Reducing the Throughput Time by Value Stream Mapping in a Tyre Manufacturing Industry

DOI : 10.17577/IJERTV3IS110267

Download Full-Text PDF Cite this Publication

Text Only Version

Reducing the Throughput Time by Value Stream Mapping in a Tyre Manufacturing Industry

Josna Jos Jacob

PG Scholar, Mechanical Department SSET, Karukutty Ernakulam, India

Jenson Joseph E

Assistant Professor, Mechanical Department SSET, Karukutty

Ernakulam, India

Abstract This study is carried out in a tyre manufacturing industry. Attempt is done to study the throughput time using Value stream mapping (VSM). The current state map is plotted considering the material flow, information flow and cycle times, and thereby creates an improvised future state of value stream wherein the value addition is enhanced.

Keywords Current state VSM; future state VSM; Non-Value added processes; throughput time; Value added processes.

  1. INTRODUCTION

    The objective of this study was to chart the various processes in a tyre manufacturing industry and then categorize them under the various tools of value stream map like value contribution scale and directions of material/information flow, and thereby create an improvised future state of value stream wherein the value addition is enhanced. The ineffective usage of the machines available reduced the output thereby increasing the cycle time of processes.

  2. LITERATURE SURVEY

    Value Stream Mapping has its roots in lean manufacturing- a set of principles used to enable the manufacture of goods with fewer resources. Lean manufacturing is the relentless elimination of waste and Value stream mapping is a visual tool to improve a process by identifying value added and eliminating waste. It is especially powerful for illustrating the wastes of Overproduction, Idle Material & Transportation. The Lean transformation should provide growth with improved margins, minimal capital and without more employees. Many organizations pursuing lean conversions have realized that improvement events alone are not enough since they create localized improvements, while Value Stream Mapping strengthens the gains by providing vision and plans that connect all improvement activities.

    A Value Stream is the entire set of activities running from raw material to finished product for a specific product or product family. In a typical enterprise, value streams can intersect with other value streams, branch apart or Y together.Whenever there is a product (or service) for a customer, there is a value stream. The challenge lies in seeing it.

  3. PROBLEM DEFINITION

    The main problem faced by the company is that the 6 billion sales mark is not attainable under the present situations.

    The main problems which hinder to achieve this goal are: Value added and non-value added processes accounts to it.

    By this project, it is intended to cover the following major tasks:

    • Both Current & Future state VSM.

    • Viable improvements.

    • Enhancement of Value addition to the product.

    • Thorough analysis of the process Throughput time.

  4. DATA COLLECTION

    This study is based on the value stream mapping of current state and plotting the future state map and comparing the throughput time, and optimizing the finished goods handling costs.

    The data regarding material flow, information flow was collected. Plant layout was studied and a process flow diagram (PFD) was developed.

    A. Data box details

    The data box is a VSM tool used in the chart to address the data input corresponding to each process. The subheadings under each will be as follows:

    DATA BOX

    Process

    Utilization(%) on

    Man Power/

    No. of Shifts

    Setup time/shift

    Time Available

    Cycle time

    O/p per shift

    Fig. 1 Data Box

    Utilization of each process capacity according to the scheduled hrs and the available hrs is calculated in order to get a brief understanding about the work stage efficiency of the plant.

    TABLE I

    EQUIP MENT

    Hours

    Un-Utilised Hours

    Sche dule d

    Ope rate d

    %

    Utilis ation

    %

    Bre ak

    %

    Materi al

    %

    Manp ower

    %

    Oth ers

    Banbur

    648.0

    582.

    0.98

    0.00

    2.66

    6.52

    Banbur

    648.0

    538.

    5.57

    0.15

    4.94

    6.19

    Banbur

    648.0

    473.

    2.15

    0.11

    18.52

    6.15

    Banbur

    648.0

    315.

    3.20

    0.00

    41.98

    6.12

    Dual -1

    648.0

    416.

    1.11

    10.15

    16.96

    7.52

    Dual – 2

    640.0

    446.

    2.02

    10.45

    14.49

    3.30

    Calende

    632.0

    437.

    0.25

    1.33

    22.32

    6.81

    New

    416.0

    292.

    5.56

    13.88

    4.47

    5.71

    Two

    608.0

    411.

    1.19

    20.24

    10.63

    0.25

    Three

    632.0

    62.

    1.62

    15.15

    9.80

    0.19

    Horizon

    2893.

    2524

    1.62

    9.18

    0.37

    1.58

    Vertical

    632.0

    570.

    0.46

    9.24

    0.00

    0.00

    Bead

    1344.

    1268

    0.61

    0.09

    0.40

    4.54

    Bead

    3856.

    3842

    0.22

    0.10

    0.03

    0.00

    Bead

    5264.

    5156

    0.58

    1.21

    0.08

    0.17

    Slitter

    960.1

    960.

    0.00

    0.00

    0.00

    0.00

    Truck

    2980

    1839

    2.32

    7.20

    13.56

    R T

    5832.

    2673

    1.20

    7.30

    19.26

    Pass.

    1036

    3375

    1.59

    10.48

    19.66

    Truck

    5500

    4740

    0.88

    6.38

    0.03

    6.53

    R T

    9145.

    7818

    1.55

    5.61

    0.00

    7.34

    Pass.

    1431

    1205

    1.23

    8.66

    0.02

    5.85

    EXCEL CALCULATION SHEET

  5. DATA ANALYSIS

    1. Current State VSM

      Current state VSM is plotted considering cycle times, material flow and information flows.

      Fig. 2 Current state VSM

    2. Recommendations

      • Increase the line speed of fabric Calendaring machine.

      • Modify the 2-rolled Squeege calendaring machine to 3-rolled Squeege calendaring machine.

      • The cycle time will be reduced by more than 50%.

      • Modify the tyre building machine to turret type tyre building machine.

    3. Future state VSM

    Future state VSM is plotted taking into consideration all the recommendations.

    The VSM is analysed and the data after refining is shown in a yellow shade. This contributes to the enhancement of the Value Adding activities. Thus, by this VSM project the following were analysed: Utilization Factor, Throughput Time.

    Fig. 3 Future state VSM

  6. RESULTS AND DISCUSSIONS

    Fig. 4 shows Current state vs. Future state

    1. The Contribution of the process in Value Stream can be understood from the following graph: Fig 4.

    2. Comparison of current and future state value stream mapping was done.

      TABLE II

      COMPARISON OF CURRENT AND FUTURE STATE MAPPING

      VA

      NVA

      Total

      Current state

      2hrs 58mins

      14hrs 39mins

      17hrs 37mins

      Future state

      2hrs 23mins

      14hrs 28mins

      16hrs 15mins

    3. The various factors that affected the throughput time were studied through VSM and necessary recommendations were suggested to improve the throughput time.

  7. CONCLUSIONS

Value Stream Mapping is an effective tool to eliminate the wastes and it also suggests ways to reduce non-value added times in a manufacturing process. Value stream mapping is a recognized method used as part of Six Sigma methodologies. It is often used in Lean environments to analyse and design flows at the system level (across multiple processes). Although value stream mapping is often associated with manufacturing, it is also used in logistics, supply chain, service related industries, healthcare, software development, product development, and administrative and office processes.

As a conclusion to this study, I would like to make the following recommendations:

  • Value Stream Map provides a future state to be attained by the plant. The enhancement as in the next future stage has to be kept on plotted and the Value Stream has to be kept tracked. It provides a basic understanding of all the processes throughout the plant for all the staff and the decision making management. It gives a ones sight view of all the process and helps in finding the inefficient and the most efficient process at the plant

  • The layout of the plant has to be so arranged in accordance with both the Value Stream activities and the plant efficacy.

ACKNOWLEDGMENT

The satisfaction of having achieved the successful completion of a work would simply be incomplete if the words of gratitude to the great minds that helped in its attainment are not expressed. My thesis guide Mr. Jenson Joseph E, Asst.Professor and our M.Tech class coordinator Mr. Sijo M.T, Asst.Professor in the Department of Mechanical Engineering had been very helpful and Im grateful to them for their kind support and guidance through every stage of my work and timely advice. I also thank all our teachers in the Mechanical Engineering department and my dear classmates for their valuable support and encouragement.

REFERENCES

  1. D.T Jones, P. Hines and N. Rich ," Lean logistics," International Journal of Physical distribution & logistics Management 27(3/4), pp 153- 173, 1997.

  2. D.T. Jones From lean production to lean consumption- Chairman, Lean Enterprise Academy, UK, www.leanuk.org, 2006.

  3. Introduction to Lean Six Sigma Methods, MIT Open Course Ware, http://ocw.mit.edu

  4. K. Duggan, Creating Mixed Model Value Streams Practial Lean Techniques for Building to Demand, Productivity Press, Newyork, 2006.

  5. L.Yang-hua, H.Vanlandeghem, "An application of simulation and value stream mapping in lean manufacturing", Proceedings 2002, Dresden, Germany,pp 300-307, October 23-26,2002.

  6. M.Rother, J.Shook, Learning to see: Value stream mapping to add value and eliminate muda, The Lean Enterprise Institute Inc 2 Edition, Brookline, MA, 2001.

  7. M.Rother, R. Harris, Creating Continuous Flow: An Action Guide for Managers, Engineers and Production Associates, Version 1.0, The Lean Enterprise Institute Inc, 2001.

  8. Martins Industries. (2010). Moving with lean manufacturing. Retrieved from http://www.martinsindustries.com/industries/images/file/Martins%20In dustries%20-%20Industrial%20Products%20-%20AN.pdf

  9. Peter Hines and Nick Rich (1997), The seven value streammapping tools, Intl. Journal of Operations & Production Management, pp. 46- 64, Vol. 17, No. 1.

  10. R.Martichenko, K.Grabe Building a Lean Fulfillment Stream: Rethinking Your Supply Chain and Logistics to create Maximum Value at Minimum Total cost, The Lean Enterprise Institute, Cambridge, MA, 2010.

  11. RenuYadav, AshishShastri and MithleshRathore (2012), Increasing Productivity by Reducing Manufacturing Lead Time through Value Stream Mapping,Intl. Journal of Mechanical and Industrial Engineering, Volume-1, Issue3.

  12. Romero D. and Chávez Z. (2011), Use of Value Mapping Tools for Manufacturing Systems Redesign, Proceedings of the World Congress on Engineering, Vol. I, WCE 2011, London, U.K.

  13. V.Ramesh, K.V.SreenivasaPrasad, T.R.Srinivas, "Implementation of a lean model for carrying out Value Stream Mapping in a Manufacturing Industry", Journal of Industrial and System Engineering,Vol.2, No.3, 2007,pp. 180-196

  14. Blue Giant. (2008). Architects. Retrieved from http://www.bluegiant.com/architect/Dock_ Access.html

  15. Blue Giant. (2008). Dock System Guide. Retrieved from www.bluegiant.com/…/Loading%20Dock%20System%20Guide.pdf

Leave a Reply