Control Strategy for DC Bus Voltage Regulation in Photovoltaic System with Battery Energy
Merahi Reda1,2, Chenni Rachid1,2 1Department of Electrical Engineering, University of Constantine
2MoDeRNa Laboratory, Constantine University, Constatine Algeria
Abstract: Currently, several studies and researches are focusing on improving the efficiency and performance of PV inverters connected to the network, all these studies based on the minimization of losses by reducing equipment, the development of new components, new designs and topologies, with reduced costs. In this work, we develop a new principle called the optimal distribution of power; this concept based on the creation of a bidirectional DC converter block with battery (BCB) to ensure high and stable DC voltage at the entrance of the PV inverter. Based on the simulation results obtained from Matlab/Simulink, it has found that it is necessary to control the DC voltage bus of PV inverter.
Keywords: PV, inverter, performance, efficiency, bidirectional converter, battery.
-
INTRODUCTION
The use of electricity generated from solar energy has recently become more common, perhaps because of the environmental threats arising from the production of electricity from fossil fuels and nuclear power. Although the efficiency of PV panels still poor, the PV energy is a great opportunity for several applications including residential and commercial buildings, electrical vehicles, water pumping systems, and rural applications. There are two types of PV system; the off-grid, also known as stand- alone system, which consists of PV array, storage system, and power conditioning unit. The other type is the grid connected system. This system provides energy to a load and/or to the utility according to the load conditions.
In order to increase PV proportion in these applications, the efficiency of the PV system should reach an acceptable range. This objective has led researchers to move toward different area of focus to achieve this goal at the cell, module, and array and system level; where a module consists of connected PV cells in one frame and array is a complete PV unit consisting of connected modules with structural support. The performance of the system do not depend only on the operation conditions
such as partial shadowing, high temperature, or degradation of electrical characteristics of several damaged panels, but they are also strongly dependent on the PV system configuration.
Although, a lot of researches focus on how to improve the efficiency of PV system by improving the system performance through looking for the best operation conditions for the PV system, optimum configuration topologies and implementing power electronics devices to improve the overall efficiency. In [7] the author discusses a comparative study of efficiency for topologies in photovoltaic energy conversion systems. He demonstrates that the decentralized topology is chosen as the best topology since it has higher efficiency and it is fault tolerant.
In [2-3], the concept of multi string is presented and compared with the either concept, this topology combines the advantages of string and centralized topologies as it increases the energy output due to its ability to follow the MPP of each string independently while using a central inverter for reduced cost
In the work of [15], the author makes experimental study of the concept of team concept. The objective of this concept is to modify the curve of output of the inverters to improve the efficiency of conversion of the energy in the region of the characteristic in which the PV generator is supplying energy to the inverter and where usually the efficiency of one inverter is very low.
In this paper, we propose a new system configuration approach using a bidirectional DC converter block with battery (BCB), for controlling the chagrining and discharging of battery, a controller is developed. This paper will cover, in section II, existing PV system configurations, in section III, the proposed topology, in section IV simulation model of PV systems, and the conclusion in section V.
-
EXISTING PV SYSTEM CONFIGURATIONS Reconfigurable architectures are of great interest
to system designers. This interest is gaining more
momentum as technological advances and improvements to system components become modular and allow for greater design flexibility and innovation. The utility interactive system, the simplest system in terms of design, is configured with added components to improve its efficiency. Currently the following configurations are found in the literature:
Central-inverter; multi-DC/DC-central inverter; string inverter; team inverter and module inverter configuration.
We present in this section only the dynamical configuration PV systems. The two main conceptions are the followings:
-
Master-slave Topology
In order to improve the reliability of the centralized topology, master-slave configuration was developed using a number of parallel inverters that are connected to the array as shown in Figure 17 (b). The required number of active inverters is chosen such that if one
inverter fails, the other inverters transform the whole generated power. Moreover, the inverters can be designed to operate according to the irradiance level, where for low irradiance level some of the inverters are shut down (14). This technique extends the lifetime of inverters and the overall efficiency. However, the cost of this topology is higher than that of the centralized topology and electrical mismatching loss due to
shading is still a problem PV [14] [7].
Fig1: Master slave configuration
-
Team Concept Topology
The Team-Inverter configuration, shown in Figure 17 (e), uses controllable switches to connect the parallel string inverters according to the solar insolation (16). The system connects the proper number of strings in parallel to a specific number of parallel inverters, thus maximizing the efficiency of the connected inverters. This topology is used for large PV systems; it combines the string technology with the master-slave concept. During low irradiance conditions, the generated energy from each string in the PV system does not match the optimal working efficiency of the inverters. Therefore,adding more than one string in parallel and connecting them to the optimal number of
inverters, the amount of energy will match the optimal working point of the chosen inverter(s). As the irradiance level increases, the PV array is divided into smaller strings to inverters to operate at their rated power.
Fig 2: Team inverter configuration
-
-
INVERTER EFFICIENCY
The following description of the simulationoriented models refers to the variables of the PV power conversion chain depicted in Fig.3:
Fig 3: Elements of the PV power conversion chain
The output of a grid-connected PV system depends on the PV/inverter sizing ratio (Rs) 1, defined as the ratio of PV array capacity at standard test conditions to the inverters rated input capacity. Properly matching PV and inverter rated capacities improves grid-connected system performance. Optimal sizing depends on local climate, surface orientation and inclination, inverter performance, and the PV/inverter cost ratio (T) [11].
Under low insolation (incident solar power), a PV array generates power below its rated capacity, leading to inverter operation at partial load. Inverter efficiency drops with part-load operation: it also becomes sub-optimal when a significantly undersized inverter is made to operate mainly in onditions of overload, which result in energy loss. Figure 1 illustrates inverter efficiency under both overload and partial-load operation (inverter sizing) [12].
The efficiency of the inverter is the most important parameter in a photovoltaic system connected to the grid.
Therefore, in this case :
PAC PINVMAX
(4)
In summary, given the input power PDC and the inverter maximum power PINVMAX, the AC output power can be computed from Eqs. (3-4). The losses
coefficients values adopted in this work are listed in Table I from an exhaustive laboratory test of a large number of PV grid-connected nverters reported in [11,12] which classifies the inverters efficiency into two categories: low and high efficiency.
Fig 4. Inverter efficiency as a function of fractional load, defined as the ratio of input power (PPV) to the inverters rated capacity (Pinv,rated).
According to this curve, we can note the following remarks:
-
The inverters provide their maximum power at half load.
-
When the illumination exceeds 1000 W/m2, the performance starts to deteriorate.
-
The maximum efficiency of the inverter reaches approximately between 0.5 and 0.6 of the load.
From these observations, it is clear that to achieve high performance; we must run the inverters in a defined load range.
According to this principle, we will develop a new configuration to ensure better efficiency of the inverter. That is to say, the entire installation.
A. Inverter model
If the inverter input power does not exceed the maximum inverter rated power, noted as Pinvmax, the
available power at the inverter output PAC is given by:
Table I: Values of losses coefficients for low and high efficiency inverters
Inverter efficiency
K0
K1
K2
Low
0.0100
0.015
0.06
high
0.0050
0.005
P P
(1)
Fig 5: Efficiencies of low and high efficiency inverters
AC 1 DC
Where 1 stands for the inverter efficiency, which can be modeled as [11,12] :
The corresponding efficiencies are plotted in Fig.
5 in of PDC/PINVMAX. As it can be seen, the maximum efficiency value is nearly 95% for the high efficiency inverter and 93% for the low efficiency one. Furthermore,
;
p
1 k0 1k1 pk2 . p2
p PAC
P
INVMAX
(2)
the figure also shows the better performance of the high efficiency inverter under partial load operation [11][12].
where k0 stands for the losses coefficient at no load, being k1- k2 : linear and quadratic current losses coefficients.
Replacing (1) into (2) and solving for PAC, leads to:
1k 1k 2 4k k PDC
-
-
THE PROPOSED CONCEPT
-
Presentation of the System
A scheme of the studied system is presented in Fig.6 the different power directions are represented. The sign convention in Fig. 6 is used as a reference throughout the
1 1 2 0 P
PAC
INVMAX
2 k2
PINVMAX
(3)
whole paper. The main components of the hybrid system
are the PV generator, the MPPT, the bidirectional converter with battery and the inverter.
For input power ranges higher than the inverter
maximum rated power, this work assumes the operating mode suggested in [12] to avoid power delivery interruptions, i.e. the inverters control limits the input power to its maximum value until the overload conditions are no longer present.
According to the sign convention, the laws of physics require the power balance in the system described by:
Pload Ppv (t) Pbat (t) (4)
In general, the performance of a PV inverter depends on the power of the grid report issued on the power received by the photovoltaic field (16)
P
1
PAC
DC
(5)
Fig 6 : Block diagram of Proposed system Configuration
For best performance, it is necessary an optimal input power; the output power is fixed by the grid.
Fig 7: Diagram of bidirectional DC converter
When the battery is being charged, switch S2 and diode D1 conduct current alternately. With S2 turned on, current flows from the DC bus, passes through the inductor and flows through IGBT S2. Energy is stored in the inductor during this state. Once S2 is turned off the current continue to flow through D1. Inductors energy will boost the voltage and charge the EV batteries. When the batteries are being discharged by the DC- DC converter the current flows from the batteries, passes through IGBT switch S1 and the inductor [14].
After S1 is turned off the current keeps flowing through diode D2 to decay. In this case, the converter acts in buck mode. By controlling the duty cycle of the switches, required voltage output can be obtained. Figure 7 shows the four operation state.
PAC , P
1 P
(6)
optimal
PDC optimal
DC optimal
2 DC
Where : PDC optimal : the power corresponds to the optimal performance
To adapt the power input to the optimal power, we must change the value of PDC, we have two possibility for varying the input power whether the current or voltage of Pdc, in this case we chose the change the voltage DC by installing the battery controlled by a bi-directional converter.
The function of the battery is not to storage the power but for ensure the exchange of power to increase or decrease the input power of inverter. There are three mode.
-
B. Bidirectional DC- DC converter operation
The bidirectional boost buck DC- DC converter is used for the battery charging topology [14]. One of the advantages of the converter is that it is a transformer less type with less size, weight and cost. The power circuit includes two sets of anti parallel connected IGBT and Diode as well as a boost inductor with two filtering capacitors. Charging or discharging the battery can be realized by controlling the two IGBT switches [14].
Fig 8 : operation of bidirectional DC-DC converter; state 1 and state 2 are charging mode, state 3 and state 4 are discharging mode
-
Modeling of Battery
A standard battery model presented in [13] is implemented in this paper. To avoid the battery algebraic loop problem, this model uses only the state of charge (SOC) of the battery as a state variable. Moreover, model in [31] can precisely characterize four types of battery chemistries including lead-acid battery.
The battery is modeled using a simple series connected controlled voltage source with a constant resistive value, as shown in Figure 9, where the controlled voltage source is described by
(7)
E E K Q Aexp B idt
0 Q idt
VBattery E Rin IBattery
(8)
where E0 is the no load battery voltage (V), K is the polarization voltage (V), Q is the battery capacity (Ah), A is the exponential zone amplitude (V), B is the exponential zone time constant inverse (Ah)1, VBattery is the battery
voltage (V), Rin is the battery internal resistance (), IBattery is the battery current (A), and idt is the charge supplied
For boost converter, the duty ratio,
Vi
D 1 (10)
V0
For buck-boost converter, the equation will be:
V0 1
and drawn by the battery (Ah).
The battery model based on [14] is developed in Matlab
D(
Vi 1 D)
) (11)
Simulink environment and connected to a DC-DC
buck-boost bidirectional converter using controlled voltage source as shown in Figure 10.
Control schemes of the DC/DC bidirectional converter
Fig 10 : Flowchart for SOC and BCB power charge/discharge controls
The voltage gain of the bidirectional converter in the buck state can be expressed as :
Fig9 : Nonlinear standard battery model
G VL
d3 (1 d3 )
(12)
C V 1
V N (1 d ) 1
H 3
-
-
ONTROLLER FOR DC-DC CONVERTER
and the voltage gain of the bidirectional converter in the boost state can be represented as,
Control of the charging/discharging of BES is achieved by
using a buck-boost converter circuit with two PI controllers, as shown in Figure 5, where PI7 processes the DC bus voltage discrepancies during disturbances to make the bus voltage follow the voltage set point set as Vdc,ref
G V H
V
V 2
L
2 N
(1 d1 )
(13)
= 500 V. The internal current control loop is also adopted for the battery current controller compensated by PI8.The output signal from PI8 is passed to the PWM generation circuit where the logic circuit is used for the decisions, including the charge, discharge, or halt modes of operation. The switch S1 is triggered and S2 is zero during the boost (discharge)mode and vice versa during the buck (charge) mode to absorb power from the DC bus.
Both S1 and S2 become zero (halt mode) when no regulation signal is transferred [16].
As mentioned before, for buck operation switch S5 and S8 needs to be turned on. And for boost operation switch S6 and S7 needs to be turned on.
For buck converter, the duty ratio,
The control circuit should guarantee that both switches do not operate at the same time.
The following constraints are used for charging/discharging as follows:
-
If VdcVdc-up then charging and Vdc- ref=Vdc-up
-
If VdcVdc-lw then discharging and Vdc- ref=Vdc-lw
-
Vdc-lwVdc Vdc-up then no control =reset
-
the flow chart of the program
D V0
Vi
(9)
Where, Vo denotes output voltage and Vi denotes input voltage.
-
-
SIMULATION RESULTS
The results found by this architecture are very interesting, so we can consider that our model is consistent and accurate enough for a first optimization approach.
The simulation model of the proposed standalone PV-wave hybrid system with battery energy is built in Matlab Simulink environment under different operating conditions.
The DC-DC converter is simulated with a constant
14000
12000
10000
8000
6000
4000
2000
0
input
voltage of 600 V, a constant output voltage of 300 V, a switching frequency of 20 kHz and the parameters given in
-2000
0 1 2 3 4 5 6 7 8 9
4
x 10
Table I.
The simulation was carried out at a relative phase-shift of d
= 0:15.
-
Simulation parameters
Maximum rated power Pmax
12000KW
Maximum voltage Vmax
33.7V
Maximum current I max
3.87A
Open circuit voltage Voc
42.1V
Schort circuit voltage Isc
3.56A
Output voltage rating
337V
Output current rating
35.6A
Number of modules in a string
series Nss
10
Number of modules in a string
parallel Npp
10
Table I : Parameter of PV array
Fig11: Changing Illumination Conditions of PV System
400
350
300
250
200
150
100
50
0
-50
0 0.5 1 1.5 2 2.5
5
x 10
Table II : Parameter of PV system
Vin (nom)
337 V
Vout (nom)
540 V
Cin
78.6 µF
Lboost
444 µH
Cout
154.69 µF
Switching frequency
10 kHz
Table III : Parameter of PV inverter
Carrier frequency
5000hz
Modulation index
0.85
Frequency of output voltage
50hz
Lload
5 mH
Rload
10
700
600
500
400
300
200
100
0
Fig 12: The curve of PV voltage
Rated power Pdc
2KW
Inductor L
373 µH
Cbat
282.2 µF
Cbus
1130 µF
Table V: Parameter of bidirectional DC and battery
-100
0 0.5 1 1.5 2 2.5
5
x 10
Fig 13: Variable DC-Link Voltage of PV inverter
12000
10000
8000
6000
4000
2000
0
12000
10000
8000
6000
4000
2000
0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
0
0 0.5 1 1.5 2 2.5
5
x 10
Fig 14: Variation of input power of PV inverter
0 0.5 1 1.5 2 2.5 3 3.5
5
x 10
Fig 15: Variation of output power of PV inverter
0 0.5 1 1.5 2 2.5 3 3.5
5
x 10
in the range 500 to 600 V to about 1.2 microseconds, this mean that when the BCB begin to adjust the bus voltage with the reference.
In the efficiency curve (fig 16), we can see that the output of inverter stabilized between 0.8 and 0.9 when the illumination 500w/m2, in another point in this monument the BCB ensures the exchange of the power.
In order to reduce the cost of the BCB system, we used this system with many strings. This solution is cost-effective because the power exchange is very little and the BCB does not work continuously.
CONCLUSION
Our goal through this architecture is to create a new hybrid concept basing on the combination of PV system with bidirectional DC.
This System has just confirmed that the best way for optimization of a system is of going directly on the factors, which influenced it. The BCB system based on the optimal distribution of powers in order to reach better efficiency. According to the results of simulation, we can confirm the feasibility of this architecture and the possibility of carrying out this topology in a system PV connected to the grid, but we must optimize it to reach good mode of operation.
In this study, we tried to use a bidirectional DC converter with battery not for store energy but for adjusting the power input of a PV inverter. This last is important for equipment that ensures more functionality in PV systems overcoats with the evolution of PV and increased this new energy into the grid.
REFERENCES
-
Contribution à lamélioration des chaînes de conversion photovoltaïques par lintroduction darchitectures distribuées.
-
M. PETIBON Stéphane, Nouvelles architectures distribuées de gestion et de conversion de lénergie pour les applications photovoltaïques, 20 Janvier 2009.
-
Stéphane VIGHETTI, Systèmes photovoltaïques raccordés au réseau
: Choix et dimensionnement des étages de conversion, thèse de doctorat université de Grenoble, 24 septembre 2010.
-
Mohamed A. Eltawil, Zhengming Zhao, Grid-connected photovoltaic power systems: Technical and potential problemsA review, Renewable and Sustainable Energy Reviews 14 (2010) 112 129
-
M. Imran Hamid, Makbul Anwari, Z. Salam, Load Sharing Characteristic of Single Phase PV Inverter Connected to Grid, 2nd IEEE International Conference on Power and Energy (PECon 08),
Fig 16: The efficiency of PV inverter under changing illumination
condition
-
-
Analysis and diagnostic results
In all of the simulation, we used a variable curve for solar llumination to verify our system in different load.
According to the got results, we note that in fig 12, the PV voltage stabilizes at about 1 µs in the value of 350V. That is to say, at half load. In fig 13; The DC voltage stabilizes
December 1 3, Johor Bahru, Malaysia.
-
Les Onduleurs pour Systèmes Photovoltaïques Fonctionnement, Etat de lArt et Etude des Performances, Août 2007.
-
Weidong Xiao, Nathan Ozog, and William G. Dunford, Topology Study of Photovoltaic Interface for Maximum Power Point Tracking, ieee transactions on industrial electronics, vol. 54, no. 3, june 2007.
-
M. C. Cavalcanti, G. M. S. Azevedo, B. A. Amaral, K. C. de Oliveira, F. A. S. Neves, Z. D. Lins, Efficiency Evaluation in Grid Connected Photovoltaic Energy Conversion Systems , Power Electronics Specialists Conference, 2005. PESC '05. IEEE 36th
-
Mike meinhardt , Gunther cramer, Bruno burger, Peter Zacharias, multi-string-converter with reduced specific costs and Enhanced functionality
-
Mahmoud Alahmad, Mohamed Amer Chaaban, Siu Kit Lau, Jonathan Shi, Jill Neal , An adaptive utility interactive photovoltaic system based on a flexible switch matrix to optimize performance in real-time, a thesis of Master of Science, University of Nebraska
Lincoln
-
Song Chen; Peng Li; David Brady; Brad Lehman; The Impact of Irradiance Time Behaviors on Inverter Sizing and Design
-
G. Velasco, R. Piqué, F. Guinjoan, F. Casellas and J. de la Hoz, Power sizing factor design of central inverter PV grid-connected systems: a simulation approach, 14th International Power Electronics and Motion Control Conference, EPE-PEMC 2010.
-
G. Velasco, F. Guinjoan, R. Piqué, M. Román, A. Conesa, Simulation-based criteria for the power sizing of grid-connected PV systems, International Review on Modelling and Simulations (I.RE.MO.S.), Vol. 4, N. 5 October 2011.
-
Nahidul Hoque Samrat,Norhafizan Bin Ahmad,Imtiaz Ahmed Choudhury, and Zahari Bin Taha; Modeling, Control, and Simulation of Battery Storage Photovoltaic-Wave Energy Hybrid Renewable Power Generation Systems for Island Electrification in Malaysia, the Scientific World Journal, Volume 2014, Article ID 436376, 21 pages.
-
Z. Salameh, Reversible Battery Charger for Vehicle to Grid Applications, International Journal of Engineering Research & Technology (IJERT) Vol. 3 Issue 2, February – 2014
-
Alessandro Marmo, Experimental Validation of TEAM Concept in PV Grid Connected Systems Universitat Politècnica de Catalunya, May 2010.
-
Muhamad Zalani Daud, Azah Mohamed, and M. A. Hannan, An optimal control strategy for dc bus voltage regulation in photovoltaic system with battery energy storage the Scientific World Journal Volume 2014, Article ID 271087
-
Rajkiran Singh, Seyedfoad Taghizadeh, NadiaMei Lin Tan, and Jagadeesh Pasupuleti, Battery Energy Storage System for PV Output Power Leveling, Advances in Power Electronics Volume 2014, Article ID 796708,