Abstract In today's competitive global market, effective utilization of industrial resources play a vital role. Here lies the importance of efficient layout or re-layout of the industry. The physical arrangement of all the departments, storage areas, utilities areas must be critically planned to avoid the wastages and the bottlenecks.

This paper presents a case study undertaken to develop the efficient plant layout by using Systematic Layout Planning (SLP) technique, The basic analysis of existing layout was done by establishing relationship of different activities in the process flow. The material flow analysis was done by considering load matrix and cost matrix. After analysis of existing plant layout, three alternative layouts are developed by using SLP technique. The efficient plant layout developed has resulted in 55.25% savings in material handling distance and about 16.66% increase in productivity.

Keywords Plant layout, SLP, load matrix, relationship

  1. INTRODUCTION

    In competitive environment, productivity of the industrial unit has got ultimate importance. Efficient plant layout is one of the effective tool to enhance the productivity. Most plant layouts are designed for initial conditions of the business. However these layouts provide many bottlenecks during growth period. Hence as long as capacity grows, it has to adapt the internal and external changes for which efficient re- layout is necessary.

    Many researchers have provided a number of techniques to optimise the layouts. The quantitative and the qualitative measure of the techniques may differ, however the objectives are same. Hence the selection of a best alternative technique is a matter of justification.

  2. METHODOLOGY

    To design or redesign the facility layout of a manufacturing process, it is possible to apply many techniques. Each one is based on a specific idea and goal to be achieved. The comparison can be made based on the production process parameters such as material flow, material handling cost, time, throughput etc.

    In the case study of a small scale textile industry, the Systematic Layout planning technique is used to develop three alternative layouts. SLP is one of the most frequently used methods in the layout design of the facilities. It includes three specific phases :

    1. Data collection and analysis

    2. Searching among the possible layout solution.

    3. Evaluating alternatives and selecting the best layoutt.

  3. CASE STUDY

    This paper refers to a small scale Textile Industry manufacturing Turkish towels and napkins.

    The manufacturing process involves the flow of material as shown in the figure (1)

    Figure 1: Manufacturing Process

  4. MOTION AND TRANSPORTATION

    The term motion is used for movement of people and transportation for the movement of the material. Quantitative data was obtained to calculate the total distance travelled in terms of motion and transportation during the manufacturing process of existing plant layout. (Table 1). The table represents the distance between different locations for each major process in the manufacturing. The data serves as the baseline and is useful in determining the degree of closeness necessary between different departments for material flow. Efforts are made in the layout design to place the departments, having more material flow, close to each other to minimize the material handling cost. It was seen that in the existing plant layout (Fig. 2) the work flow was not optimum due to poor adjacency of the departments.

    The various departments shown in the layout are

    1. Administrative office

    2. H .R .Office

    3. Raw material storage

    4. Doubling section

    5. Dyeing section

    6. Warping section

    7. Power loom section

    8. Finishing section

    9. Inspection section

    10. Packing section

    11. Security

    12. W/C

      Development of alternatives by using SLP

      By applying SLP technique and considering the constraints three possible alternative plant layouts A, B and C were developed as shown in Figure 2. The motion and

      transportation in modified plant layouts A,B and C are analysed and presented in the table 2.

      Figure 2: Alternative Plant Layout

      Table 1: Motion and transportation in existing plant layout

      Sr. no

      FROM (i)

      TO (j)

      Distance In meters

      Number of Loads

      Time in Second

      Total distance

      Total Time

      01

      Doubling

      Dying

      28.97

      10

      45

      289.7

      450

      02

      Dying

      Warping

      42.09

      25

      80

      1052.25

      2000

      03

      Warping

      Power Loom

      30.5

      03

      330

      91.5

      990

      04

      Power Loom

      Finishing

      18.3

      32

      30

      585.6

      960

      05

      Finishing

      Inspection

      3.66

      30

      06

      109.8

      180

      TOTAL

      2128.85

      4612

      Table 2: Motion and transportation in new plant layouts A,B and C

      Sr. no

      FROM (i)

      TO (j)

      DISTANCE

      In meters

      Number of Loads

      Total Distance

      A

      B

      C

      A

      B

      C

      01

      Doubling

      Dying

      12

      12

      12

      10

      120

      120

      120

      02

      Dying

      Warping

      10

      12

      10

      25

      250

      300

      250

      03

      Warping

      Power Loom

      18

      19

      22

      03

      54

      57

      66

      04

      Power Loom

      Finishing

      23

      13

      16

      32

      736

      416

      512

      05

      Finishing

      Inspection

      07

      02

      02

      30

      210

      60

      60

      TOTAL

      1370 953 1008

  5. RESULTS

    Comparing the results of new developed layous A,B and C with existing layout, it is observed that :

    Layout A results in 785.85 meters savings in total distance. ( 39.91% )

    Layout B results in 1175.85 meters savings in total distance ( 55.23% )

    Layout C results in 1120.85 meters savings in total distance ( 52.65% )

  6. CONCLUSION

In new layouts A,B and C all the departments are systematically arranged so that efficient material flow is obtained.

  • Maximum material flow distance is saved in plant layout B ( 55.23%)

  • Plant layout C is provided with effective utilization of available floor space in weaving section and thereby increasing the production by 33.33%

  • Plant layout C is also provided with the flexibility to adapt Auto looms in weaving section which will result in great

    savings in labour requirement so that 31 labours are not required.

  • Automation of material handling is suggested by using trolleys and beam lifting devices.

REFERENCES

    1. A. Arun Senthil Kumar and et.al, " Implementation of cellular manufacturing systems in garment industry" International Journal of Innovative Research in Science, Engineering and Technology,

      Vol.3, Special Issue 3, March 2014

    2. Anucha Watanapa et.al," Analysis plant layout design for effective production", Proceedings of intentional MultiConference of Engineers and Computers Scientists 2011 Vol. II, IMECS, March 16-18, Hong Kong.

    3. Filippo De Carlo et.al," Layout Design for a low capacity Manufacturing Line -A Case study" International journal of engineering business management special issue on Innovations in Fashion Industry Vol.5 , 2013

    4. Ram D. Vaidya , Prashant N. Shende," Design and improvement of plant layout", International journal on theoretical and applied research in mechanical engineering, Vol. I, Issue-2, 2012

    5. Rekha Bhowmik," An approach to the Facility Layout Design Optimization" IJCSNS Vol.8 No.4, April 2008

Leave a Reply