- Open Access
- Total Downloads : 285
- Authors : Rajesh Kumar Gadekula , C P Bhagyanath , Tejolatha Motopothula , Prasanna Kumar Kothamasi
- Paper ID : IJERTV5IS080451
- Volume & Issue : Volume 05, Issue 08 (August 2016)
- DOI : http://dx.doi.org/10.17577/IJERTV5IS080451
- Published (First Online): 03-09-2016
- ISSN (Online) : 2278-0181
- Publisher Name : IJERT
- License: This work is licensed under a Creative Commons Attribution 4.0 International License
Experimental Investigation on Minimizing Cycle Time and Cost of Radial Drill Head Feed Box Housing in Vertical Machining Centre (VMC) using Optimized Canned Cycles
Rajesh Kumar Gadekula
Department of Mechanical Engineering Annamacharya Institute of Technology and Sciences Kadapa, Andhra Pradesh, India
Tejolatha Motopothula
Department of Mechanical Engineering Annamacharya Institute of Technology and Sciences Kadapa, Andhra Pradesh, India
C P Bhagyanath
School of Mechanical Engineering Lovely Professional University Phagwara, Punjab
Prasanna Kumar Kothamasi
Department of Mechanical Engineering Annamacharya Institute of Technology and Sciences Kadapa, Andhra Pradesh, India
AbstractComputer Numerical Control (CNC) machines are the devices used predominantly in manufacturing a value added good compared to non-conventional machining. These machines are capital intensive. However, their maximum utilization is due to their economic viability in terms of reduced machining time, lower work in process inventory & increased production rates. In todays manufacturing market, the demand of a product depends on quality with precise machining time and shortest possible delivery time. In order to reduce the machining time, knowledge base expertisation on preparation of optimized part program, choosing appropriate cutting tool, optimized cutting parameters and minimization of tool path is needed. Nevertheless, an optimization of part program is still necessary to reduce the tool path.
In this context, the optimization of CNC part program, reduction of cycle time and machining cost is possible with improved programming techniques using Canned cycles including R-parameters and subroutines. A Vertical Machining Centre (VMC 400M) is selected to machine Radial Drill Head Feed Box Housing includes processing operations such as face interpolation, milling, drilling and boring. The modified CNC part program with R parameters and subroutines decreases the length of part program which in turn decreases the movements of the cutting tool over work part in each cycle. From the experimental investigation, it is observed that cycle time, machining cost are reduced using canned cycles compared to XYZ parametric program. The Breakdown time per month is compared before and after implementation of R-parameters and subroutines.
Keywords Vertical Milling Machine; Reduction of machining cost and Cycle time; Radial Drill Head Feed Box Housing; Canned cycles; R-parameters; CNC Part programming
-
INTRODUCTION
The main focus of manufacturing industries is to produce extreme quality and higher productivity of the
product. In order to increase productivity of the product computer numerical control machine tools play major role during the past decades. However, there are many parameters [1] need to be considered while machining such as feed [2][4], tool geometry and cutting speed [2], [5][7], machining time [8][10], lead time [10], surface
quality [3], [11], surface roughness [12], depth of cut [6],
[13] , spindle speed [4] and diameter of tool plunger rate[4], part program execution speed and efficiency[10]. Moreover, the optimization of these parameters depends on automation of machining centre and accuracy of part program. Different algorithms are used for optimizing different process parameters in various machines. In the past Balic et al [14] discussed about artificial intelligence technique which is a computational method employed with autonomous mechanisms of Genetic Algorithms for optimizing complicated relations in job shop scheduling and CNC machine tools program. Further, Gjelaj et al [7] discussed about optimization of the tool selection based on Genetic Algorithm. Furthermore, implementation of CNC part program using group technology is studied by Manocher et al [15] for minimizing machine operations to reduce cost. The intelligent control CNC machines based on Fuzzy logic controller is studied for better and accurate transient response, manipulation of variables in speed relation during breakdown conditions. Ahmet Murat PINAR et al [2] developed an algorithm for minimizing the time in VMC by using time calculator and CNC editor. In the past Islam et al [16] discussed about introduction of different canned cycles in determining cutting speed, feed rate, dimensional accuracy and surface finish of drilled holes.However, many analyses is carried deeply in order to increase manufacturing capabilities, minimizing of machining cost, machining time and quality of end product. These analyses are yet to adopt in real manufacturing practice. In reality, PLC part programs are
used for short time demands with scan cycles. Further nonlinear algorithms are used for monitoring drill bolt holes in real time analysis. The implementation of canned cycles involved with R-parameters and subroutines for machining Radial Drill Head Feed Box Housing are not yet investigated. Motivated by this work, investigation is carried on optimizing the CNC part program using canned cycles for minimizing cycle time and cost with different operations such as face interpolation, milling, drilling & boring.
program using canned cycles with set of instructions is shown in Fig. 3. The setup and machining of radial drill head feed box housing using XYZ parameters and R- parameters with subroutines is shown in Fig. 4.
-
PROBLEM DESCRIPTION
In any manufacturing sector, the demand of the product depends on the level of automation used in producing part geometry, finished product delivery within due date, excellent quality and customer satisfaction. During production of complex part geometry using XYZ parametric program the size of part program is vast. Furthermore, the tool movement over the work part increases the machining cost and cycle time drastically. A real time Radial Drill Head Feed Box Housing was machined in VMC 400M using various operations such as interpolation, milling, drilling & boring. No variations in drilling and boring are considered because of less complications are included with part geometry. A critical comparison of operations Vs machining cost and operations Vs machining time has been investigated using XYZ part program and R- parametric part program with subroutines. Fig. 1shows Radial Drill Head Feed Box Housing modelled in the AutoCAD.
Fig. 1. Radial Drill Head Feed Box Housing modelled in AutoCAD
-
EXPERIMENTAL SETUP
CNC Machining Center is a machine tool capable of multiple machining operations on a work part in one setup under NC program control. There are Vertical, Horizontal and Universal types. Advantages of machine centre compared to conventional machines are fewer setups, reduced part handling, increased accuracy and repeatability, faster delivery of part in small lot sizes. Idea behind development of VMC is to reduce non productive time and provides the features such as Automatic tool change, Automatic work part positioner and Automatic path changer. A Vertical Machining Center (VMC 400M) shown in Fig. 2 is considered for analyzing the cycle time and cost used for processing a radial drill head feed box housing. The specifications of the VMC 400M, speed and feed rate is shown in Table I. The modified CNC part
Fig. 2. Vertical Machining Center (VMC 400)
VMC
400
CNC system
Siemens
Axis movement
3
Tool post carrying capacity
12
X-axis
1200 mm
p>Y-axis 600 mm
Z-axis
600 mm
Guide ways
t-slot bed
Speed maximum
600 rpm
Speed minimum
50 rpm
Feed rate
10 to 250 mm/min
VMC
400
CNC system
Siemens
Axis movement
3
Tool post carrying capacity
12
X-axis
1200 mm
Y-axis
600 mm
Z-axis
600 mm
Guide ways
t-slot bed
Speed maximum
600 rpm
Speed minimum
50 rpm
Feed rate
10 to 250 mm/min
Fig. 3. Program of Instructions Table I Specifications of VMC 400M
Cost of machining acomponent Total Operating Cost *MHR (1)
Total Cost Operating Cost
60
Total Cost with XYZ parameters total XYZ parametrictime*MHR Total Cost with R parameters total R parametrictime*MHR Total savings Total Cost with XYZ parameters Total Cost with R parameters
where,
MHR = Machine Hour Rate MHR is taken as 800 per hour
(2)
(3)
(4)
(5)
Fig. 4. Setup and machining of Radial Drill Head Feed Box Housing
-
SOLUTION METHODOLOGY
The main objective of this work is to investigate machining time and machining cost of Radial Drill Head Feed Box Housing by optimizing the CNC part program in VMC 400M. The optimization includes implementation of R-parameters and subroutines. Machining cost and time are analyzed using XYZ parameters and Canned cycles for different operations specified earlier. The results are evaluated after machining the Radial Drill Head Feed Box Housing in VMC 400M and machining time is calculated. The flow chart for evaluation of Machine Cost and Time is shown in Fig. 5. The machining cost using XYZ parameters and R-parameters with subroutines is calculated as follows.
Table II Programs with R-parameters for Interpolation and Milling
The programs with R-parameters and subroutines for interpolation and milling is specified in the Table II.
Fig. 5. Flow chart for evaluation of Machining Cost and Time
Face Interpolation
Outer Dia 55 Interpolation
Outer Dia157 Interpolation
Milling
N10 G15 S300 M3 F 150 D1
N130 G0 X0 Y-165
N240 G0 X0 Y-185
N400 T2 END MILL
N20 G0 X-100 Y0
N140 R05=1 R06=2
N250 R05=12 R0=2
N410 G0 G54 S800 M3 F150 D1
N30 R05 = 14 R06 =2
R07=9;………R05=1
R07=14;……..R05=12
N420 G0 X0 Y-145
R07= 0; .. R05 = 14
N150 AA3: Z=-R05
N260 AA5;Z=-R05
N430 AA7: Z=-R05
N40 AA1: Z = R05
N160 G01 X0 Y-69.5
N270 G01 X0 Y-121
N440 R05=24 R06=3
N50 G01 X-20 Y0
N170 G02 X0 Y-69.5 I0
N280 G02 X0 Y-121 I0 J121
R07=27:….R05=24
N60 G02 X-20 Y0 120 J0
J69.5
N290 G01 Y-185
N450 G01 Y-124
N70 G01 X -100
N180 G01 Y-165
N230 G0 X135
N460 X161
N80 IF R05 = R07
N190 IF R05= =R07 GO TO
N310 G01 Y185
N470 Y128
GOT0F AAZ
F AA4
N320 G0 X-135
N480 X-169
N90 R05 = R05 R06
N200 R05=R05+R06
N330 G01 Y-185
N490 Y-124
N100 GOTO B AA1
N210 GO TO B AA3
N340 G0 X0
N500 X0
N110 AAZ : GO Z100
N220 AA4: G0 Z100
N350 IF R05==R07 GO TO F AA6
N510 Y-145
N120 M0
N230 M0
N360 R05=R05+R06
N520 IF R05==R07 GO TO F AA8
N370 GO TO B AA5
N530 R05=R05+R06
N380 AA6:G0 Z100
N540 GO TO B AA7
N390 M0
N550 AA8: G0 Z50
N560 M0
-
RESULTS AND DISCUSSIONS
The motive of using canned cycles including with R- parameters and subroutines is to increase the productivity by minimizing cycle time and cost with reduction in tool path movements over the work part. The machining of the Radial Drill Head Feed box Housing includes with various operations such as interpolation (facing, circular), milling, drilling and boring. By using the XYZ parametric part program in the VMC 400M the tool path movements are enormously high.
Hence the utilization of canned cycles are better for optimizing part program. The machined work part (Radial Drill Head Feed Box Housing) in VMC 400M is shown in Fig. 6 and the different views are shown in
Fig. 6. Complete geometry of Radial Drill Head Feed Box Housing
Table III shows the comparison between Operations versus Machining time.
S.NO
Operation
Machining Time
Xyz-Parameter Cycle Time (min)
R-Parameters Cycle Time (min)
1
Facing Interpolation (Facing)
52.26
27.7
2
Outer diameter 55
interpolation (OD 55)
32.6
16.25
3
Outer diameter 157
interpolation(OD 157)
33.6
21.6
4
Milling
72.2
35.9
5
drilling
28.42
28.42
6
Boring
32.3
32.3
7
Semi-finish bore (SF bore)
34.6
34.6
S.NO
Operation
Machining Time
Xyz-Parameter Cycle Time (min)
R-Parameters Cycle Time (min)
1
Facing Interpolation (Facing)
52.26
27.7
2
Outer diameter 55
interpolation (OD 55)
32.6
16.25
3
Outer diameter 157
interpolation(OD 157)
33.6
21.6
4
Milling
72.2
35.9
5
drilling
28.42
28.42
6
Boring
32.3
32.3
7
Semi-finish bore (SF bore)
34.6
34.6
Table III Operation Vs Machining time
Fig. 7. (a) Front View (b) Top View (c) Back View (d) Side View of Radial Drill Head Feed Box Housing
-
Machining Time Analysis
In order to increase the productivity machining time is one of the important parameter need to be considered. A critical comparison is made between operations and their machning times by using XYZ parameters and R- parameters including with subroutines. The total cycle time using XYZ parametric part program is 4.8 hours and total cycle time using R-parametric part program and subroutines is 3.26 hours. The reduction in the total cycle time is 1.5 hours. Fig. 8 shows the comparison between Operations and Machining time with XYZ and R- parametric cycles. From the figure, it is observed that face interpolation having 53 minutes of variation in cycle time and 36.3 minutes of variation in cycle time for Milling using R-parametric part program compared with XYZ part program. Hence, from the investigation, it is concluded that the machining time has been reduced drastically by using the optimized canned cycles compared to the XYZ parametric part program cycles.
Xyz-Parameter Cycle Time R-Parameters Cycle Time
70
60
Machining Time (min)
Machining Time (min)
50
40
30
20
10
0
Facing OD 55 OD 157 Milling drilling Boring SF bore
Operations
Fig. 8. Comparison between Operations Vs Machining Time with XYZ and R-parametric cycle time
-
Machining Cost Analysis
The demand of the product depends on better quality at low cost. If the machining cost is high, the total cost of the product also increases. So, we need to concentrate on the machining cost of the product. A critical comparison is made between operations and their machining cost by using XYZ parameters and R-parameters including with subroutines. The total machining cost using XYZ parametric part program is 3813.06 INR and the total machining cost using the R-parametric part program is 2613.33 INR. The total reduction in the machining cost is 1199.73 INR.
Fig. 9 shows the comparison between Operations versus Machining cost with XYZ and R-parametric cycle costs. From the figure, it is observed that face interpolation having 705.79 INR of variation in machining cost and 483.34 INR of variation in machining cost for Milling using R-parametric part program compared with XYZ part program. Hence, from the investigation, it is concluded that the machining cost has been reduced drastically by using the optimized canned cycles compared to the XYZ parametric part program cycles. Table IV shows the comparison between Operations versus Machining cost.
4000
3500
Machining Cost (INR)
Machining Cost (INR)
3000
2500
2000
1500
1000
500
0
Table IV Operation Vs Machining Cost
S.NO
Operation
Machining Cost
Xyz- Parameter Cycle Cost (INR)
R-Parameters Cycle Cost (INR)
1
Facing Interpolation (Facing)
698.8
369.33
2
Outer diameter 55
interpolation (OD 55)
434.66
216.66
3
Outer diameter 157
interpolation(OD 157)
448
288
4
Milling
962
478.66
5
drilling
378.93
378.93
6
Boring
430.66
430.66
7
Semi-finish bore (SF bore)
461
461
S.NO
Operation
Machining Cost
Xyz- Parameter Cycle Cost (INR)
R-Parameters Cycle Cost (INR)
1
Facing Interpolation (Facing)
698.8
369.33
2
Outer diameter 55
interpolation (OD 55)
434.66
216.66
3
Outer diameter 157
interpolation(OD 157)
448
288
4
Milling
962
478.66
5
drilling
378.93
378.93
6
Boring
430.66
430.66
7
Semi-finish bore (SF bore)
461
461
Xyz-Parameter Cycle Cost R-Parameters Cycle Cost
Facing OD 55 OD 157 Milling drilling Boring SF bore Total Cost
Operations
-
-
CONCLUSION
CNC machines provide faster through-put even for complex geometries with reduced machining time using a deterministic machining solution for precise execution speed of program parameters. The objective is to gain knowledge and to make the parameters of the program operator friendly and reducing the cycle time in order to increase productivity. The optimization of CNC part program, reduction of cycle time and machining cost is possible with improved programming techniques using R- parameters and subroutines. From the experimental investigation, it is observed that by using canned cycles machine cycle time, machining cost is reduced to 90 minutes and 1199.73 INR respectively compared to XYZ parametric program. Moreover, the machining cost and time are same for drilling, boring and surface finish bore with and without canned cycles because of any multiple movements of the cutting tool over work part in each cycle. The Breakdown time per month before implementation of R-parameters and subroutines is7440 minutes, after implementation of R-parameters and subroutines is 6060 minutes and 29% of time was optimized in availability of the machine.
ACKNOWLEDGMENT
Authors gratefully acknowledge HMT MACHINE TOOLS LIMITED Company for valuable suggestions and facilities provided to complete this study successfully.
Fig. 9. Comparison between Operations Vs Machining Cost with XYZ and R-Parametric cycles
Fig. 10 shows the comparison between machining cost and time with R-parameters and XYZ parameters. From the figure it is evident that implementation of R- parametric part program will minimize the cycle time and cost compared with XYZ parametric part program. The cost saving percentage by using canned cycles is 68.54% and time saving percentage is 68.48%.
REFERENCES
-
R. Rajput and A. Sarathe, CNC Controllers and its Related Parameter: A Review, Int. J. Emerg. Technol. Adv. Eng., vol. 5, no. 12, pp. 7883, 2015.
-
A. G. Ahmet Murat PINAR, Time Minimization of CNC Part Programs in a Vertical Machining Center in Terms of Tool Path and Cutting Parameter Criteria, Turkish J. Eng. Env. Sci., vol. 29, pp. 7588, 2005.
-
K. A. Shamsuddin and M. H. Osman, A Comparison of Milling Cutting Path Strategies for Thin- Walled Aluminium Alloys Fabrication, Int. J. Eng. Sci., vol. 2, no. 3, pp. 18, 2013.
-
R. Prajapati, A. Rajurkar, and V. Chaudhary, Tool Path
1000
Actual cost
Optimization of Contouring Operation and Machining Strategies for Turbo Machinery Blades, Int. J. Eng. Trends Technol., vol. 4,
900
Xyz-Parameter
R-Parameter
Machining Cost (INR)
Machining Cost (INR)
800
700
600
no. May, pp. 17311737, 2013.
-
K. Nagaoka and A. Matsubara, Improving motion accuracy of tool center point using model-reference feedforward controller, Procedia CIRP 1, vol. 1, pp. 605608, 2012.
-
M. M. and C. A. S. Daneshmand, Sifting Through the Optimal Strategies of Time-Based Tools Path Machining in Software CAD- CAM, Middle-East J. Sci. Res., vol. 13, no. 7, pp. 844849, 2013.
500
400
300
200
Minimized cost
Minimized time
Minimized time
Actual time
Actual time
10 20 30 40 50 60 70 80
Machining Time (min)
-
A. Gjelaj, A. Bunjaku, M. Zeqiraj, and S. S. Hill, PROGRAMMING AND SIMULATION OF WORKPIECE IN CNC MILLING MACHINE, Trends Dev. Mach. Assoc. Technol., no. September, pp. 4952, 2010.
-
J. M. Patel, A. P. Nair, and P. Hiral, 3-Directional Flexible Drilling Machine, vol. 3, no. 01, pp. 12621264, 2015.
-
P. S. N. N. Prof.Ms.A.A.Shingavi, Dr.A.D. Dongare, Design of Multiple Spindle Drilling Machine, Int. J. Res. Advent Technol., no. 1, pp. 3741, 2015.
-
D. Dimitrov and M. Saxer, Productivity Improvement in Tooling Manufacture through High Speed 5 Axis Machining, Procedia
Fig. 10. Comparison between Machining time and Machining cost
CIRP, vol. 1, pp. 277282, 2012.
-
S. N. Grigoriev, A. A. Kutin, and V. V Pirogov, Advanced method of NC programming for 5-axis machining, Procedia CIRP 1, vol. 1, pp. 102107, 2012.
-
A. K. Saroj and S. C. Jayswal, Analysis of Different Parameters on Tool Path for Machining Sculptured Surfaces, Int. J. Eng. Res. Technol., vol. 2, no. 10, pp. 369379, 2013.
-
N. Saraswat, A. Yadav, A. Kumar, and B. P. Srivastava, Optimization of Cutting Parameters in Turning Operation of Mild Steel, Int. Rev. Appl. Eng. Res., vol. 4, no. 3, pp. 251256, 2014.
-
J. Balic, Intelligent modelling in manufacturing, J. Achiev. Mater. Manuf. Eng., vol. 24, no. 1, pp. 340349, 2007.
-
D. Manocher, An Efficient CNC Programming Approach Based on Group Technology, J. Manuf. Syst., vol. 19, no. 3, pp. 213 217, 2000.
-
M. N. Islam, N. H. Rafi, and P. Charoon, An Investigation into Effect of Canned Cycles on Drilled Hole Quality, Proc. World Congr. Eng., vol. I, pp. 16, 2009.