
=
=0
= 2(2 cos
=0
)
2 + 2 2
2 2
+ cos
(20)
2 + 2 2
The location of TCSC can be based on static or dynamic performance of the system. The sensitivity factor method is generally used to find the best location to enhance the static performance of the system. Here in method, TCSC should be placed in a line having most negative sensitivity index.
-
Test Results
5.1 IEEE 14 Bus Systems
IEEE 14 Bus system has been considered as test bus in deregulated power system. Data of test bus system is taken form [13]. Fig.2 shows, modified IEEE14 bus system has been congested in line 10 (between buses 5- 6), congestion in the system has been created by the load increases 50 percentages at each bus. Solve Optimal Power Flow (OPF) solution with primal linear programming method; IEEE 14 bus systems have total Demand (259.3 MW & 78.9 MVAR), Generation (268 MW & 103.3 MVAR) and Loss (8.72 MW & 24.37
MVAR). After OPF solution check whether all line flows are within the maximum limits are not, where the line 10 (between buses 5-6) is congested due to transfer limit exceeds. Congested system the marginal cost per unit is different at each bus, total generation cost of the system per hour is: 2907.80 $/h. The remedial action has been taken by TCSC is connected at optimal location in the system. Here the placement of the TCSC is fund by real power sensitivity performance index approach. Find the value with respect to TCSC is connected each line of the system, were the =
0.4 . The values of are given in table I.
Table I
Line No
From bus
To bus
sensitivity
1
1
2
-3.135
3
2
3
-2.77
Fig.2.Modified IEEE 14 bus system is congested in line 10 (between buses 5-6)
From table I, the line 8 (between buses 4-7) has most negative sensitivity, which the best placement of TCSC to connect in the system.
Fig.3 Congestion is relieved in modified IEEE 14 bus system in line 10 (between buses 5-6)
Fig.3 a show, the congestion is alleviated in line 10 by TCSC has been connected in the line 8 (between buses 4-7). Here congestion is reduced as well as voltage profile of the system improved, voltage profile
is improved by reducing reactive power loss in the system from 24.37 MVAR to 23.47 MVAR.
1.02
1
0.980.96
0.94
0.92
without TCSC With TCSC
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Fig.4 IEEE 14 Bus system voltage profile
Fig.4 shows, IEEE 14 Bus systems voltage profile with and without TCSC. Here the values of voltage are given in per unit (p.u) on Y-axis and buses on X-axis. Compare to with and without TCSC, in with TCSC case the voltage profile of the system little bit improved.
5.2 IEEE 30 Bus System
IEEE 30 Bus system has been taken as test bus in deregulated power system. Data of test bus system has been taken form [13]. Fig.5 shows, modified IEEE30 bus system has been congested, congestion is created in the system by the load increases 50 percentages at each bus. Solve Optimal Power Flow (OPF) solution with primal linear programming method; IEEE 30 bus systems have total Demand (290 MW & 130 MVAR), Generation (300 MW & 140.1 MVAR) and Loss (11.07 MW & 10.08 MVAR). After OPF solution check whether all line flows are within the maximum limits are not, where the line 4 (between buses 2-5) is congested due to transfer limit exceeds. Congested system the marginal cost per unit is different at each bus, total generation cost of the system per hour is: 3893.78 $/h.
The remedial action has been taken by TCSC is connected at optimal location in the systems. Here the placement of the TCSC is fund by real power sensitivity performance index approach. Find the value with respect to TCSC is connected each line of the system, were the = 0.4 . The values of are given in table II. From table II, the line 5 (between
buses 2-6) has most negative sensitivity, which the best placement to connect TCSC in the system.
Fig.5.Modified IEEE 30 bus system is congested line 4 (between buses 2-5)
Table II
Line No
From bus
To bus
sensitivity
2
1
3
-6.342
3
2
4
-7.053
5
2
6
-9.872
8
4
12
-4.814
11
6
8
-5.731
13
6
10
-3.889
Fig.6 Congestion is relieved in modified IEEE 30 bus system in line 4 (between buses 2-5)
Fig.6 is shown, the congestion has been alleviated in line 4 (between buses 2-5) in the system by TCSC has been connected in the line 5 (between buses 2-6). Here congestion is reduced in the system as well as improved voltage profile by reducing real power loss from 11.07 MW to 10.60 MW, and reactive power loss from 10.08 MVAR to 9.76 MVAR of the system.
1.02
without TCSC
1
With TCSC
0.98
0.96
0.94
0.92
0.9
1
3
5
7
9 11 13 15 17 19 21 23 25 27 29
Fig.7 IEEE 30 Bus system voltage profile
Fig.7 shows, IEEE 30 Bus systems voltage profile with and without TCSC. Here the values of voltage are given in per unit (p.u) on Y-axis and buses on X-axis. Compare to with and without TCSC, in with TCSC case the voltage profile of the system little bit improved.
-
Conclusion
Congestion management is an important issue in deregulated power systems. IEEE 14 and 30 bus test systems have been modeled in deregulated environment. Congestion has been created by increased load at bus in the system and congestion in the transmission is determined by optimal power flow solution, which is carried by primal linear programming method.
FACTS devices such as TCSC by controlling the power flows in the network can help to reduce the flows in heavily loaded lines. Because of the considerable costs of FACTS devices, it is important to obtain optimal location for placement of these devices.
The results presented in this paper show that real power performance sensitivity index along with TCSC should effectively used for determining optimal location of TCSC. The congestion in transmission lines of IEEE 14 and 30 bus test systems have been
alleviated by connected TCSC at optimal location in the systems.
References
-
R. H. Lasseter, Micro grids, Power Engineering Society Winter Meeting, Vol. 1, pp.305-308, 2002.
-
A.R. Abhyankar, S.A. Kaparde, Introduction to deregulated power industry, Indian Institute of Technology Bombay, Mumbai, year 2002.
-
Richard D. Christie, and Bruce f. Wollenberg, Transmission management in the deregulated environment, Proceeding of the IEEE, Vol.88, No.2, Feb 2000.
-
Ashwani Kumar, S.C. Srivastava, Congestion management in competitive market: a bibliography survey, Electrical power system research, 76(2005) 153-164.
-
Yuen, Sinder L.A, Congestion management in deregulated electricity markets, international conference on utility deregulation and restructuring and power technologies, pp 47-52, April 202.
-
L. Rajalakshmi, M.V. Suganyadev, congestion management in deregulated power system by series locating FACTS Devices, international journal of computer applications, pp.0975-8887, vol.3, no.8, January 2011.
-
N.G. Hingorani, Flexible AC transmission, IEEE Spectrum, pp. 4045, April-1993.
-
Guguloth Ramesh , T.K. Sunil Kumar, Power flow solution with flexible AC Transmission systems devices, International journal of electrical engineering and technology, Vol.4, No.4, pp.232-245, July-August 2013.
-
M. Noroozian , G. Anderson, Power flow control by use of controllable series components, IEEE Trans. on Power Delivery, Vol. 8, No. 3, July 1993, pp. 1420- 1429.
-
Keshi Reddy Saidi Reddy1, Narayana Prasad Padhy, Congestion management in deregulated power system using FACTS devices, IEEE conference 2006.
-
Srinivasa Rao Pudi, S.C. Srivastava, Optimal Placement of TCSC Based on a Sensitivity Approach for Congestion Management, Fifteenth National Power Systems Conference (NPSC), IIT Bombay, December 2008.
-
A.Marimuthu andS.Prakash, location of series facts device for relieving congestion in a deregulation, International Journal of Communications and Engineering Volume 06, No.6, Issue: 01 March 2012.
-
Wood A.J, Wollenberg BF, Power generation operation and control, New York, John Wiley; 1996.
-
Rich Christie, Power System Test Case Archive, University of Washington Electrical Engineering, Aug 1993.
Authors Information
Guguloth Ramesh is currently Research Scholar in Electrical Engineering Department, National Institute of Technology, Calicut, Kerala -673601, India. Date of Birth 23-05-1987. He completed
B. Tech Electrical engineering Department at Christu Jyothi Institute of Technology and Science under JNTU Hyderabad
in the year 2008, M .Tech in Electrical Engineering with Power System Specialization at NIT Calicut, in the year 2011. His interested areas in Research are Power Systems, Restructuring Power Systems, Flexible AC Transmission System, and Micro grid.
Dr .T.K. Sunil Kumar, Assistant Professor , Electrical Engineering Department, NIT Calicut, Kerala – 673601, India. He completed B. Tech in Electrical Engineering at
N.S.S College of Engineering, Palakkad. He has completed M
.Tech in Electrical Engineering at NIT Jamshedpur, and Ph. D. from
IIT Kharagpur. His interested areas are Model Matching Controller Design Methods with Applications in Electric Power Systems, Restructuring Power Systems, Flexible AC Transmission System, and Micro grid.