Optimum Placement of STATCOM in Distribution Network to Improve Uptime of DER using Sensitivity Index

DOI : 10.17577/IJERTV3IS061663

Download Full-Text PDF Cite this Publication

Text Only Version

Optimum Placement of STATCOM in Distribution Network to Improve Uptime of DER using Sensitivity Index

Pavana R1, Dr. Shankaralingappa. C. B2 , Dr. R. Prakasp

(1, 2, 3) EEE Dept, Acharya Institute of Technology, Bangalore

Abstract – In recent years, with increasing development in power networks, the economical operation of power system is more considered . Distributed energy resources (DER) have emerged as a promising option to meet growing customer needs for electric power with an emphasis on reliability and power quality. Due to increase in load demand, need DER increases. The fault occurrence make the DERs to disconnect due to large time taken for clearance of it. If the voltage is not proper the DERs may be disconnected from the line. This may cause demand to rise and the generation to be less. To eliminate this problem a static synchronous compensator(STATCOM) is used to reduce the settling time. STATCOM is one of the new generation flexible AC transmission systems(FACTS) devices with a promising future application . So optimal placement of STATCOM is essential to improve the uptime of DER and sensitivity index method is chosen for optimal location of STATCOM.

Index Terms – Sensitivity Index, capacitor placement, Tabu Search, FACTS placement.

  1. INTRODUCTION

    Todays electric system is expected to bring high- quality and reliable power to customer loads. More than a century of development has led to a large, interconnected system that brings power from central-station generators via transmission and distribution to end-use customers. Although this system can provide relatively inexpensive power, issues remain such as increasing fuel costs, reducing power plant emissions, and increasing customer needs for higher reliability power. One potential solution to these issues is the use of distributed and renewable energy sources at the distribution level.

    DER have emerged as a promising option to meet growing customer needs for electric power with an emphasis on reliability and power quality.DER system sizes typically range from five kilowatts (5 kW), which is the approximate demand for a typical residential customer to up to 10 megawatts (10 MW) for large commercial or medium industrial installations. Government incentives and lowering cost of renewable DER are some of the driving forces for the steeper growth in DER installations. DERs are commonly connected near the load in electric power distribution systems and include renewable energy such as wind , Landfill gas, Combined heat and power (CHP, or cogeneration)and solar, fossil-fuel based generation like micro turbines, and other distributed energy storage elements[1].

    Due to increase in load demand, need of DER increases. The fault occurrence make the DERs to disconnect due to large time taken for clearance of it. All the DERs are connected and controlled by voltage control technique. So it takes time to settle the voltage at the line. If the voltage is not proper the DERs may be disconnected from the line. This may cause demand to rise and the generation to be less. To eliminate this problem a static synchronous compensator is used to reduce the settling time. Tripping of small DER units due to slow voltage recovery is avoided. Here a new index is formulated to make the voltage recovery time faster. The STATCOM is one of the new generation FACTS devices with a promising future application, which is recognized to be one of the key advanced technologies of future power system. The performance is checked by two steps, they are, calculating the index value and finding the optimal location of STATCOM and making a dynamic simulation and checking the transient stability [2]. The IEEE 16 bus system is considered for case study. These analyses are carried out using MATLAB R2011b.

  2. PROBLEM FORMULATION

    STATCOM placement at optimal location will lead to quick recovery of voltage at all buses of interest and improve the uptime of DER units. The optimal location of STATCOM is the optimization problem with non linear objective function with the corresponding constraints like voltage limit etc.

    Here, the objective function [2] is mathematically formulated as the following equation.

    Where

    V/I R is the sensitivity index

    j=phase angle of voltage at jth bus

    i == phase angle of voltage at ith bus

    ji =angle of the element in Y bus matrix connected between jth and ith bus

    |Yji |=magnitude of the element in Y bus matrix

    nj is the set of branches connected to bus j.

  3. OPTIMAL CAPACITOR PLACEMENT Capacitors are often installed in distribution system

for reactive power compensation to carry out power and

energy loss reduction, voltage regulation, system security improvement, and system capacity release. Economic benefits of the capacitor depends mainly on where and how many capacities of the capacitor are installed and proper control schemes of the capacitors at different load levels in the distribution system.

A variety of methods have been devoted to solving the capacitor placement problem. In the early work, most of the researchers used conventional analytical method in conjunction with some heuristics. Tabu search(TS) is a strategy for solving combinatorial optimization problem. The TS strategy has been applied in various fields, and the capability of the TS to obtain high quality solutions within reasonable computing time has been verified. The TS method is built upon a descent mechanism of a search process. The descent mechanism biases the search toward points with lower objective function values, while special features are added to avoid being trapped in the local minima[9,10].

In this section, a step by step TS based solution algorithm for the capacitor placement problem is presented.

Step 1: Input system data. network data and parameter setting (e.g., lower and upper bounds on operating voltage, tabu list size, etc.)..

Step 2: Generate an initial feasible solution state.

  1. Randomly select a solution state from the solution space and initialize Sbest variable ( Sbest stores the best solutions).

    Step 3: check the stopping criteria (Iteration count < maximum iteration) if it is satisfied go to step 4 otherwise Output the optimal solution state. Output of the solution algorithm includes the optimal locations and sizes of capacitors to be installed.

    Step 4: Generate the neighbor solutions by satisfying aspiration criterion.

    Step 5: Identify the best candidate from candidate list and evaluate the best candidates.

    Step 6: Update the Sbest by comparing with Cbest (candidate best).

    Step 7: Update the tabu list by Sbest.

    Step 8: Update the iteration counter and continue the tabu search procedure criteria until the stopping criteria is satisfied.

    1. STATCOM PLACEMENT

      The key steps developed to secure a voltage profile throughout a distribution system for all operating conditions (steady state and postfault) are depicted in Fig. 2. Inclusion of DER unit results in reduction of real power intake from the

      utility grid. Steady state voltage requirement (as in Table I) at the load end as well as the DER connection point is maintained by following an optimal capacitor placement algorithm. VAR optimization and planning is associated with a non differentiable objective function, which leads to a heuristic algorithm for the solution. In the present work, Tabu search-based optimization has been chosen to obtain optimal location and sizes of fixed capacitor banks.

      Fig 1. Flowchart for capacitor placement

      Wth the application of various faults such as single line to ground faults and three-phase faults in the system, time domain simulations can be carried out to check the dynamic voltage restoring capability of the generator and load bus. As a three phase fault is the most severe contingency, the present study concentrates on voltage recovery with a three-phase fault near to the generator bus, which makes the proposed methodology applicable for all other faults.

      Placement of STATCOM is considered only when the static compensator (capacitor bank) fails to maintain the required voltage profile under post fault conditions. For the placement of STATCOM, the proposed sensitivity index along with its direction is used to find out the single best location. The bus having the highest negative indicates the necessity of inductive current injection by STATCOM at that bus. The optimal capacitor on that bus is replaced by STATCOM of the same reactive power set point and voltage recovery time is obtained with the help of time domain simulation for the generator buses. If the first STATCOM fails to support recovery within an allowed time frame, with the first STATCOM in place the bus with the second most negative sensitivity index is searched .This leads to the placement of a second STATCOM.

      The procedure is repeated until the voltage excursion of all buses concerned fall within the boundary specified by the standard/grid code. The proposed index utilizes an inherent feature of STATCOM, which allows

      reactive current injection even at diminishing terminal voltage Index calculated with frequent snapshots, allows capturing fast dynamics Performance of in choosing the best place for STATCOM is compared with an existing sensitivity index. Effectiveness of the index and the methodology based on this index has been verified through time domain simulations.

      Fig 2. Flowchart for STATCOM placement

    2. RESULTS AND DISCUSSION

A. TEST DISTRIBUTION SYSTEM

The proposed method is tested on 16 -bus Distribution system. The base case results and results obtained after capacitor placements and graphs indicating the system voltage are also described. The SI(sensitivity index) is calculated to know that whether system is inductive if yes then the STATCOMs are placed in those buses which are inductive in nature, this is known by the presence of negative values in SI. The calculations will be performed on the IEEE 16-bus system.

The test system is simulated in MATLAB and the proposed methodology has been tested, whose results are shown in below. The test distribution system as shown in figure (3) consists of 16 buses .The total load in the test system is 28.7 MW a 17.3 MVR.. The minimum and maximum voltages are set at 0.95 and 1.05p.u. respectively.The distribution system characteristics are Number of buses= 16, Number of lines=15, Slack bus no=1, base voltage= 11 kV, base MVA= 100

B .DER UNITS AND THEIR CAPACITY

DER units in this study are conventional synchronous generators. The location of DER units are chosen at bus 3 and 6(locations are chosen from mp).DER connection details are presented in Table I.

C.CAPACITOR PLACEMENT AND SENSITIVITY INDEX VALUES

Tabu search technique is used to find out the feasible locations and sizes of capacitors in the system. The maximum number of iterations is set as stopping criteria for this algorithm. Table II summarizes the results for optimal capacitor places for 16 bus system.

Fig 3.Single line diagram:16 bus system

TABLE I

DER units capacity and location

DER units

16 bus system

DER 1

DER 2

Location bus

3

6

MVA rating

10

20

Power factor

1

1

TABLE II

Optimal capacitor solution for 16 bus system

Optimal Bus

Capacitor Size(MVAr)

Sensitivity index

V/ Q (Vp.u/MVAr)

7

3.6

0.0005

5

1.6

0.016

9

1.8

0.0032

15

1.2

0.0020

3

1.8

0.0017

.D.VOLTAGE RECOVERY AND STATCOM PLACEMENT

According to [2 ], the voltage at the DER terminal must come back to 88%of its normal operating voltage within 2 s after initiation of an abnormal condition. STATCOM has been introduced to provide dynamic reactive power support in the test system under such conditions. Instead of going for additional locations, the best possible bus for placing STATCOM has been decided within the optimal buses, which were chosen by the optimal capacitor placement

algorithm. Sensitivity indices are calculated for optimal capacitor buses and listed in Tables II and III.

The static rating of STATCOM for each system is chosen based on the optimal capacitor size found from Tables II and III.

Fig 4. Graph of loss versus number of iterations

TABLE III

Sensitivity Index values for 16 bus system for STATCOM placement.

Optimal bus

Sensitivity index

V/I R (Vp.u/Ip.u)

7

-0.00915336(inductive)

5

0.138578

9

0.030427

15

0.0093905

3

0.0889023

As shown in Table III , the most negative value of is found at bus 7, whereas the most positive value is found at bus 5. As STATCOM can absorb as well as inject IR(shunt reactive current ) , the value of V/I R can be both positive and negative. A positive value of the index indicates the requirement of supplying IR , whereas a negative value stands for the necessity of inductive current at the connection bus of STATCOM. Therefore, a large value of V/I R for a particular bus in system indicates high voltage sensitivity with injection/absorption of reactive current from/by STATCOM..

In order to check the voltage profile under abnormal conditions, the 16 bus system is subjected to a three-phase fault near the generator bus. The following test cases are investigated.

Case 1) without capacitors;

Case 2) with capacitors at optimal locations;

Case 3) with STATCOM at a bus with the highest V/I R (for both inductive, i.e., negative and capacitive, i.e., positive values).

The STATCOM is placed at bus 5 and bus 7.. The time domain simulation for 16 bus system with three phase fault at bus 7, bus 3 is shown in Fig 5, 6 respectively. The STATCOM placed at highest Sensitivity Index recovers the voltage faster than the capacitors

Fig 5. Voltage at bus 7 with three phase fault

Fig 6. Voltage at bus 3 with three phase fault

VI.CONCLUSION

The optimal location of STATCOM is found by sensitivity index. STATCOM ensures fast voltage recovery at all buses of interest. The exposure of DER units to the problem of slow voltage recovery for contingencies like faults is minimized

.Simulation results prove that the presence of STATCOM at a bus with highest negative value ensures a fast voltage recovery at all buses of interest. The simulation is demonstrated in MATLAB/Simulink on IEEE 16 bus system..

  1. REFERENCES

    1. Benjamin Kroposki, ,P.K. Sen, and Keith Malmedal, Optimum Sizing and Placement of Distributed and Renewable Energy Sources in Electric Power Distribution Systems,(2013).

    2. Tareq Aziz, Mhaskar, Tapan Kumar Saha, Nadarajah Mithulananthan An Index for STATCOM Placement to Facilitate Grid Integration of DER , IEEE transactions on sustainable energy, vol. 4, no 2, April 2013 (2013)

    3. K. Merini, F.Z. Gherbi, S. Hadjeri, K.F. Elatrech , Study the best location of STATCOM to improve the voltage ,Intelligent Control and Electrical Power Systems Laboratory( ICEPS).

    4. C. Chompoo-inwai, C. Yingvivatanapong, K. Methaprayoon, and L. Wei-Jen, Reactive compensation techniques to improve thride-through capability of wind turbine during disturbance, IEEE Trans. Ind. Appl., vol. 41, no. 3, pp. 666672, May/Jun. 2005.

    5. S. Foster, L. Xu, and B. Fox, Coordinated reactive power control for facilitating fault ride through of doubly fed induction generator- and fixed speed induction generator-based wind farms, IET Renew. Power Generat., vol. 4, no. 2, pp. 128138, 2010.

    6. A. Keane, L. F. Ochoa, E. Vittal, C. J. Dent, and G. P. Harrison, Enhanced utilization of voltage control resources with distributed generation, IEEE Trans. Power Syst., vol. 26, no. 1, pp. 252260, Feb. 2011.

    7. M. Noroozian, N. Anderson, B. Thorvaldson, A. Nilsson, and C.Taylor, Benefits of SVC and STATCOM for electric utility application, in Proc. IEEE/PES Transmission and Distribution Conference and Exposition 2003, Dallas, TX, 2003.

    8. A. Samimi and M. A. Golkar, A novel method for optimal placement of STATCOM in distribution networks using sensitivity analysis by] DIgSILENT software, in Proc. Asia-Pacific Power and Energy Engineering Conf. (APPEEC 2011), Wuhan, China, 2011.

    9. Reza SIRJANI, Azah MOHAMED, Hussain SHAREEF, Optimal Placement and Sizing of Shunt FACTS Devices in Power Systems Using Heuristic Optimization Techniques:

      a Comprehensive Survey ,PRZEGLD ELEKTROTECHNICZNY (Electrical Review), ISSN 0033-2097, R. 88 NR 10b/2012 335.

    10. H. Yann-Chang, Y. Hong-Tzer, and H. Ching-Lien, Solving the capacitor placement problem in a radial distribution system using TS approach, IEEE Trans. Power Syst., vol. 11, no. 4, pp. 18681873,

      Nov. 1996

    11. P. Dulce Fernao, A. G. Martins, and C. H. Antunes, A multiobjective model for VAR planning in radial distribution networks based on TS, IEEE Trans. Power Syst., vol. 20, no. 2, pp. 10891094, May 2005.

    12. IEEE Standard for Interconnecting Distributed Resources With Electric Power Systems, IEEE std. 1547-2004, 2004.

    13. IEEE Standard for Interconnecting Distributed Resources With Electric Power Systems, IEEE std. 1547-2003, 2003.

    [14]IE789F_tabu.pdf,www.ise.ncsu.edu(http://www.ise.ncsu.edu/fangroup

    /ie789.dir/IE789F_tabu.pdf).

    1. Tarek Medalel Masaud1 ,P.K. Sen2, Study of the Implementation of STATCOM on DFIG-Based Wind Farm Connected to a Power System, IEEE Trans,power syst,2011.

    2. P. Subburaj , K. Ramar, L. Ganesan , Distribution System Reconfiguration for Loss Reduction using Genetic Algorithm,JES,2006

    3. N. G. Hingorani, L. Gyugyi, "Understanding FACTS; Concepts and Technology of Flexible AC Transmission Systems," IEEE® Press book, 2000.

    4. S.Civanlar, J. J.Grainger,H.Yin, and S. S. H.Lee, Distribution feeder reconfiguration for loss reduction, IEEE Trans. Power Del., vol. 3, no. 3, pp. 12171223, Jul. 1988.

    5. IEEE Recommended Practice for Industrial and Commercial PowerSystems Analysis, IEEE Std. 399-1997, 1998.

    6. B. Pokharel and G. Wenzhong, Mitigation of disturbances in DFIG- based wind farm connected to weak distribution system using STATCOM, in Proc. North American Power Symp. (NAPS 2010), Arlington, TX, 2010.

    7. T. Aziz, T. K. Saha, N. Mithulananthan, and O. Krause, Key factors influencing voltage recovery of DG units in distribution system, in Proc. Australasian Universities Power Engineering Conf.(AUPEC12),

      Bali, Indonesia, 2012

    8. A. Yazdani and P. P. Dash, A control methodology and characterization of dynamics for a photovoltaic (PV) system interfaced with a distribution network, IEEE Trans. Power Del., vol. 24, no. 3, pp. 15381551, Jul. 2009

  2. BIOGRAPHIES

Pavana R, received B.E (Electrical) from AIT, Bangalore in the year 2012 and pursuing M.Tech (Power System Engineering) in Acharya Institute of Technology under Visvesvaraya Technological University, Belgaum. Research interests are Smart Grid systems and FACTS .

Dr.Shankaralingappa.C.B, was born in Raichur, Karnataka, India on 1st June, 1969. He received the B.E (Electrical) and M.E (Energy systems) degrees from Karnataka University Dharwd, India in 1993 and 95, respectively.

He was awarded Ph.D. degree under Visvesvaraya Technological University Belgaum, India in the year 2011. His research interests are distributed generation, Smart grid system, optimization and intelligent systems

Dr.R.Prakash, was born in Hiriyur, Karnataka, India in the year 1960. He received the B.E (Electrical) from, Karnataka University, Dharwar, India in the year 1983 and M.E (Power systems) from Shivagi University, Maharashtra, in the year 1990-91.

He was awarded Ph.D. degree under Visvesvaraya Technological University Belgaum, India, in the year 2011. His research interests is Distribution System Reactive Power Management, Distributed Generation and Smart Grid system.

Leave a Reply