Performance Review of Tunnel Boring Machines

DOI : 10.17577/IJERTCONV9IS11042

Download Full-Text PDF Cite this Publication

Text Only Version

Performance Review of Tunnel Boring Machines

Saikat Gope

Mechanical Engineering Department, JIS College of Engineering, Kalyani, India

Indranjan Ghosh Mechanical Engineering Department, JIS College of Engineering, Kalyani, India

Satadal Bhattacharya Mechanical Engineering Department, JIS College of Engineering, Kalyani, India

Jaydip Ghosh

Mechanical Engineering Department, JIS College of Engineering, Kalyani, India

Dr. Sandip Ghosh

Mechanical Engineering Department, JIS College of Engineering, Kalyani, India

Abstract Tunnel-boring machines are the primary gear for the development of trenchless underground designing tasks, for example, rail travel, civil designing, railroad tunnels, and so on. This paper reviews various tunnel boring machine types, cutting tools, and machine performance through several case studies. It was found that these machines are highly efficient in various projects associated with hydropower, sewerage, water supply, irrigation, and transportation. The idea of the ground conditions decides the decision and situating of the unearthing apparatuses for the shaper head or the cutting wheel. Just if the apparatuses are consummately coordinated to the topography, the TBM can accomplish high tunneling exhibitions. It was also noted that the machine performance depends on the change of uniaxial compressive strength of soil in a variety of geological rock compositions and underground water reservoirs.

Keywords TBM, UCS, Tunnel, Boring.

  1. INTRODUCTION

    The bore construction method for tunnels involves digging a tube-like passage through the earth. This is usually applicable for mountain tunneling, tunneling under bodies of water for various purpose like transportation and other supply lines. Rather than conventional tunneling methods which extensively use explosives and manual labor, mechanized tunnel excavation is done by Tunnel Boring Machine (TBM). The cutter head on the machine rotates and thrusts into the rock surface that lies ahead of it. This thrust causes the cutting disc tools to break the rocks. The grippers/braces develop the reaction to applied thrust and torque forces with the help of anchoring. Tunneling with it is much more efficient and results in shortened completion times, assuming they operate successfully. The Double shield tunnel boring machine used in subsurface mining has been shown in Fig. 1. Drilling and blasting however remains the preferred method when working through heavily fractured and sheared rock layers. A typical TBM includes a hydraulic thrust system, and an attitude positioning system. The cutter head system undertakes the task of excavating rocks and soil, which plays an important role [1]. The technologies of the Double-O-tube (DOT) and Multi-circular Face (MF) shield machines (Fig. 2(a) and (b)) were mainly developed in Japan [2]. Compared with a parallel twin tunnel, the width of a cross-section excavated by a DOT shield machine is much narrower, to be mainly applied to the integrated excavation of subway stations. However, owing to

    the complex excavation cross-sections and relatively large ground disturbance soil can adhere to the TBM shield body and accumulate during TBM advancement. A quasi- rectangular TBM was developed based on the DOT shield machine by increasing the eccentric multi-shaft cutterhead in order to excavate the blind areas. The excavation cross- section, whose upper and bottom shapes are circular arcs, has an ellipse-like quasi-rectangular shape that has improved the bearing capacity of the equipment and segments, solved the soil problems and reduced ground disturbance (Fig. 2(c)).

    The quality and lifetime of the excavation tools have a noticeable effect on the tunnelling performance and the economic efficiency of mechanized tunnelling. The high material quality of the tools ensures the productive removal of soil or rock on the one hand, and low downtimes due to high durability on the other. The excavation tools are installed on the cutterhead in soft ground called cutting wheel. With the rotational movement of the cutterhead and the thrust of the hydraulic jacking stations, the excavation tools loosen the rock and / or the soil at the tunnel face. Depending on the geology, the cutterhead is equipped with cutting knives and / or disc cutters (discs) or rippers. To ensure that a project remains within the calculated budget, also with respect to tooling, the excavation tools must perform as forecast even with extremely high rock strengths, abrasion and water pressures.

    Figure 1. Double Shield Tunnel boring machine used in subsurface mining

    a b c

    Figure 2. (a) DOT shield machine, (b) quasi-rectangular shield machinery, (c) MF shield machine

  2. OPERATING PARAMETERS OF A TUNNEL

    BORING MACHINE

    1. Parameters for selecting TBM types

      Tunnel Boring Machine includes sophisticated types of equipment for excavating tunnels with the help of a variety of soil and rock strata. On average it excavates around 50-60 feet per day which is 20 hours of excavation approximately. The best machine for a project is selected on the basis of geological conditions of the site. A standard specification of double shield TBM machine is shown in Table 1 to get a fare idea of cutting parameters.

      TABLE 1. SPECIFICATION OF DOUBLE SHIELD TBM [3]

      Parameters

      Value

      Parameters

      Value

      Machine diameter

      4.65 m

      Cutter head power

      1250 KW

      Cutter diameter

      432 mm

      Cutter head speed

      0-11 rpm

      Numbers of disc cutters

      31

      Cutter head torque

      1723 KN-m

      Disc nominal spacing

      90 mm

      Conveyor capacity

      200 m3/hr

      Maximum operating cutter head thrust

      16913 KN

      TBM weight

      170 ns

      Basically, it can be classified into eight types depending on both hard rock and soft ground. Gripper type is suitable for driving in hard rock conditions when there is no need for a final lining. Double-shield type is generally considered to be the fastest machine for hard rock tunnels. Single-shield type is used in soils that do not bear groundwater and where rock conditions are less favorable than for double shields, such as in weak fault zones. Earth pressure balance technology is suitable for digging tunnels in unstable ground such as clay, silt, sand, or gravel. Slurry is used for highly unstable and sandy soil. Mixshield technology is a variant of conventional technology for heterogeneous geologies and high-water pressure. Pipe jacking also called micro tunneling to small-scale tunneling method for installing underground pipelines with minimum surface disruption. Partial-face excavation machines have an open-face shield and can sometimes be more economical.

    2. Parameters involved in the selection of Cutting Wheel and Cutter head

    The nature of the ground conditions determines the choice and positioning of the excavation tools for the cutterhead or the cutting wheel. Only if the tools are perfectly matched to the geology, the TBM can achieve high tunnelling performances. However, the respective ground conditions challenge the reliability of the tools in different places. In soft soils, precautions must be taken to stop the disc cutters from getting clogged. During excavation in hard rock, such as granite, the dis cutters must pass the absolute hardness test. In addition to the geology, limited space at the cutterhead and the maximum possible load on the disc cutter bearings are also crucial factors when choosing the appropriate tool size. A wide range of cutting knives, buckets, rippers and other tools complement the spectrum for operations in loose soils. With respect to these types of tools, the durability and material composition are also key factors in optimizing time and costs. The durability of the excavation tool edges and/or teeth is improved enormously by soldering carbide metal tungsten carbide. Depending on the geology, cutting knives, buckets and rippers are given a welded hard-facing on the tool body to protect it against abrasive soil paste. [4] The high-alloy tool steel of the cutting ring must not only be very hard to resist wear, the material toughness is also an important factor for its lifetime. Excessively brittle steel would lead to early material spalling at the cutting ring during rock bursts, which happen occasionally. Excavation tools up to 8 inches for smaller excavation diameters are also made of high-alloy tool steel. Various type of disc cutters, their operational orientation and cutter head geometries have been shown in Figure 3.

    When the rotating cutting wheel on the TBM head is pushed forward against the tunnel face, cutting tools mounted on the cutter head are in contact with the ground and are thus subject to continuous wear processes. This wear behavior of the cutting tools is highly related to earth pressure or abrasiveness and machine steering parameters such as the face support pressure, advance speed and cutting wheel rotation speed. Whenever a tool reaches a critical wear level and must be replaced, the production processes of the TBM must stop in order to get access to the excavation chamber and to the cutting wheel. Unstable ground conditions require

    a pressurized excavation chamber to prevent a collapse of the tunnel face. Releasing the support pressure and conducting maintenance work in atmospheric pressure conditions significantly increases the risk of a tunnel face collapse and is mostly unfeasible. However, when working under pressurized conditions, additional time is needed for workers to adapt to pressurized conditions. Consequently, maintenance work is an elaborate and time-consuming process significantly decreasing the performance, but necessary in order to ensure workability of the TBM. A maintenance procedure for TBM cutting tools can be divided into the mobilization processes, inspection and tool replacing work and the demobilization processes [5]. The overall mobilization process (tmob) includes lowering the level of support (tlow), compressing workers (tcompress), installing working platforms (tinstallation) and cleaning the cutting wheel (tcleaning).

    a

    b

    c

    Figure 3. (a) Disc Cutter Size and types (b) Cutter Placement on TBM shield,

    (c) Geometry of Cutter Heads

  3. CASE STUDIES ON TBM PERFORMANCE AND

    PARAMETRIC EFFECTS

    1. Subsurface System Tunneling

      Change of all surface water pipelines and to create subsurface systems by constructing tunnels to avoid problems of leakage, unconventional loss and also to protect water from contamination.[6] To improve the water supply to Vakola, a

      12.24 km long tunnel between Maroshi and Ruparel College was excavated by Tunnel boring machine (Fig. 4) from Maroshi vent hole to Vakola vent hole where vertical shafts were constructed at either end. The inlet shafts of 82.0 m and

      68.0 m in depth from ground level, 9.0 m in diameter [7]. The study establishes a relationship between rock mass characteristics, UCS of the Deccan trap rocks and TBM performance shown in Table 2.

      Fig 4. Longitudinal section and plan of tunnel from Maroshi to Ruparel College [7]

      Studies indicate that in Deccan traps, variations in rock types, flow contacts, rock strength, and volumetric joint amount with presence of weak zones have predominantly affected the penetration rate and stability of tunnels [3]. It had been well recognized that joints or fractures have an important effect on the machine performance. On the basis of a large number of case studies, it concluded that with the decrease of joint spacing, the TBM penetration increases distinctly [8]-[10]. The maximum penetration rate was recorded for an angle of 60°. It was also noted that with the increase of joint spacing, the effect of joint orientation decreases.

      TABLE 2. TBM PERFORMANCE IN MAROSHIVENT HOLE AND

      VAKOLAVENT HOLE TUNNELS. [7]

      Tunnels

      Tunnel boring length (m)

      Shape

      Excavate d diameter (bore section) (m)

      Finish ed diame ter (m)

      Excavat ion quantity (m3/m)

      Volume (totalexc avation) (m3)

      Maroshi

      vent hole

      3086.3

      4

      Circula r

      3.6

      3.0

      10.18

      31,419

      Vakola vent hole

      2590.4

      Circula r

      3.6

      3.0

      10.18

      26,370

      Studies show that the penetration rate decreases with increase in uniaxial compressive strength. The comparison of measured penetration rate with empirical model developed by Graham, in which, the penetration rate is computed using this and average thrust per cutter, showed good agreement with coefficient of determination [11,12]. The study shows that the TBM performance was maximum in rock mass rating (RMR) range from 40 to 75, while slower penetration was recorded both in very poor and very good rock masses. It is well known that Deccan volcanic cover a vast area of nearly 500,000 km2 of the Indian subcontinent and attain a thickness of 1.6 km above. It was widely jointed and provided stable ground condition for tunneling. Due to its structural and textural variation, the UCS of the intact basalts varied from

      33.35 MPa to 143.33 MPa and the rock mass fall under fair to

      good rock mass categories [7]. The rock breakage process is closely related to the machine parameters, such as TBM diameter, cutter line spacing, cutter diameter, tip width, maximum RPM, total thrust and torque. The boring time cycle details with respect to international norms are given in Fig. 5. The degree of compaction and grain size also vary in top, middle and bottom portions of each flow, due to these there is no linear correlation found between RMR and TBM penetration rates.

      Figure 5: Boring time cycle details with respect to international norms [15]

    2. Large Tunnel Excavation with TBM under-passing two highway Tunnels

      It deals with the performance of Tunnel Boring Machine (TBM) opted for the construction of the Interstate Raw Water Transfer (ISRWT) project currently constructed in Selangor- Pahang, Malaysia. In this project, the 44 km Interstate Raw Water Transfer tunnel is designed to cross solid rock along the alignment with the overburden at various points. Considering the geological condition of the proposed alignment such the hard rock of Titiwangsa Main Range Granite, open type TBM was selected [13]. The evaluation on the performance of TBM is based on parameters such as boring energy, rate of penetration (ROP) and rate per minute (RPM). Three different data from tunnel site has been reported in literature, the daily tunnel mapping record, the TBM performance data and lab test results of Uniaxial Compressive Strength (UCS) on rock samples at every 50 m of the tunnel. The daily mapping recorded the strength of intact rock, joints properties and groundwater condition. The UCS/SHR value was derived from the Schmidt Hammer Rebound (SHR) test while UCS rock core was obtained fro testing fresh rock of every 10 m cut-off in a non- discontinuity area. Three block samples (A, B & C) from the high groundwater inflow area were tested for UCS (Dry & Wet). Table 3 displays the results of Uniaxial Strength Test for dry and wet specimen respectively.

      The two tests showed a satisfactory correlation as the rebound hardness values decreased with the decreasing value

      of UCS. It shows that the strength of rock decreased or becoming less, more than 50% from its dry value when it is wet. Few difficult excavations by the TBM were envisaged due to the existence of fault zones, high overburden and potential risk of crossing water bearing zones. In one of the locations 10 ton/min of sudden inrush warm water was experience where TBM recorded 46.50 N/mm2 of boring energy, 7.10 rev/min of RPM and 0.80 m/h of ROP. Due to these reasons slight drop of boring energy and daily progress was recorded. It was noted from reports that at specific locations high grade rock required high type of support system because the presence of sheared zone of fresh rock [14]. Boring energy was found low due to the presence of favorable fracture orientation. At some places water ingress was very high at more than 300 litre/min which weakened the rock into smaller pieces and caused higher excavation progress per day.

      TABLE 3. UCS RESULT FOR DRY AND WET ROCK SPECIMENS

      Dry / Wet

      Specimens

      UCS (MPa),

      Young's Modulus

      Dry

      AD1

      176.048

      56.875

      Wet

      AW8

      69.761

      31.674

      Dry

      BD1

      132.129

      56.525

      Wet

      BW5

      52.354

      62.272

      Dry

      CD1

      246.981

      82.106

      Wet

      CW3

      123.566

      52.431

  4. CONCLUSION

The invention of the tunneling machine has revolutionized tunneling history indeed it had revolutionized the creation of spaces under our cities allowing metro systems, water and sewage systems, and underground cable networks, all to be built in a safe and sustainable manner. The influence of joint orientation on TBM penetration rate was widely observed. While ensuring tunneling safety, an average penetration rate of 2.10 m/h and a maximum monthly progress of 542.6 m was noted in the case studies. These types of machines have the advantages of limiting the disturbance to the surrounding ground and producing a smooth tunnel wall. This significantly reduces the cost and makes it suitable for heavily urbanized areas. The major disadvantage is the difficulties to transport and the upfront cost which reduces as the tunnel gets longer. The study provided better understanding of using TBM for tunneling projects for hydropower, sewerage, water supply, irrigation and transportation in various geological scenarios.

REFERENCES

    1. B. Singh, R.K. Goel, Chapter 14 – Rock Mass Quality for Open Tunnel Boring Machines, Engineering Rock Mass Classification, Butterworth-Heinemann, pp. 185-191, 2011.

    2. J. Li, Key Technologies and Applications of the Design and Manufacturing of Non-Circular TBMs, Engineering 3, pp. 905 914, 2017

    3. P. Jaina, A. K. Naithania, T.N. Singh, Performance characteristics of tunnel boring machine in basalt and pyroclasticrocks of Deccan traps A case study, Journal of Rock Mechanics and Geotechnical Engineering 6, pp. 3647, 2014.

    4. Herrenknecht, Excavation Tools, herrenknecht.com, [Online]. Retrieved from

      https://www.herrenknecht.com/en/products/productdetail/excavati on-tools/

    5. Alena Conrads, Markus Scheffer, Markus Konig, Markus Thewes, Robustness evaluation of cutting tool maintenance planning for soft ground tunneling projects, Underground Space 3, pp. 7285, 2018

    6. Jain et al., 2011. Application of tunnel boring machine for the construction of MaroshiRuparel College TunnelMumbai, India. Journal of Engineering Geology 37(14): pp.151159, 2011.

    7. A. Bruland, Hard rock tunnel boring, PhD Thesis, Trondheim: Norwegian University of Science and Technology; 1998.

    8. Zhaohuang Zhang, Muhammad Aqeel, Cong Li, Fei Sun, Theoretical prediction of wear of disc cutters in tunnel boring machine and its application, Journal of Rock Mechanics and Geotechnical Engineering 11, pp. 111-120, 2019.

    9. QM Gong, J. Zhao, Influence of rock brittleness on TBM penetration rate in Singapore granite. Tunnelling and Underground Space Technology 22(3), pp. 31724, 2007.

    10. JK Hamidi, K. Shahriar, B. Rezai, J Rostami, Performance prediction of hard rock TBM using Rock Mass Rating (RMR) system. Tunnelling and Underground Space Technology 25(4), pp. 33345, 2010.

    11. N. Barton, R. Lien and J. Lunde, Engineering classification of rock masses for the design of tunnel support. Rock Mechanics 6(4), pp.189236, 1974.

    12. P. C. Graham, Rock exploration for machine manufacturers. In: Bieniawski ZT, editor. Exploration for rock engineering. Johannesburg: A.A. Balkema, pp.17380, 1976.

    13. A. Rahim, H. Zabidi, M. Trisugiwo & A. G. M. Rafek, Parametric Performance Study of Tunnel Boring Machine (TBM) In the Titiwangsa Main Range Granite, Malaysia, 5th International Conference on Recent Advances in Materials, Minerals and Environment (RAMM) & 2nd International Postgraduate Conference on Materials, Mineral and Polymer (MAMIP), 4-6 August, 2015.

    14. P.P Nelson, TBM performance analysis with reference to rock properties. In: Hudson, J.A. (Ed.), Comprehensive Rock Engineering, Excavation, support and monitoring, vol. 4. Oxford, Pergamon Press; pp.261291, 1993.

Leave a Reply