Implementation of Lean Principles and Concepts in Pump Manufacturing

Surabhi Hathwar P V1 Assistant professor,

Department of Mechanical Engineering PES Institute of Technology and Management

Shivamogga, India

Vinod V Rampur2 Assistant professor,

Department of Mechanical Engineering PES Institute of Technology and Management

Shivamogga, India

Abstract- Lean an emerging technology is implemented in many manufacturing industries for the identification and elimination of waste and to enhance productivity. The pump manufacturing industry has been selected to imbibe lean into their production process. The problems that existed in the industry,which were effecting companys production were due to increase in lead time, absence of inventory classification and disorganized storage area. Hence the goal of the project was to reduce the lead time and classify the inventories by implementing suitable lean techniques and concepts. In this paper the area of lean has suggested that the best and most pertinent way is to use the technique of value stream mapping (VSM) for reducing lead time, selective inventory control approach for inventory classification and 5S for redesigning the storage area. Hence theses techniques were applied in the pump manufacturing unit, so as to identify the non value added activities and hence to reduce the cycle time

Key words: Cycle time, VSM (Value stream mapping), VSD (Value stream design), Productivity

  1. INTRODUCTION

    In this lean principles and techniques applied in various manufacturing sectors across the world. A thorough literature survey was conducted and based on understanding derived, emerging trends were jot down and a research methodology was framed to accomplish the objectives of the project.

    In 1950s Toyota Motor Corporation created Toyota Production System, then it formatted a new kind of Management concept 'Lean thinking' Graban, Mark. (2009). Lean is single most powerful tool available for creating value while eliminating waste in any organization (Womack and Jones, 1996). In a commercial setting, this is normally indicated by whether or not the customer would be prepared to pay for the activity. Lean in manufacturing is extremely common. What is less common is the consideration that lean manufacturing can be applied not just to factories, but also to areas such as production engineering and planning. When lean is applied in manufacturing, it has a positive impact on the lead-time of the whole supply chain, as well as on product costs and quality

    Value stream mapping is one of the lean principles and techniques which are adopted by most of the organization to identify the value added and non value added activity in the process. The use of value stream mapping is not limited only

    in the manufacturing process; it starts right from the suppliers till the customer get the desired product. All the material and information flow is identified and the cause for not meeting the demand is identified. By doing the value stream mapping in the organization helps to identify the critical path and redesign the factory layout and material handling and even to adapt selective inventory control approach.

      1. The manufacturing process:

        A submersible pump set consists of two components, a motor and a multi-stage pump. These are coupled together to form one working unit. The motor which is the prime mover consists of two major parts, a stator and a rotor. The manufacture of stator starts with a SS 202 grade pipe of 2.5mm thickness which is cut to different lengths depending on the HP of the motor. The stator laminations are pressed into the tube using a 70 ton capacity hydraulic press. The stator is completed with electrical winding which goes into 24 slots present in the laminations.

        The rotor starts as a SS 410 grade rod of 45mm diameter. These rotor laminations have 18 slots which are filled with copper rods and brazed on either side using copper rings. The rotor is further machined to accommodate bushes, thrust bearing and coupling rings. The rotor is fitted inside the stator using flanges and housings to complete the motor. The pump is assembled with different items procured from different vendors. The SS 410 grade impellers are fitted inside individual cast iron stage bowls. A central SS 304 grade shaft facilitates the rotation of all the impellers. Motor and pump are coupled together and tested in a test tank using the computerized digital testing panel.

      2. Purchasing process:

        The purchase process is initiated as soon as an inventory item gets below its minimum quantity. This is maintained by inventory control software. The purchase order is acknowledge by the vendor who sends a return mail informing the expected date of delivery and the present price of the item. Partial amount as agreed by both parties is deposited to the vendors account in some cases. In other cases a credit period for the amount is given by the vendor.

        The vendor then sends a Performa invoice when he is ready to ship the items. As and when this is acknowledged, the items are dispatched.

      3. Distribution process:

    At present about 30% of sales is through the companys exclusive showroom in Shimoga. The remaining sales are achieved through a vast network of mechanics and electricians at both district and Taluk levels. The company plans to expand its distribution network in sync with the increase in production capacity.

  2. LITERATURE REVIEW

    The aim of a literature review in the report was to verify the relevant theories as a knowledge base and help the reader to understand the relevant concepts and theories, in term of lean principles and techniques. These cover themes of lean manufacturing that are widely used in different sectors. The sources used are based from printed books, journals and articles.

    James.P.Womack et.al(1990) has explained about differences in lean and mass production and how effectively non value added waste can be eliminated in lean production by using different strategies.

    Chandradeep Grewal (2008), has described the methodology of lean and VSM that can be applied for a small company and also stated that it is a powerful tool to identify the inefficiencies and improvement areas.

    Bhim singh et.al (2011), depicted about value stream mapping that is used as a lean tool in a particular case study. The paper focuses on simulation model that are used in construction material to enhance the lean principles and have depicted effectively about reducing the lead time.

    Jayaganthan (2014) where he has effectively described about the ways to reduce the non-value added activity in the company. Karthikeyan Iyer (2006) suggests about the use of value stream mapping to reduce the lead time and to meet the customer demand on time and different lean techniques associated with it. Keskin (2012) has emphasized on the energy utilization in a small scale and medium scale industry by the application of value stream mapping tool.

    A literature review has been carried out on lean supply chain using a structured content analysis by Paschal Ugochukwu, Jon Engstr¨om, JosteinLangstrand (2008) speaks about lean techniques carried out in different perspectives.

    From this literature survey, it is understood that implementation of lean concepts will help the organization to reduce the lead time and also improves the overall efficiency of the organization.

  3. PROBLEM DEFINITION

    From the systematic review of literature and observation in pump manufacturing industry the problems that existed and noted ere the improper layout of storage area and absence of inventory classification. Further, to enhance productivity in the company it was imperative to identify the defects in production and assembly line before completion of the product. Hence non value added activity and value added activity were crucially observed and identified and lead time was found to be increasingly high.

    2.1 Objectives

    Based on the problem identified in the industry, the primary objective of the project was

    1. To implement lean principles and techniques in a pump manufacturing industry.

    2. To reduce the lead time of the manufacturing process.

      IV.VALUE STREAM MAPPING

      The purpose of this project was to identify the wastage in the manufacturing process and reduce wastage by identifying value added and non value added activity. Hence to identify the wastage and enhance the wastage there was no better lean tool other than value stream mapping.

      Value stream mapping is an efficient lean tool and a technique to map the flow of information and material and simultaneously visualise the key improvements area to map the future state. The methodology that is carried out to implement value stream mapping in pump manufacturing industry is show

      Study of existing system

      Identify the value

      Identify the non value

      Mapping the current state

      Remove or reduce non value

      Mapping the future state

      Fig 3.1: VSM procedure

      Basically lean is about identifying the value added and non value added activity and reducing those waste that does not add value to the customer. It is a continuous process which must be followed in the organization

      1. Value stream mapping:

    Value stream mapping termed as the language of lean is an efficient lean tool that is used to map the value added activity and non value added activity in the process to depict the flow of information and inventory and to identify the lead time.

    • Lead time

      This is one of the most important concept used which helps to analyze the total time taken to deliver the product back to the customer from the day he had placed an order.

      This helps the company to track the inventory level and place an order to the supplier before they run out of a shortage. In this report it is defined mathematically as the summation of value added activity in the process and the non value added activity in the process measured in hours or minutes.

      Lead time= (value added + non value added)

    • Takt time

      Takt time is derived from a German which means pace or a rhythm. It is defined as the available time that is required to produce the product to the actual customer demand. It signifies the actual production that is necessary to carry out to produce a particular product so that the monthly demand can be met or fulfilled. Takt time and cycle time can be plotted using a bar chart.

      This helps to identify the manufacturing process that is lesser or greater than the takt time and helps to identify if they can possibly meet the customer demand on time or there is a delay in the process. Mathematically it is expressed as follows.

      Takt Time = Available time/ customer demand

    • Cycle time

    The cycle time is calculated usually using s stop watch. It is the time required to complete a certain task from start to finish. The cycle time helps to identify the value added and non vale added activity.

  4. METHODOLOGY

      1. Present Value stream map of 5/8hp pump

        Fig 4.1 Present Value stream design for 5/8hp Pump

        The current state map for stator, rotor, assembly process of motor and pump production is shown below in the figure 4.4. This highlights the material flow and information flow from suppliers to the customers. The lead time to produce entire 5/8 hp submersible pump was 61.641 hrs. The value added activity was found to be 14.951 hrs the non value added activity observed was 50.112 hrs. The current state map was drawn below which explains about the material and information flow and highlights the total process lead time in hours

        Table 4.1 Value added and non value added for current state The production lead time is calculated by adding value

        added and non value added activity. The table below shows the summary of lead time for stator rotor and 5/8hp submersible pump.

        Table 4.2 Total process lead time for current state 5/8hp pump

      2. Proposed Value stream design for 5/8hp pump

    The future state is designed for entire production of submersible pump in a path to reduce the lead time to a greater extent so that the customers are benefitted with the value and quality. In mapping the value stream, the lead time to produce entire 5/8 hp submersible pump was 61.641 hrs. The value added activity was found to be 14.951 hrs the non value added activity observed was 50.112 hrs. After implementing lean techniques and concepts the lead time reduced to 41.662 hrs and the non value added reduced to 30.669 hrs.

    Fig 4.2: Proposed Value stream design for 5/8hp Pump

    The table 4.3 shows value stream design calculation of value added and non value added time for stator, rotor and entire assembly process of motor and pump.

    Table 4.3: Value added and non value added activities of future state

    The total lead time process for each component such as rotor, stator and assembly process and 5/8hp complete product is tabulated by adding value added and non value added activity. The table 4.4 below gives a clear picture reduction in lead time for each component in hours.

    Table 4.4 Lead time of 5/8hp Motor and Pump

  5. RESULTS AND DISCUSSIONS

The goal of this project was to implement lean principles and concepts in pump manufacturing industry. The primary objective was to analyze the lead time of a manufacturing process. The secondary objective was to implement selective inventory control approach and redesign the storage area by suggesting and implementing the 5S technique.

A, Value stream mapping

The value stream has been mapped and designed for a particular product. The product that was selected here was 5/8hp submersible pump since it is the fastest moving pump as per the record. The table 6.1 below gives a clear picture of lead time for current state and the future state.

Table 4.5: Implementation of value stream mapping and value stream design of 5/8hp pump

CONCLUSION

Lean is an effective and efficient way to enhance competitiveness of manufacturing sectors. This project addresses the different lean concepts applied in pump manufacturing industry with an aim to reduce the lead time of the manufacturing process.

Value stream mapping has been carried out at the production line to estimate the value added and non value added activity and to calculate the lead time. For 5/8 hp submersible pump the lead time was found to be 61.641hrs and after implementation of lean technique it got reduced to 44.773 hrs, a difference of 16.868 hrs was reduced which helped the industry to improve their productivity.

The classification on inventory was carried out by applying selective inventory control approach such as ABC, VED and FSN analysis. This has helped to analyze the criticality and cost effective components and a strict vigilance must be done to check the inventory level frequently. This project also emphasize on the storage area layout to implement the 5S technique since all the raw materials were disorganized. The auditing has been carried out to check the 5S implementation level which has facilitated the industry to adopt for new technology and to be in a competitive market.

REFERENCES

  1. A. Jayaganthan.,Lead time reduction through value stream mapping, International Journal of IT, Engineering and Applied Sciences Research (IJIEASR) ISSN: 2319-4413 Volume 3, No. 5, May 2014, pp 531-539.

  2. Bhim Singh, Suresh K Garg, K Sharma. Value stream mapping: literature review and implications for Indian industry, International Journal of Advanced Manufacturing Technology, volume 53, no 5-8, 2011, pp 799-809.

  3. Chandradeep Grewal.,Implementation of a lean model for carrying out value stream mapping in a manufacturing industry, Journal of Industrial and Systems Engineering Volume 2, No. 3, 2008 pp 180-196.

  4. Chandraiah Mopuru Y.Dilip kumar, V.Sreenivasulu P.Divakara Rao, Dr.C.Udaya Kiran Implementation of lean manufacturing system on oil pump implementation of lean manufacturing system on oil pump International Journal of Innovative Research in Science, Engineering and Technology , Volume 2 Issue 1, February 2013, ISSN: 2319 1058, pp 444-451

  5. DoolenT, Nagarajan R.D, Hacker M.E,Lean manufacturing:An electronics manufacturing perspective, IERC ,volume no 2, 2002, pp 19-22

  6. Dr. C. Velmurugan1 sakthi Murugan Modification of layout in pump industry using value stream mapping , Journal of Industrial Engineering and system, issn (p):2279-0918, (o):2279-0926 volume 2, No 4, 2013.

  7. Eswaramoorthi, G.R. Kathiresan, P.S.S.Prasad, P.V.Mohanram A survey on lean practices in Indian machine tool industries International journal of advanced manufacturing technology, volume 52: 1091-1101, 2011 pp 103-109

  8. HudliMohd. Rameez, K.H.Inamdar., Areas of Lean Manufacturing for Productivity Improvement in a Manufacturing Unit, Journal of World Academy of Science, Engineering and Technology , Volume 4 2010- 09-20, 2008, pp 504-507.

  9. Karthikeyan Iyer., Holistic Value Framework,-creating right value streams using TRIZ and other concepts , Crafitti Consulting TRIZ journal, Aug 28 2006, pp 34-39.

  10. Mohd Nizam Ab Rahman, Nor Kamaliana Khamis, Rosmaizura Mohd Zain, Baba Md Deros and Wan Hasrulnizzam Wan Mahmood Malaysia., Implementation of 5S Practices in the Manufacturing Companies: A Case Study, Journal of mechanical and industrial engineering, volume 4, 2010 pp 46-48.

  11. Mulla M. L.1,Bhatwadekar S.G2, Pandit S.V., Learning to see value Stream mapping to add value and eliminate muda,International Journal of Innovative Technology and Exploring Engineering (IJITEE) ISSN: 2278-3075, Volume-1, Issue-2, July 2012, pp 56-61.

  12. Nitin Upadhye S.G Desmukh, Suresh Garg., Lean manufacturing system for medium size manufacturing enterprises: an Indian case. International Journal of Management science 2010, volume5(5), pp 362-375.

  13. Nurzatul Ain Seri Lanang Jaya1, Nurul Fadly Habidin, Anis Fadzlin Mohd Zubir, Juriah Conding, Suzaituladwini Hashim., Lean-agile- flexibility supply chain strategy and supply chain performance in malaysian automotive industry, International journal of global and medical research, volume 4, pp81-88.

  14. Paschal Ugochukwu, Jon Engstr¨om, JosteinLangstrand., Lean in the supply chain: a literature review, Journal of Management and Production Engineering Review, Volume 3 Number 4, December 2008, pp. 8796 .

  15. 15. Preetinder Singh Gill., Application of value stream mapping to eliminate waste in an emergency room Global Journal of Medical Research, Volume 12 Issue 6 Version 1.0 2012, pp 51-56.

  16. Rachna Shah and Peter T Ward., Lean manufacturing: context, practice bundles, and performance, Journal of Operations Management, Volume 21, 2003, pp. 129- 149.

  17. Prof.Rahul.R.Joshi,Mr.Rahul.Patil,Prof.G.R.Naik,Prof.M.V.Kharade., Through-put time reduction by lean manufacturing IOSR Journal of Mechanical and Civil Engineering, 2010, volume 21 ,pp 40-45.

  18. Ramamoorthy. C, Dr. V. Selladurai, Dr. S. Venkatachalam, Dr. R. Amuthakkannan Muthusamy, Efficiency enhancement of centrifugal mono block pump through lean manufacturing system using kaizen techniques, International Journal of Engineering Research and Development ,Volume 2, Issue 11, August, 2012, pp 60-65.

Leave a Reply