Integrated Reliability Evaluation of Distributed Power System

DOI : 10.17577/IJERTV2IS121272

Download Full-Text PDF Cite this Publication

Text Only Version

Integrated Reliability Evaluation of Distributed Power System

Apeksha Narendra Rajput, Bhagat Singh Tomar

Sr. Lecturer, Indraprastha Engineering College Assistant Professor , Electrical Engg. Department,

Electrical Engg.Deptt.Ghaziabad, (U.P),India, Laxmi Devi Institute of Engg.& Technology Alwar,(Rajasthan),India

Abstract This various distribution system designs, including Distributed Energy Resources (DER), affect distribution reliability indices, System Average Interruption Duration Index (SAIDI) and System Average Interruption Frequency Index (SAIFI) Furthermore, This presents an example for optimization of distribution maintenance scheduling of a recloser. It applies a risk reduction technique associated with maintenance of the equipment. Given a large and complex plant to operate, a real- time understanding of the networks and their situational reliability is important to operational decision support.

Index Termsreliability, distribution system, equipment, power quality, active power, reactive power.

1INTRODUCTION

Reliability of a power system is generally designated as a measure of the ability of the system to provide customers with adequate supply. It is one of the primary performance criteria of power systems. Major outages can have a significant economic impact on utility providers as well as the end users who lose electric service. The power system has been significantly affected by a wide range of outage events caused by incorrect planning, operational error, equipment failures, environmental conditions, adverse weather effects, and load conditions. Large-scale blackouts emphasize the importance of reliability issues.

The reliability evaluation of transmission or composite systems analyzes the system failure events and estimates the chances of loss of load at major load points . The reliability of distribution systems is based on individual customer service interruptions. Since the reliability studies described in this dissertation are customer service oriented, one of the analysis zones of the study includes the whole distribution system with extension to the sub-transmission lines and substations.

For some of the networks analyzed here, the dominant causes of customer power interruptions are problems in secondary networks and faults in sub-transmission systems. Therefore, just considering the distribution system itself is not enough to accurately estimate customer outages.

  1. CHALLENGES IN SYSTEM MODELING AND RELIABILITY ANALYSIS

    The modeling and analysis studies associated with reliability evaluation are challenging, not only because of some of the system characteristics of the above proposed analysis zones, but also for persistent problems that have lingered in the energy industry for decades.

    1. Size. The reliability evaluation of large utility systems can be daunting due to the sheer size of the model. Modeling the underlying distribution system, including each customers service point, can result in a model containing millions of objects. Relatively scant attention has been given to distribution systems as compared to generation and transmission systems. However, as the distribution system could be 80% larger than the transmission system, and occupies as much as 40% of the overall capital outlay of the total grid , it should receive adequate attention.

    2. Data. The modeling and reliability analysis of distribution and/or transmission systems involves a large volume of various types of data and multiple system analysis algorithms. Examples of data include load, operation, planning, system design, system description, and reliability data. Examples of computer program algorithms include load flow, load forecast, network topology tracking and updating, and reliability analysis. Integrating the data into knowledge that is efficiently used by algorithms, and ensuring cooperation among algorithms are challenging tasks .

    3. Load. The electrical load varies from hour to hour, day to day, and season to season. Each type of customer usually has different usage patterns. Residential, commercial, and industrial customers have different power demands and different peak demand times. This non-linear, time-varying characteristic has to be considered in order to obtain sound system evaluation results.

    4. Uncertainty. The power system is vulnerable to many stochastic events. Random failures of control and protection devices, environmental disturbances such as high speed wind,

    lightning and severe storms, irregular load surges due to interruptions, and human errors all have impacts on customer outages.

  2. INTEGRATED RELIABILITY EVALUATION OF POWER SYSTEMS

The reliability evaluation of hierarchical level I includes the generation system only. The generating capacity needs to be determined in order to satisfy the expected demand. The reliability evaluation of hierarchical level II includes generation and transmission systems, which is often referred to as the composite system or bulk power system. The transmission system has to be designed to ensure satisfactory energy transfer from generation plants to bulk load points. The reliability evaluation of hierarchical level III includes all the three systems, and is rarely done due to the enormity of the problem.

Figure1 Hierarchical levels of Power System for Reliability Analysis

During integrated system modeling, if transmission/sub- transmission systems are included, the boundaries of transmission systems are treated such that the generation capacity is not constrained. The reliability studies are then used to examine the energy delivery capability to bulk load points for a transmission system only study or, to end- customers if the study zones include distribution systems.

4 RELIABILITY ASSESSMENT METHODS OF POWER SYSTEMS

The methods used in reliability assessments of power systems determine the accuracy of the results. Analytical and simulation approaches are the two types of techniques used in power system reliability analysis. Each approach has its merits and limitations. In this section, the concepts, assumptions, and typical applications of the commonly used methods in both techniques are reviewed. The limitations of analytical approaches are summarized as the reason to select the Monte

Carlo simulation to perform the reliability analysis in this study.

  1. Analytical Approach

    The analytical analysis methods use mathematical models to provide solutions to a reliability problem. Specific calculation results are obtained for a given set of system topology and input values. Some widely used methods are block diagram, event tree, cut sets, fault tree, state enumeration, and Markov modeling. Using reliability sets in calculation is also proposed in recent years. Their common problem is the frequent need to make simplifying assumptions and approximations.

  2. Simulation Approaches

Compared with analytical approaches, the simulation or Monte Carlo approach is more universal. It provides a solution for complex problems that is not feasible for analytical methods. The Monte Carlo method is widely used to simulate the stochastic behavior of systems and actual processes. The random number generator of the Monte Carlo simulation creates random variants that follow the distribution functions, even non constant hazard rates. The simulation convergence is a fluctuating process, with the estimated outcome closer to the true value as sample size increases. The convergence criterion usually uses the coefficient of varition of the output.

3. Performance indices

The study zones of this study include detailed modeling of end-customer information, and the system evaluation goal is also customer service oriented. SAIFI and SAIDI are the two most popular system level reliability indices used for customer service oriented studies [36]. SAIDI is an abbreviation of System Average Interruption Duration Index. It represents the average interruption duration per customer served per year. SAIFI denotes the System Average Interruption Frequency Index. It is the expected number of interruptions per customer per year. The calculation of SAIDI and SAIFI are shown in (1.1) and (1.2) respectively.

SAIDISYS = Sum of customer interruption durations

Total numbers of customers

(1.1)

SAIFISYS = Total number of customer interruptions

Total numbers of customers

(1.2)

The subscript sys in the above equations denotes that individual reliability indices can be calculated for each

aggregated network, and only considers the customers served by the network. There are a total of 18 aggregate networks defined in the secondary distribution system containers. The whole secondary distribution system can be viewed as the largest aggregate network, with the 120V and 480V networks as individual aggregated networks.

Instead of selecting SAIFI and SAIDI, CAIDI and CAIFI are chosen as the reliability indicators for this study, because they give details of the interruption statistics of each customer. CAIDI is abbreviation of Customer Average Interruption Duration Index. It represents the average interruption duration for those customers served by the same load bus per year. CAIFI denotes for Customer Average Interruption Frequency Index. It is the expected number of interruptions of customers served by a load bus per year.

The calculation of CAIDI and CAIFI is shown in (1.3) and (1.4) respectively.

detail below. All required data to calculate SAIFI are given in Table 1.

In this example, it is assumed that the coordination failure rate of all over current devices (fuses and over current relays or OCRs) is 0.0. That is, in all fault situations, each fuse or OCR operates as required to clear the fault for all systems up line from the fuse or OCR.

TABLE 1 RELIABILITY DATA TABLE

CAIDI =Sum of Customer Interruption Durations Total Numbers of Customers Interruptions

Substation Data

Overhead Line Data

Other

Failure Rate (PR) = 0.1

Failure Rate (PR) = 0.2

Open Time = 0

Repair time (RT) = 5.0 hrs

Repair Time (RT) = 2 hrs

Time to Find Problem = 0

Close time (CT) = 0.5 hrs

Travel time = 0

Substation Data

Overhead Line Data

Other

Failure Rate (PR) = 0.1

Failure Rate (PR) = 0.2

Open Time = 0

Repair time (RT) = 5.0 hrs

Repair Time (RT) = 2 hrs

Time to Find Problem = 0

Close time (CT) = 0.5 hrs

Travel time = 0

(1.3)

SAIDI = Total number of customer interruption Total numbers of customers Affected

  1. CALCULATION AND RESULTS

    5.1 Calculation of Reliability Indexes

    SUB A

    OH1

    NO.OF CUSTOMER=1500

    Figure 2 Distribution model

    (1.4)

    In this example, 1500 consumers are connected to a Substation (SUB A) through an overhead line (OH 1). In the Figure 2, there are no switches or over current devices (fuses and OCRs) in this circuit. Any fault at SUB A or OH 1 will interrupt all 50 customers. Since only elements with non-zero customers contribute to the total customer interruptions, the mean failure rate can be calculated for line element only

    Calculation of System Average Interruption Frequency Index (SAIFI):

    MFR for OH 1 =FR of SUBA+FR of OH 1

    = 0.1 + 0.2

    = 0.3

    TABLE 2 SAIFI CALCULATION TABLE

    Element

    FR

    MFR

    No. of customer Customer

    Customer interruption Interruptions

    SUB A

    0.1

    0

    0

    OH 1

    0.2

    0.3

    1500

    720

    Total

    1550

    720

    Element

    FR

    MFR

    No. of customer Customer

    Customer interruption Interruptions

    SUB A

    0.1

    0

    0

    OH 1

    0.2

    0.3

    1500

    720

    Total

    1550

    720

    The procedure and calculations to find SAIFI for a distributed model, as shown in Figure 2 , are provided in

    Outage on Device

    Number of Customers Customer Interruption

    Interruption Duration (hour)

    Failure Rate (per year)

    Customer Hours Per Year

    SUB A

    7

    5

    0

    5

    . 5

    0

    . 1

    1550

    OH 1

    7

    5

    0

    2

    . 5

    0

    . 2

    1600

    Total

    3150

    Total Customer Served: 1500

    Outage on Device

    Number of Customers Customer Interruption

    Interruption Duration (hour)

    Failure Rate (per year)

    Customer Hours Per Year

    SUB A

    7

    5

    0

    5

    . 5

    0

    . 1

    1550

    OH 1

    7

    5

    0

    2

    . 5

    0

    . 2

    1600

    Total

    3150

    Total Customer Served: 1500

    Total Customer Interruptions = 1440 Total Number of Customer served = 1500

    Therefore SAIFI = Total Customer Interruption

    Total no. of Customers Served

    = 1440/1500

    = 0.90

    Calculation of System Average Interruption Duration Index (SAIDI):

    TABLE 3 SAIDI CALCULATION TABLE

    1. Select the Reliability Analysis module from the Analysis Modes option.

    2. Select the required equipment from the tool bar, and draw the distribution model.

    3. Click the Graphical Analysis tool bar button or select Analysis/Graphical Analysis from the menu bar, which shows the following options. Reliability Analysis, b. Travel Time Calculation, c. Element Reliability Data

    4. Use the Reliability Analysis tab for the Reliability analysis settings.

    5. Use the Travel Time Calculation tab for the time setting,.

    6. Element Reliability Data tab provides a Reliability Data Quick Editor option, which allows setting reliability element data by element category.

    7. After completing the model, click the Recalculate Analysis tab to run the reliability analysis.

    8. After running the Reliability Analysis, click the DisplayCurrent Report tab for a summar report.

      Therefore

      ID (SUBA) =5+0.5

      SAIDI = Customer Hour/Year

      Total Customer Served

      = 3150/1500

      =2.107

      Figure 3 Result of analysis of SAIFI and SAIDI

      From the above report, we can see that SAIFI is 0.957 and SAIDI is 2.01, which verifies that the prediction of SAIDI and SAIFI for is done properly.

      VARIOUS DISTRIBUTION MODELS USED IN ANALYSIS

      Verification of SAIDI, and SAIFI Using Reliability Evaluation Software

      This section presents verification of the calculation of SAIDI and SAIFI for using commercial reliability evaluation software.

      SUB A OH1

      DER

      SUB A OH1

      NO OF CUSTOMER= 20

      Model (a)

      Model (e)

      SUB A FUSE OH 1

      NO OF CUSTOMER= 20 NO OF CUSTOMER= 50

      Model (b)

      NO OF CUSTOMER= 50

      Model (f)

      SUB A

      OH1 OH2

      NO OF CUSTOMER= 50

      SUB A

      OH 1

      Model (c)

      NO OF CUSTOMER= 20 NO OF CUSTOMER= 50

      SUB A

      OH 1

      Model (g)

      NO OF CUSTOMER= 20

      Model (d)

      SUB A OH1 OH2

      NO OF CUSTOMER= 20 NO OF CUSTOMER= 50

      SUB A

      OH 1 OH 2

      NO OF CUSTOMER= 50

      Model (h)

      Model No.

      System Description

      SAIFI

      SAI DI

      Result

      Reason

      (a)

      Customers supplied with a source SUB A. Hasa DER asa backup or alternative source.

      Model in Figure

      5.1 hasno DER.

      0.3

      1.05

      Samevalue indices as in Figure 1

      No protectingdevice between SUB A and OH 1. DER cannot connect if line is still connected to failed substation.

      (b)

      S i m i l i a r to model in

      Model 5.1 but with 20 additional customers.

      0.3

      1.05

      Same valueof indices as in Model (a)

      Customers of SUB Aadded to OH 1 sincenoprotection devicetoseparate SUB A and OH 1. 11 OH1 fails, the substation must be disconnected fromtheentire system.

      (c)

      No DER.

      Customer supplied through two radial overhead

      lines bya substation.

      0.5

      1.55

      Poorer reliability indices than in Model (b)

      Addition of OH 2 adds another component that can fail.

      (d)

      Sameasprevious model with DER.

      0.5

      1.55

      Samevalueof indices as in Model (c)

      No protectingdevices between SUB Aand DER to OH 1 and OH 2.

      (e)

      No DER.

      Customers are in each OHlineofa radial system.

      0.5

      1.55

      Samevalueof indices as in Model (c)

      Acts like 70 customersat OH 2 sincenoprotective devicesbetween OH 1 and OH 2.

      (f)

      Customers supplied through an OHline that hasan over currentprotecting device.

      0.3

      0.95

      Improve- ment inboth reliability indices

      Protectingdevice fuseused between SUB Aand OH 1.

      Now, OH 1 can be connected to DER.

      (g)

      s i m i l a r topreviousmodel

      (f) but 20 more customeradded d a

      thesource.

      0.242857

      1

      0.8357

      143

      More improved Reliability over Model (f)

      Better reliability. In Model (0, 50/50 customersare

      interrupted but in model (g),50/70

      customerareinterrupted.

      Model No.

      System Description

      SAIFI

      SAI DI

      Result

      Reason

      (a)

      Customers supplied with a source SUB A. Hasa DER asa backup or alternative source.

      Model in Figure

      5.1 hasno DER.

      0.3

      1.05

      Samevalue indices as in Figure 1

      No protectingdevice between SUB A and OH 1. DER cannot connect if line is still connected to failed substation.

      (b)

      S i m i l i a r to model in

      Model 5.1 but with 20 additional customers.

      0.3

      1.05

      Same valueof indices as in Model (a)

      Customers of SUB Aadded to OH 1 sincenoprotection devicetoseparate SUB A and OH 1. 11 OH1 fails, the substation must be disconnected fromtheentire system.

      (c)

      No DER.

      Customer supplied through two radial overhead

      lines bya substation.

      0.5

      1.55

      Poorer reliability indices than in Model (b)

      Addition of OH 2 adds another component that can fail.

      (d)

      Sameasprevious model with DER.

      0.5

      1.55

      Samevalueof indices as in Model (c)

      No protectingdevices between SUB Aand DER to OH 1 and OH 2.

      (e)

      No DER.

      Customers are in each OHlineofa radial system.

      0.5

      1.55

      Samevalueof indices as in Model (c)

      Acts like 70 customersat OH 2 sincenoprotective devicesbetween OH 1 and OH 2.

      (f)

      Customers supplied through an OHline that hasan over currentprotecting device.

      0.3

      0.95

      Improve- ment inboth reliability indices

      Protectingdevice fuseused between SUB Aand OH 1.

      Now, OH 1 can be connected to DER.

      (g)

      s i m i l a r topreviousmodel

      (f) but 20 more customeradded d a

      thesource.

      0.242857

      1

      0.8357

      143

      More improved Reliability over Model (f)

      Better reliability. In Model (0, 50/50 customersare

      interrupted but in model (g),50/70

      customerareinterrupted.

      1. CONCLUSION

        Although much research has been performed on the reliability evaluation of power systems, how large-scale realistic systems should be analyzed is still under investigation. Various values of reliability models and analysis are described in Table 4.

        This research makes efforts to move forward the past works towards the direction of addressing reliability needs directly from the consumer point of view. Previously, electric utilities use contingency and margin criteria for indirect reliability measures during planning and design. Generally, consumer oriented reliability evaluation indices such as SAIDI and SAIFI are not directly used in the design stage. However, given the complexity of the realistic system with constant facility additions and operating changes, directly use reliability values as numeric criterion on selecting a solution among potential alternative designs is expected to be a trend. In this research, the expected reliability behaviors of realistic systems are computed by utilizing detailed analysis of their configurations and equipment information.

        REFERENCES

        1. "WEST SYSTEMS COORDINATING COUNCIL FINAL REPORT,AUGUST10TH 1996 EVENT," OCTOBER 1996.

        2. WSCC, "Western Systems Coordinating Council (WSCC)Disturbance Report for the Power System Outage that Occurred on the Western Interconnection,August 10, 1996," approved by the WSCC Operation Committe on October 18, 1996.

        3. U.S.-Canada Power System Outage Task Force, "FinalReport on the August 14th Blackout in the United States and Canada," Department of Energy anNational Resources Canada2004.

        4. L. L. Grigsby, Electric Power Generation, transmission,and distribution, 2nd ed., 2007.

          TABLE 4 SUMMARIES OF DISTRIBUTION MODELS USED IN ANALYSIS

        5. R. N. Allan and R. Billinton, "Power system reliabilityandits assessment. Part 2. Composite generation and transmission systems," Power Engineering Journal [see also Power Engineer], vol. 6, pp. 291-297, 1992.

        6. J. Endrenyi, M. P. Bhavaraju, K. A. Clements, K. J. Dhir,

          M. F. McCoy, K. Medicherla, N. D. Reppen, L. A. Saluaderi,

          S. M. Shahidehpour, C. Singh, and J. A. Stratton, "Bulk power system reliability concepts and applications," Power Systems, IEEE Transactions on, vol. 3, pp. 109-117, 1988.

        7. J. Endrenyi, P. F. Albrecht, R. Billinton, G. E. Marks, N.

          D. Reppen, and L. Salvaderi, "Bulk Power System Reliability Assessment-Why And How? Part I: Why?," IEEE Transactions on Pow Apparatus and Systems, vol. PAS-101, pp. 3439-3445, 1982.

        8. J. Endrenyi, P. F. Albrecht, R. Billinton, G. E. Marks, N.

          D. Reppen, and L. Salvaderi, "Bulk Power System Reliability Assessment-Why and How? Part II: How?," IEEE Transactions on Power Apparatus and Systems, vol. PAS-101, pp. 3446-3456, 1982.

        9. R. E. Brown, Electric Power Distribution Reliability: CRC, 2002.

        10. R. E. Brown, S. Gupta, R. D. Christie, S. S. Venkata, and

R. Fletcher, "Distribution system reliability assessment: momentary interruptions and storms," Power Delivery, IEEE Transactions on, vol. 12, pp. 1569-1575, 1997.

Leave a Reply