Evaluation of Porosity of Cement Paste Ring in Rebar Shaked-Reinforced Concrete
Eng. Lwitiko Humphrey Kalenga
Department of Structural and Construction Engineering, College of Engineering and Technology,
University of Dar es salaam Dar es salaam, Tanzania
Abstract – One of the major causes of corrosion in reinforced concrete is a porous zone at the Interfacial Transition Zone (ITZ) of reinforcement and Concrete due to poor compaction, high porosity and high bleeding. The compaction using Rebar shaker has proved to improve compaction and to reduce porosity at ITZ as it increases bond and adhesion of rebar and concrete. In this article, it has been concluded that the CPR reduces porosity at the ITZ and the zone surrounding the CPR has lower porosity. The assessment of porosity behavior which is important in evaluation of suitability of Cement Paste Ring (CPR) in combating corrosion is being discussed. During the assessment the porosity was determined for the CPR of the Core Drilled Hollow Cylindrical, and the results were checked by determination of porosity of the zone covering the outer side of CPR and, by the Measuring of fluctuation in Porosity (from Outside towards Inside). Assessment was done for various concrete strengths, CPR thickness and by varying w/c ratio.
Keywords: Rebar shaker; Cement Paste Ring; Porosity; corrosion; Interfacial Transition Zone
-
INTRODUCTION
The bond between concrete and steel reinforcement at the Interfacial Transition Zone (ITZ) is normally very porous, hence it promotes corrosion due to ingress of harmful chemicals. This weak and porous zone could be due to insufficient compaction, accumulation of bleeding water (higher effective w/c ratio) hence a more open – porous structure (Weiss et al., 2009; Munns et al, 2010). Therefore, compaction, porosity and bleeding at ITZ are vital for controlling corrosion. For most of the deteriorating processes, the permeability of the concrete is a key factor governing the rate of deterioration. (Gjørv, 2009). Permeability controls the rate of ingression of harmful chemicals diffusion. Low permeability may be attained by using a low water-to cementitious materials ratio and proper compaction (Nader 2008). Proper compaction can be achieved by rebar shaking technique. Rebar Shaking is a process of turning rebars into a vibrator (Bennet et al., 2003). This practice leaves steel bars enveloped by cement paste in other words; it creates a paste ring around rebar as shown in Figure 1. The cement paste ring (CPR) is synonyms of Concrete Paste Ring, in reality this zone is comprised of cement, fine sand, fine particles of aggregates and water; it is not just only cement and sand as the word depicts.
Figure 1: Sample Preparation and schematic diagram of cement paste ring.
Permeability is considered to be the key to the durability of concretes in various aggressive environment. It has been widely accepted that control of the permeability of concrete is more important than control of the chemistry of cement (Khatri, 1997). Consideration of low permeability to ensure durability is included in British Standard BS 5328, which states that permeability is governed by the constituents, their proportions and the procedures used in making concrete. A relatively low w/c in cement paste does not necessarily mean a reduced permeability because of the significant influence of aggregates (Neville, 2004). Permeability of concrete is influenced by two primary factors porosity and interconnectivity of pores in the cement paste and micro-cracks in the concrete, especially at the paste aggregate interface. On the other hand, porosity and interconnectivity are controlled mainly by the w/c ratio, degree of hydration, and the degree of compaction (Banthia, 2005 and Mehta and Monteiro, 2005). Studies and experience gained by using ordinary concrete have shown that concrete durability is mainly governed by concrete porosity and the harshness of the environment (Dvorkin, 2006)
With respect to durability, which is the ability of concrete to resist various forms of deterioration is often related to its impermeability. Analysis of the sources of porosity and its connectivity can frequently provide the means to understand the mechanisms by which aggressive species can intrude concrete. This is because the pore structure defines the paths along which liquid or vapor preferentially moves. (Mehta and Monteiro, 2005)
Therefore, it has been suggested that the pore size distribution, not the total capillary porosity, is a better criterion for evaluating the characteristics of a hydrated cement paste. In all cases, it is the effective porosity, which is related to the degree of continuity of the pore system that significantly affect the transport properties of concrete (Mobasher, 2009). However, pore volume resulting at different water/cement ratios and degrees of hydration, does not uniquely define the pore system and thus is not uniquely related to the permeability. (Ramachandran, 1973). It is at this background that study of porosity becomes significant.
-
Review on Porosity
The prolonged-curing or moist state is a preferred situation for controlling of cracking due to shrinkage, as it hinders the movement of interlayer water in and out of the laminated structure of the gel particles (Soroka, 2004). This also suggests that there is no possibility of bleeding (Domone, 2003) at the interface of CPR and reinforcement. The active constituent of concrete is cement paste and the performance of concrete is largely determined by the cement paste
Capillary porosity is determined by drying a concrete sample and refilling the empty capillary pores with a dense organic liquid. Concrete is a porous material containing a system of pores covering a wide range of pore sizes. Pores can be found within the aggregate particles, and also between the particles if the intergranular voids are not completely filled with cement paste (Newman 2003).
The pastes porosity has different kinds of pores that which are;
-
Gel pores, in a size not much larger than a few times
mechanical properties of hardened cement pastes. Curing conditions as well as composition of the pastes in particular mineral admixtures influence total porosity and pore size distribution (Dhir and McCarthy 2006). The fine particles of sand at the CPR zone may reduce porosity at greater percentage.
-
-
-
EXPERIMENT AND ANALYSIS OF RESULTS The Samples of concrete strength 20MPa with w/c ratio of
0.4 were prepared. The granitic aggregate and fine aggregate used had absorption less than 0.4 percent. Thickness of Cement Paste Ring is corresponding to vibration duration and is ranging from 5mm to 10mm.
-
Test 1: Porosity Determination for Core Drilled Hollow Cylindrical of CPR
Core drilling machine was used to extract some samples (7cm Height, 2.5cm outside diameter) from the concrete core containing the cement paste ring (CPR) as shown in Figure 2, where by steel rebar was replaced with hard PVC pipe in order to allow smooth porosity examination of the CPR.
Figure 2: Hollow cylindrical concrete samples
The idea behind was to minimize the effect of the bulk concrete on the porosity by reducing the quantity (thickness) of concrete cover attached to the surface in question i.e. the CPR. The thickness of concrete cover around the CPR was reduced up to an average of 5-7 mm (0.5cm).
-
Methodology
The methodology adopted to find the porosity require the determination of total volume of the sample (bulk volume of the sample Vb) and effective pre volume (Vp). So the procedures are based on the finding of these two values as follows:
the size of a water molecule. These pores are responsible for most of the volume changes of concrete associated with gain or loss of water
Vp
Vb
(1)
(drying shrinkage, swelling and part of the creep).
-
Capillary pores, resulting from the space originally occupied by the water of the mix that has not been filled with hydration products. There are small capillary pores and larger capillary pores.
The main tools to modify the pore structure of concrete are; water/cement ratio that modifies volume and size of capillary pores, cement content which modifies volume of gel and capillary pores, and the use of special well graded aggregates. Studies shows that porosity and pore size distribution mainly affect some physical and
where: is porosity, Vp is volume of pores, and Vb is bulk volume of the sample.
So it is required to measure the two volumes in order to have the porosity which is the fraction of the bulk volume of the material occupied by voids.
The methods used are:
-
Fluid saturation method; for determination of pore volume, where by samples are dried in an oven up to 120C for 24 hrs. In order to evacuate air and
moisture then saturated in water for 24hrs or more in order to achieve total saturation of the samples, this in turn provide the volume of pores through equation (2)
TABLE I (b): RESULTS FOR DETERMINATION OF VOLUMES OF PORES BY FLUID SATURATION
V Wsat Wdry p D
Sample notation
Dry weight (after 24hrs)
Soaked
Weight 24hrs
Weight difference/W
eight of pores
Volumes of pores (cc)
S1
36.28
38.25
1.97
2.85
S2
33.91
35.65
1.74
2.42
S3
35.76
37.82
2.06
2.60
S4
42.95
45.19
2.24
3.41
S5
77.79
81.05
3.26
5.57
(2)
where: W
sat
w
is weight of soaked sample, W
dry
is weight of
dry sample, and Dw is fluid density and for water Dw = 1.01g/cc.
-
Volumetric displacement method; for determining Bulk volume of the samples, and this is measured by observing the change in volume level when the sample is totally submerged in fluid (water), this shown in equation 3.
Sample notation
Volume of
pores Vp (cc)
Bulk volume Vb
(cc)
Porosity
Porosity %
S1
1.97
19
0.10
10
S2
1.74
18
0.10
10
S3
2.06
18
0.11
11
S4
2.24
22
0.10
10
S5
3.26
45
0.07
7
Average porosity
0.10
10
TABLE I (c): ESTIMATE OF POROSITY
Vb
f0 fi
(3)
where: Vb is bulk volume, f0 is final water level, and fi initial water level
The following procedure was adopted.
-
Five cylindrical samples were core drilled, resulting into five samples (denoted as S, see figure 2), weighed and original weight were obtained, as shown in Table I (a).
-
Samples were cleaned, then put into an oven at 120c for 24hours (dehydration process) in order to evacuate all air and moisture trapped in the pores of the samples. Then weighed after and dry weight of samples were recorded, as shown in Table 1(a).
-
After 24hours in an oven, samples were left to cool at room temperature then submerged into curing tank for another 24hours so as to undergo saturation process (fluid saturation method), then weighed after to obtain weight for soaked samples. The results are shown in Table I (b).
-
After some time, the samples were further covered with paraffin, submerged into the graduated (measuring) cylinder for determination of the bulk volume of each sample (volumetric displacement method). Results are shown in Table I (a).
-
With the aid of equation (1), porosity was calculated, as shown in Table 1(c).
-
-
Analysis of Results
TABLE I (a): RESULTS FOR DETERMINATION OF BULK VOLUME BY VOLUMETRIC DISPLACEMENT
From Table I(c) above the average porosity is 10%. The lower value being 7% and highest value being 11%. The standard deviation for porosity value for this experiment is 1.37, the mean value is 10
-
-
Test 2: Determination of Porosity by covering the concrete cover attached to CPR
Modification of the idea was made by minimizing the effect of the rest of the concrete on the porosity by covering it with a water resistant sealant (silicon sealant). The outer part of the concrete samples was covered to the thickness of approx. 1mm to 2mm hence exposing only the surface of interest (CPR) as shown in Figures 3(a) and 3(b). This then allowed to find the porosity of the CPR only, since the amount of fluid (water) absorbed is due to the pores (effective pores) present on the surface in question, through this hypothesis the approximate porosity of the CPR was obtained.
Sample notation
Original weight
Dry weight
after 24hrs
Initial
vol. level
Final
vol. level
Level
difference/Bulk Vol. Vb (cc)
S1
38.41
36.28
100
119
19
S2
35.82
33.91
100
118
18
S3
37.68
35.76
100
118
18
S4
45.28
42.95
100
122
22
S5
82.20
77.79
800
845
45
Figure 3(a): Water resistant sealant (1mm to 2mm thickness)
Figure 3(b): Samples under curing and reweighing process
-
Methodology
Methodology adopted was as stated in 2.0 above. The porosity value of this method is as shown Table III (c).
In determining the porosity, the following procedure was adopted
-
Three whole cylindrical samples were core drilled resulting into five small samples as shown in Figure 2.
-
The resulted five clean and dry sample covered with paraffin were immersed into the graduated (measuring) cylinder for determination of the bulk volume of each sample by the Volumetric Displacement Method. Results are shown in Table II (a)
-
Further, the samples were dried in then put into an oven at 120 °C for 24hrs (dehydration process) in order to evacuate all air and moisture present in the pores of the samples. Then weighed after, view results in Table II (b)
-
Then samples were covered with water resistant sealant as shown in Figure 3(a), to prevent the absorption of fluid(water) by unnecessary surface (i.e. the concrete cover) leaving only the CPR exposed to the fluid(water) to be soaked in the process to give us the approximate values of porosity (effective porosity). The saples were left to undergo curing on free air for 72 hrs.
-
The samples ware then weighed in order to determine the increase in weight due to the water resistant cover before being soaked into the curing tank filled with water for 24hours (Fluid Saturation Method) as shown in figure 3(b). After 24hours they were reweighed as seen in Figure 3(b), and the results tabulated in Table II (b).
-
-
Results analysis
TABLE II (a): DETERMINATION OF BULK VOLUME BY VOLUMETRIC DISPLACEMENT
Sample notation
Original weight (g)
Dry weight after 24hrs(g)
Initial vol. level
Final vol. level
Level difference/ Bulk Vol. Vb (cc)
S1
37.36
35.23
100
118
18
S2
37.13
35.22
100
117
17
S3
36.87
34.95
100
116
16
S4
37.88
35.55
100
119
19
S5
40.16
35.75
200
219
19
TABLE II (b): DETERMINATION OF VOLUMES OF PORES BY FLUID SATURATION
Sample notation
Dry weight
with cover(g)
Soaked Weight
with cover 24hrs(g)
Weight difference/
Weight of pores
Volumes of pores (cc)
Sample notation
S1
38.71
40.06
1.35
1.34
S1
S2
38.25
39.28
1.03
1.02
S2
S3
38.22
39.39
1.17
1.16
S3
S4
39.35
41.02
1.67
1.65
S4
S5
41.74
43.06
1.94
1.92
S5
TABLE II (c): ESTIMATE OF POROSITY
Sample notation
Volume of pores Vp (cc)
Bulk Volume Vb (cc)
Porosity
%
Porosity
S1
1.34
18
0.07
7.4
S2
1.02
17
0.06
6.0
S3
1.16
16
0.07
7.2
S4
1.65
19
0.09
8.7
S5
1.92
19
0.1
10.1
Average Porosity
0.08
7.9
The standard deviation for porosity % for this experiment is 1.4, the mean is 7.9%
-
-
Test 3: Measurement of Fluctuation in Porosity (from Outside to Inside)
The determination of porosity from outer layer to inner layer could be beneficial to understand the porosity behavior of concrete sample with CPR ring. It also helps to understand layers of concrete near the CPR.
-
Methodology
Small almost rectangular parts were cut out from two cylindrical concrete samples (rebar-shaked sample and cured for 28 days) which included the surface of interest (cement paste ring) as shown in Figure 4.
Each sample was carefully cut/divided into three part namely
S, M and N as shown in Figure 4.
Where by: S denotes the outer part, M the middle part and N
is for the inner part (containing paste ring).
Figure 4: Section of Samples for porosity determination
The fluid saturation method and volumetric displacement method were used to determine, the bulk volume of the sample (Vb) and the results are shown in Table III (b). For the effective pore volume (Vp), the respective results are shown in Table III (a). The porosity values of this test are shown in Table III (c).
-
In the fluid saturation method; for determination of pore volume (Vp), the samples were dried in an oven at 120°C or 24 hrs to evacuate air and moisture, weighted, saturated in water for another 24 hrs, in order to achieve total saturation of the samples. Results obtained are as shown in Table III (a).
TABLE III (a): VOLUME OF PORES
Sample notation
Weight dry (g)
Weight saturated(g)
Weight difference(g)
Volume of pores (Vp)
S1
39.85
41.58
1.73
1.71
S2
30.02
31.89
1.87
1.85
M1
56.34
59.43
3.09
3.06
M2
34.43
37.48
3.05
3.02
N1
11.10
12.04
0.94
0.93
N2
19.73
21.52
1.79
1.77
-
In the volumetric displacement method; for determining Bulk volume, the samples were coated with paraffin to prevent the penetration of the fluid into the pore spaces of the samples. Results are as shown in Table III (b).
TABLE III (b): BULK VOLUMES OF SAMPLES
Sample notation
Initial volume level (ml)
Final volume level (ml)
Level difference
/Bulk volume Vb (ml)
S1
80
99
19
S2
80
95
15
M1
150
180
30
M2
150
180
30
N1
40
58
18
N2
50
65
15
TABLE III (c): POROSITY VALUES
Sample notation
Vp (cc)
Vb (cc)
Porosity
Average porosity
S1
1.71
19
0.09
0.11
S2
1.85
15
0.12
M1
3.06
30
0.10
0.10
M2
3.02
30
0.10
N1
0.93
18
0.05
0.08
N2
1.77
15
0.12
From the results above we can see that there is no big difference of porosity (effective porosity) as we approach the steel rebar that was vibrated. So it can be expected that surface of interest (cement paste ring) have more elevated value of effective porosity compared to the rest of the concrete. This lead to series of experiments to determine the fluctuation of porosity from the cover to the inner most layer, i.e., at ITZ of rebar and CPR. The slice of a cylinder was prepared, cut into small rectangular parts of 2cm x 4cm x 5cm as shown in Figure 5. Seven samples from different cylindrical concrete samples were prepared, the effective bulk volume, pore volume and average porosity were found using the same methodology as above, and recorded in the Table III (d).
Figure 5: Cut sections from cylindrical sample.
Porosity (%)
Avera ge Porosi ty (%)
Samples
S1
S2
S3
S4
S5
S6
S7
Cut Section
C1
8
8
8.3
8.4
7.9
9
7.6
8.17
C2
7.3
7.1
7.5
7.3
7.2
7.5
7.2
7.30
C3
10.2
11.3
11.9
11.3
10.3
10.2
11.
2
10.91
C4
12
12
12.9
13.5
13.2
13.1
11.
2
12.56
C5
12
13
12
14
13
13
12
12.71
TABLE III (d): AVERAGE POROSITY OF CUT SECTIONS
-
-
-
Test 4: Variation of CPR thickness, w/c ratio and strength
The experiments performed above were repeated by varying strength of concrete, w/c ratio and thickness of CPR and the results are as presented in Table IV.
Strength (MPa) |
20 |
25 |
||||||
w/c ratio |
0.4 |
0.5 |
0.4 |
0.5 |
||||
CPR Thickness (mm) |
10 |
6 |
10 |
6 |
10 |
6 |
10 |
6 |
Sample 1 |
7 |
7 |
7 |
7 |
7 |
7 |
7 |
7 |
sample 2 |
7 |
7 |
7 |
7 |
7 |
7 |
7 |
7 |
sample 3 |
7 |
7 |
7 |
7 |
7 |
7 |
7 |
7 |
Standard Deviation |
1.5 |
0.5 |
1.5 |
0.5 |
1.5 |
0.5 |
1.5 |
0.5 |
TABLE IV: RELATION OF W/C RATIO, CPR THICKNESS, STRENGTH OF CONCRETE
-
DISCUSSION OF RESULTS
-
CPR, fine particles and compaction
The presence of fine particles and presence of saturation eliminate the formation of capillary cavities (Shetty, 2005). The fine particles and good compaction at CPR zone have reduced the porosity as depicted by the results of Test experiments 1, 2 and 3. However, it seems that the zone which is close to the start of CPR zone has lower porosity than CPR itself. This could be because of relatively finer aggregate, prolonged curing and higher amount of cement than in the interface of rebar and CPR.
Generally, there is a fundamental inverse relationship between porosity and strength of solids. The higher the porosity the lower the strength as shown in Table IV. Also the relationship between water-cement ratio and porosity is very important, though it does not depend on other factor. In this experiments thickness of CPR has influences on the porosity of CPR and the section adjacent to CPR. The effect of the water-cement ratio on the permeability and strength of concrete is generally attributed to the relationship that exists
between the water cement ratio and the porosity of hydrated cement paste in concrete and the thickness of CPR. The thicker the CPR the slightly lower the porosity, and on the other hand the higher the strength attributed by lower w/c ratio the lower the porosity.
Compared to 30 to 40 percent capillary porosity of ordinary cement paste present in hardened concrete, the volume of pores in most natural aggregates is usually below 3 percent and rarely exceeds 10 percent. It is expected, therefore, that the permeability of aggregate would be much lower than that of the typical cement paste. This could be the reason why test experiment no.3, the section adjacent to CPR ring seem to have very low porosity because of presence of finer aggregates.
-
Porosity vs w/c ratio and permeability
The porosity of the paste is much higher due to incomplete hydration and the use of higher w/c ratio. The water cement ratio at the ITZ of rebar and CPR was determined and found to be 0.4 the same as of the bulk concrete. A high water/cement ratio will increase the capillary porosity and the rate of carbonation as seen in experiment no. 4. Generally, when the water-cement ratio is high and the degree of hydration is low, the cement paste will have a high capillary porosity.
With conventional cement pastes, the discontinuity in the capillary network is generally reached when the capillary porosity is about 30 percent for the w/c ratio ranging from 0.4 to 0.7, though water-cement ratio in most concrete mixtures seldom exceeds 0.7, theoretically, with most well-cured concrete mixtures, cement paste should not be the principal contributing factor to the coefficient of permeability of concrete, (Mehta P. K., 2013). Typically, about 30 percent capillary porosity represent a point when the interconnections between the pores have already become so tortuous that a further decrease in the porosity of the paste is not accompanied by a substantial decrease in the permeability coefficient, (A. Bonakdar, 2010). The physical count of pores using special tool will assist to confirm the interconnectivity of pores that will lead to permeability. All experiments have shown porosity of CPR ring and nearby zones are less than 12%.
-
-
CONCLUSION
From the investigation carried out and discussion above, following are the conclusions
-
CPR has proved to reduce porosity at ITZ between rebar and concrete due to presence of fine particles and good compaction, adhesion of concrete paste on the rebar and prolonged curing.
-
The Zone adjacent to CPR has lower porosity than CPR itself because this zone has higher presence of cement, relatively fine aggregates, optimal w/c ratio and good compaction.
-
A properly consolidated, and cured concrete remains essentially water-tight as long as the micro cracks and pores within the interior do not form an interconnected network of pathways leading to the surface of concrete, and from the tests conducted above have revealed the porosity to be less than 18%, which maximizes the chance of pore discontinuity (Cook and Hover 1999, Justness 2009, Roy 1993) thus reducing permeability and hence increases durability chances of structure.
-
-
RECOMMENDATION
The most common method of analyzing porosity data is to determine pores networks, pore size distribution, pore radius and averaged pore size, further research and investigation using sophisticated tools such as Petrographic image analysis (PIA) is recommended.
REFERENCES
-
Banthia N. T (2005). Permeability of concrete under stress.
Cement and Concrete Research 35, 1651-1655
-
Bennet, Richard; Randy Rainwater; Edwin Burdete., (2003), Testing of the Oztec /Rhodes Reinforcing Bar Shaker -Final Report. The University of Tennessee, Department of Civil and EnvironmentalEngineering Knoxville, Tennessee.
-
Bonakdar, A. B. (2010). Multi-parameter study of external sulfate attack in blended cement materials. Construction and Building Materials 24, 61-70.
-
Cook Raymond and Hover Kenneth (1999), Mercury porosimetry of hardened cement pastes; Cement and Concrete Research 29 (1999) 933943
-
Dhir, Ravindra and McCarthy, Michael (2006). Appropriate Concrete Technology. Published in 2006 by E & FN Spon, 26 Boundary Row, and London SE1 8HN, UK. ISBN 0 419
-
Domone, P., (2003), Advanced Concrete Technology "Concrete Properties". J. Newman and B.S Choo, (Eds); Linacre House, Jordan Hill, Oxford OX2 8DP; ISBN 0 7506 5104 0: Butterworth-Heinemann-An imprint of Elsevier 349 p.
-
Dvorkin, L. a. (2006). Consolidation (Compaction) Concrete. Basics of Concrete Science, St-Petersburg (Russia), Stroi- Beton.
-
Gjørv, O. E. (2009). Durability Design of Concrete Structures in Severe Environments. Rapid development of high strength concrete. London and New York: Taylor & Frances.
-
Justness Herald (2009). Low porosity through optimized, particle packing of concrete matrix SINTEF Building and Infrastructure; COIN Project report 13
-
Khatri, R. (1997). Role of permeability in sulphate attack. Cement and concrete research, pp. 1179-l 189.
-
Mehta and Monteiro, P. (2005). Concrete "Microstructure, Properties, and Materials" 3rd Ed. New York Chicago San Francisco Lisbon London Madrid DOI: 10.1036/0071462899: The McGraw-Hill Professional Publishing, 684 p.
-
Mehta, P. K. (2013). Concrete Microstructure, Properties and Materials. Microstructure, Properties, and Material, 21, 24,114.
-
Mobasher, B. (2009). Contents lists available at Science Direct. Cement and concrete composites 31, 213-220.
-
Munns R.L., Kaog. Chang T.Z., (2010), Durability Performance of Australian Commercial Concrete Modified with Permeability Reducing Admixture. ACCI, School of Civil &Environmental Engineering, UNSW Xypex Australia.
-
Nader Ghafoori a. (2008). Cement Concrete Composites. Cement and Concrete Composites 30, 444-454.
-
Neville, A. (2004). The confused world of sulfate attack on concrete. Cement ands concrete research 34, 1275-1296.
-
Newman, J. (2003). Advance Concrete Technology. Great Britain: Butterworth Heinemann.
-
Ramachandran, V. S. (1973). Concrete Science. Capillary porosity in Hardened cement paste, 74-79.
-
Roy, D.M. P. B. (1993). Porosity / Highway Research Program. Concrete microstructure porosity and permeability, 1- 89.
-
Shetty, M., (2005), Concrete Technology, Theory and Practice ISBN 81-219-0003-4. New Delhi-11055: S. Chand & Company Ltd. 624 p.
-
Soroka, I. (2004). Concrete in Hot Environments 26 Boundary Row, ISBN 0-203-78187-2: Published by E & FN Spon, an imprint of Chapman & Hall, Taylor & Francis e- Library, 620p.
-
Weiss, C.A., Sean W. Morefield., Philip G. Malone., and Michael L. Koenigstein., (2009), Use of Vitreous-Ceramic Coatings on Reinforcing Steel for PavementsAT22BasicResearchMilitary Engineering Program of the U.S. Army Corps of Engineers.