Reliability Analysis of Composite Power System using FACTS Controllers – Combination of TCSC & UPFC

DOI : 10.17577/IJERTV1IS5073

Download Full-Text PDF Cite this Publication

Text Only Version

Reliability Analysis of Composite Power System using FACTS Controllers – Combination of TCSC & UPFC

T. Suresh Kumar$ and V. Sankar@

$Member IEEE, Associate Professor, EEE Dept., Vishnu Institute of Technology, Bhimavaram, India,

@ Senior Member IEEE, Professor, EE Dept., JNTUACE, Anantapur, India,

Abstract

FACTS technologies can have major positive impacts on power system reliability performance and the actual benefits obtained can be assessed using suitable models and practice. Emerging techniques for composite power system reliability evaluation mainly focus on conventional generation and transmission facilities. In this paper, the impact of FACTS controllers on Composite Power System Reliability on IEEE 24 Bus Reliability Test System (RTS) is examined by incorporating the controller devices. A novel approach of composite power system has been presented by incorporating FACTS controllers in the RTS system in all the transmission lines for determining the system reliability. In this paper, an attempt is made to study the impact of Thyristor Controlled Series Capacitor (TCSC) & Unified Power Flow Controller (UPFC) combination on composite power system by using state space enumeration techniques. In order to improve system performance the impact of the combination of TCSC & UPFC has been considered. Investigation results show a significant improvement in the Load point, system indices, probability of failure & Expected Energy Not Supplied (EENS) in all transmission lines & generation capacity.

  1. Introduction

    Flexible AC Transmission System (FACTS) technology is the ultimate tool for getting the most out of existing equipment via faster control action and new capabilities. The most striking feature is the ability to directly control transmission line flows by structurally changing parameters of the fast switching.

    Unified Power Flow Controllers (UPFC) and Thyristor Controlled Series Capacitor (TCSC) [1-3] are the most versatile FACTS [2] devices that has emerged for the control and optimization of power flow in electrical power transmission systems [4-5]. They offer major potential advantages for static and dynamic operation [6-8] of transmission lines.

    In this paper, the impact of the combination of UPFC & TCSC on composite electric power system reliability is examined. Load point & system indices [9- 11] performances are presented to examine the impact of the combination on the IEEE 24 Bus RTS.

  2. Reliability Analysis of UPFC & TCSC

    The Single diagram of IEEE 24 Bus Reliability Test System (RTS) is shown in Fig. 1.

    Fig 1: Single Line diagram of IEEE 24 Bus Reliability Test System

    Average load at the buses is 235.87MW. Depending on the with stand capacity, repair rate and failure rate, it is feasible to have the combination of 3 module UPFC & 3 module TCSC in all the transmission line except in 1 to 2, 1 to 4, 1 to 5, 2 to 2, 2 to 4, 2 to 5, 3 to 2, 3 to 4 and 3 to 5 lines. In these lines the maximum power transmitted is only 97 MW throughout the year. Based on the above criteria, only 1 module TCSC & 1 module

    UPFC are incorporated in the above 9 transmission line with 20 % increase in their individual capacities.

    Stage 1: 3 Modules TCSC 3 * 40MW 120MW 3 Modules UPFC 3 * 40MW 120MW

    Total 240MW Stage 2: with 20% increase in the individual

    capacity of TCSC & UPFC (for 1 to 2, 1 to 4, 1 to 5, 2

    to 2, 2 to 4, 2 to 5, 3 to 2, 3 to 4 and 3 to 5 transmission lines only)

    1 Module TCSC 1 * 48MW 48MW

    1 Module UPFC 1 * 48MW 48MW

    Total 96MW Stage 1 and Stage 2 are incorporated in the 24 Bus

    System independent of the load demand. The reliability analysis is carried out by incorporating Stage 1 and 2 simultaneously in the system. Availability and unavailability of the two stages are calculated by State Space representation.

    2.1 RLD using State Space representation

    Stage 1

    The Reliability Logic Diagram (RLD) of IEEE 24 Bus RTS for the combination of TCSC & UPFC with 3 modules each using state space representation is shown in Fig. 2.

    Fig. 2: RLD for Combination of TCSC & UPFC (Stage 1) using State Space Representation

    Results

    From the above, the Limiting State Probabilities [5] can be obtained.

    Consider the data:

    Failure rate ( ) = 0.7 f/yr

    Repair Rate ( ) = 150 hrs of each component, Individual LSPs are:

    P1 = 0.97642 P2 = 0.012402 P3 = 0.00025

    P4 =1.3548*10-3 P5 = 2.709*10-4 P6 = 5.4194*10-5 P7 = 3.847*10-7 P8 =4.6684*10-8 P9 = 6.7134*10-9 P10 = 0.008524 P11 = 0.008524 P12=8.3216*10-12 PUP=P1 + P10 + P11 = 0.97642 + 0.008524 + 0.008524

    = 0.985666

    PDOWN = 1 PUP = 0.014334

    Stage 2

    The state space representation for stage 2 of combination of TCSC and UPFC is shown in Fig. 3. In Fig. 3, the blocks 1 to 7 represent transition states. The upper transition rates are of UPFC and lower transitional rates are of TCSC. Here, 4 states are considered because the remaining states will represent the failed states as they cannot withstand rated capacity. Stage 2: (for 1 to 2, 1 to 4, 1 to 5, 2 to 2, 2 to 4, 2 to 5,

    3 to 2, 3 to 4 and 3 to 5 transmission lines only)

    Fig. 3: RLD for Combination of TCSC & UPFC (Stage 2) using State Space Representation

    Results

    Considering the data of and as given above Individual LSPs are:

    P1 = 0.979347 P2 = 0.005871 P3 = 0.001405

    P4 = 0.000932 P5 = 0.005989 P6 = 0.005989

    P7 = 0.000467

    PUP=P1 +P5 + P6 = 0.979347 + 0.003946 + 0.003946

    = 0.991325

    PDOWN = 1 PUP = 0.008675

    In Table 1, the results of availability and unavailability of IEEE 24 bus RTS for stage 1 & stage 2 are presented.

    Table 1: Availability & Unavailability of different Stages

    Stage

    Modules

    Availability

    Unavailability

    TCSC

    UPFC

    1

    3

    3

    0.985666

    0.014334

    2

    1

    1

    0.9991325

    0.008675

    From Table 1, it can be observed that as the no. of stages increase, the availability will decrease although it satisfies the required performance

  3. System Indices

    System Indices like BPSD, BPII & BPECI [1-3, 5] are calculated for IEEE 24 bus RTS system by incorporating the combination of FACTS devices.

    Bulk Power Supply average curtailment / disturbance (BPSD),

    locations, the system indices are gradually reduced when compared with other components.

    System Indices (BPSD, BPII and BPECI) are further calculated [4] at each bus as shown in Tables 3 to 5. The graphical forms of the Tables 3 to 5 are shown in Figs. 4 to 6.

    tr>

    Bus No.

    BPSD

    Original

    TCSC

    UPFC

    UPFC & TCSC

    1

    817.22

    784.56

    780.19

    732.128

    2

    817.22

    784.56

    780.19

    732.128

    3

    817.22

    784.56

    777.18

    729.118

    4

    817.22

    784.56

    780.09

    732.028

    5

    817.22

    784.56

    780.19

    732.128

    6

    817.22

    784.56

    780.19

    732.128

    7

    816.45

    783.79

    779.42

    731.358

    8

    817.22

    784.56

    780.19

    732.128

    9

    817.22

    784.56

    778.24

    730.178

    10

    817.22

    784.56

    780.19

    732.128

    11

    817.22

    784.56

    780.19

    732.128

    12

    817.22

    784.56

    780.01

    731.948

    13

    817.22

    783.91

    779.54

    731.478

    14

    817.22

    784.56

    780.19

    732.128

    15

    817.22

    784.56

    780.19

    732.128

    16

    817.22

    784.56

    780.19

    732.128

    17

    817.22

    784.56

    779.12

    731.058

    18

    817.22

    784.56

    780.19

    732.128

    19

    817.22

    784.56

    780.19

    732.128

    20

    817.22

    784.56

    780.19

    732.128

    21

    817.22

    784.56

    780.19

    732.128

    22

    817.22

    784.56

    780.19

    732.128

    23

    817.22

    784.56

    776.92

    728.858

    24

    817.22

    784.56

    780.19

    732.128

    Table 3: BPSD at each Bus with different FACTS

    BPSD =

    k j x,y

    L kjFj

    Fj

    (1)

    j x,y

    = 2688.33* 0.98912

    3.632

    732.18 MW/disturbance

    Bulk Power Interruption Index (BPII),

    Lkj Fj

    = k j x , y

    Ls

    (2)

    = 5939.609* 0.98912

    3405

    1.7254MW / MW-yr

    Bulk Power Energy Curtailment Index (BPECI),

    = K j x,y LKj DKj Fj * 60 Ls

    (3)

    = 60* 4313.9695* 0.986451* 25.47 =1909.94

    3405

    MWh/MW-yr

    The system indices for IEEE 24 Bus RTS are presented in Table 2.

    System Indices

    Original

    TCSC

    UPFC

    TCSC

    & UPFC

    BPSD

    817.22

    784.56

    780.19

    732.128

    BPII

    2.620

    2.0156

    1.9987

    1.7254

    BPECI

    2211.640

    1987.41

    1924.65

    1909.94

    Table 2: System Indices with different FACTS Components

    From Table 2, it can be observed that the system indices viz. BPSD, BPII & BPECI are reducing when using FACTS controllers in the system (IEEE 24 bus). It can be noted that when the combination of TCSC & UPFC [1] is incorporated in the system at different

    Fig. 4: BPSD at each Bus with different FACTS Components

    From Table 3, it can be observed that, Bulk Power Supply Disturbance is decreasing when the

    combination of TCSC & UPFC is incorporated into the system rather than the system when incorporated by TCSC, UPFC independently. From the graphical form in Fig. 4 it can be clearly seen that there is a reduction in BPSD.

    Table 4: BPII at each Bus with different FACTS

    Bus No.

    BPII

    Original

    TCSC

    UPFC

    UPFC & TCSC

    1

    2.62

    2.0156

    1.9987

    1.7254

    2

    2.62

    2.0156

    1.9987

    1.7254

    3

    2.62

    2.0001

    1.9832

    1.7099

    4

    2.62

    2.0156

    1.9987

    1.7254

    5

    2.62

    2.0156

    1.9987

    1.7254

    6

    2.62

    2.0156

    1.9987

    1.7254

    7

    2.611

    2.0066

    1.9734

    1.7001

    8

    2.62

    2.0156

    1.9987

    1.7254

    9

    2.62

    2.0156

    1.9987

    1.7254

    10

    2.62

    2.0156

    1.9987

    1.7254

    11

    2.62

    2.0156

    1.9987

    1.7254

    12

    2.62

    2.0156

    1.9987

    1.7254

    13

    2.62

    2.0072

    1.9903

    1.717

    14

    2.62

    2.0002

    1.9833

    1.717

    15

    2.62

    2.0072

    1.9903

    1.717

    16

    2.62

    2.0156

    1.9987

    1.7254

    17

    2.62

    2.0156

    1.9987

    1.7254

    18

    2.62

    2.0156

    1.9987

    1.7254

    19

    2.62

    2.0156

    1.9987

    1.7254

    20

    2.62

    2.0156

    1.9987

    1.7254

    21

    2.62

    2.0156

    1.9987

    1.7254

    22

    2.62

    2.0156

    1.9987

    1.7254

    23

    2.62

    2.0156

    1.9753

    1.702

    24

    2.62

    2.0156

    1.9987

    1.7254

    Fig. 5: BPII of IEEE 24 Bus at each Bus with different FACTS Components

    From Table 4, it can be observed that, Bulk Power Interruption Index is decreasing when the combination of TCSC & UPFC is incorporated into the system

    rather than the system when incorporated by TCSC, UPFC independently. Once the Interruption Index is decreasing obviously the system performance increases. The graphical form in Fig. 5 shows clearly the reduction in BPII.

    Table 5: BPECI at each Bus with different FACTS

    Bus No.

    BPECI

    Original

    TCSC

    UPFC

    UPFC & TCSC

    1

    2211.64

    1987.41

    1922.78

    1908.07

    2

    2211.64

    1987.41

    1924.65

    1909.94

    3

    2211.04

    1985.67

    1922.91

    1908.2

    4

    2211.64

    1987.41

    1923.91

    1909.2

    5

    2211.64

    1987.41

    1924.65

    1909.94

    6

    2211.64

    1986.22

    1923.46

    1908.75

    7

    2205.82

    1979.24

    1916.48

    1901.77

    8

    2211.64

    1987.41

    1924.65

    1909.94

    9

    2211.64

    1987.41

    1918.44

    1903.73

    10

    2211.64

    1987.41

    1924.65

    1909.94

    11

    2211.39

    1987.16

    1924.4

    1909.69

    12

    2211.64

    1985.91

    1923.15

    1908.44

    13

    2211.64

    1987.41

    1924.65

    1909.94

    14

    2207.87

    1983.64

    1920.88

    1906.17

    15

    2211.64

    1987.41

    1924.65

    1909.94

    16

    2211.64

    1987.41

    1924.65

    1909.94

    17

    2211.64

    1987.41

    1924.65

    1909.94

    18

    2211.64

    1986.22

    1923.46

    1908.75

    19

    2211.64

    1986.22

    1923.46

    1908.75

    20

    2211.64

    1986.22

    1923.46

    1908.75

    21

    2210.32

    1986.22

    1910.11

    1895.4

    22

    2211.64

    1986.22

    1923.46

    1908.75

    23

    2211.64

    1986.22

    1912.33

    1897.62

    24

    2211.64

    1986.22

    1923.46

    1908.75

    Fig. 6: BPECI of IEEE 24 Bus at each Bus with different FACTS Components

    From Table 5, it can be observed that, Bulk Power Energy Curtailment Index is decreasing when the combination of TCSC & UPFC is incorporated into the system rather than the system when incorporated by

    TCSC, UPFC independently. Once the Curtailment Index decreases obviously the system performance increases. The graphical form in Fig. 6 shows clearly the reduction in BPECI.

  4. Probability of Failure & EENS

    Probability of Failure = QK

    Pj * Pkj

    j

    (4)

    Where Pj = Probability of existence of outage j

    Pkj = Probability of the load at bus K exceeding the maximum load that can be supplied at that bus during the outage j.

    Fig. 7: Probability of Failure at different bus

    EENS=

    Lkj * Pj *8760(MWh)

    j

    (5)

    From Table 6, it can be observed that, Probability of

    Further, Probability of Failure & EENS of the system is also calculated at each bus which is presented in Tables 6 & 7 and graphically in Figs. 7 & 8 respectively.

    Bus No.

    Probability of Failure

    Original

    TCSC

    UPFC

    UPFC & TCSC

    1

    0.0752745

    0.0751432

    0.0749987

    0.0741948

    2

    0.0752745

    0.0751432

    0.0749987

    0.0741948

    3

    0.0752745

    0.0751338

    0.0749587

    0.0741348

    4

    0.0752746

    0.0751432

    0.0747987

    0.0741948

    5

    0.0752746

    0.0751534

    0.0749987

    0.0741958

    6

    0.0752749

    0.0751432

    0.0749987

    0.0741548

    7

    0.0752211

    0.0750012

    0.0747641

    0.0740012

    8

    0.0752745

    0.0751432

    0.0749957

    0.0741948

    9

    0.0752745

    0.0751232

    0.0747987

    0.0741978

    10

    0.0752745

    0.0751402

    0.0749987

    0.0741248

    11

    0.0752745

    0.0751432

    0.0749977

    0.0741948

    12

    0.0752745

    0.0751132

    0.0747985

    0.0741948

    13

    0.0752745

    0.0751432

    0.0749987

    0.0741941

    14

    0.0752746

    0.0751302

    0.0748947

    0.0741949

    15

    0.0752745

    0.0751432

    0.0749981

    0.0741748

    16

    0.0752745

    0.0751487

    0.0749987

    0.0741948

    17

    0.0752745

    0.0751432

    0.0748967

    0.0741942

    18

    0.0752745

    0.0751432

    0.0749987

    0.0741448

    19

    0.0752745

    0.0751439

    0.0749981

    0.0741944

    20

    0.0752745

    0.0751432

    0.0749984

    0.0741947

    21

    0.0752745

    0.0751431

    0.0748987

    0.0741748

    22

    0.0752746

    0.0751402

    0.0749967

    0.0741949

    23

    0.0752746

    0.0751412

    0.0749787

    0.0740949

    24

    0.0752745

    0.0751432

    0.0749987

    0.0741948

    Table 6: Probability of Failure at different Buses

    Failure is decreasing when the combination of TCSC & UPFC is incorporated into the system rather than the system when incorporated by TCSC, UPFC independently. Decrease in Probability of Failure indicates increase in the availability of the system, which leads to increase in system performance. The graphical form in Fig. 7 shows clearly the decrement of Probability of Failure at each and every bus.

    Table 7: EENS at different Buses

    Bus No.

    EENS

    Original

    TCSC

    UPFC

    UPFC & TCSC

    1

    3981.03

    3802.9

    3583.68

    3382.41

    2

    3575.56

    3387.43

    3168.21

    2966.94

    3

    6635.01

    6456.88

    6237.66

    6036.39

    4

    2727.83

    2549.7

    2330.48

    2129.21

    5

    2617.23

    2439.1

    2219.88

    2018.61

    6

    5013.68

    4835.55

    4616.33

    4415.06

    7

    4605.1

    4426.97

    4207.75

    4006.48

    8

    6303.26

    6125.13

    5905.91

    5704.64

    9

    6450.7

    6272.57

    6053.35

    5852.08

    10

    7187.92

    7009.79

    6790.57

    6589.3

    11

    6781.65

    6603.52

    6384.3

    6183.03

    12

    3198.47

    3020.34

    2801.12

    2599.85

    13

    9768.18

    9590.05

    9370.83

    9169.56

    14

    7151.29

    6973.16

    6753.94

    6552.67

    15

    4684.9

    4506.77

    4287.55

    4086.28

    16

    3686.14

    3508.01

    3288.79

    3087.52

    17

    4368.59

    4190.46

    3971.24

    3769.97

    18

    4274.7

    4096.57

    3877.35

    3676.08

    19

    6671.88

    6493.75

    6274.53

    6073.26

    20

    4718.24

    4540.11

    4320.89

    4119.62

    21

    5719.24

    5541.11

    5321.89

    5120.62

    22

    3687.19

    3509.06

    3289.84

    3088.57

    23

    6781.92

    6603.79

    6384.57

    6183.3

    24

    7014.67

    6836.54

    6617.32

    6416.05

    Fig. 8: EENS at different bus

    From Table 7, it can be observed that, Expected Energy not supplied is decreasing when the combination of TCSC & UPFC is incorporated into the system rather than the system when incorporated by TCSC, UPFC independently. Decrease in EENS indicates increase in the availability of the system, which leads to increase in system performance. From the graphical form in Fig. 8 it can be seen clearly the decrement of EENS at each and every bus.

  5. Conclusions

In this paper, the reliability analysis of IEEE 24 Bus RTS when using the combination of TCSC & UPFC is presented. Depending upon the generation & transmission line capacity, the combination of TCSC & UPFC is divided into 2 stages. Stage 1, consist 3 Modules each of TCSC & UPFC, where as Stage 2, consists 1 module of TCSC & UPFC each. Reliability analysis of the two stages is determined by using state space representation. System Indices, Probability of Failure & EENS are also calculated.

In IEEE 24 bus RTS system stage 1 & 2 are incorporated simultaneously depending on the transmission line capacity connected between different buses. System Indices, Probability of Failure & EENS are calculated for all the combinations of FACTS controllers of the system and found the combination of TCSC & UPFC is found to be best suitable for the system rather than other combinations.

7. References

  1. T. Suresh Kumar, V. Sankar Composite Power System Reliability Improvement using TCSC, International Journal of Scientific and Engineering Research (IJSER), ISSN 2229-5518, Paper ID: I014691, Vol. 3, Issue 5, May 2012.

  2. T. Suresh Kumar, V. Sankar Improvement in Reliability of Composite Power System using TCSC & UPFC: A Comparison, International Journal of Electrical

    Power Engineering (ACEEE – IJEPE), ISSN 2158-7566, Paper ID: IJEPE 03 02 02, May 2012.

  3. T. Suresh Kumar, V. Sankar, Reliability Improvement of Composite Electric Power System using Unified Power Flow Controller, IEEE International Conference INDICON-2011, BITS-PILANI, Hyderabad, 16th 18th Dec 2011.

  4. Hamid R. Bay, Ahad. Kazemi, Reliability evaluation of composite electric power systems incorporating STATCOM & UPFC, IEEE Power & Energy Engineering Conference, APPEEC 2009, Asia- Pacific, 27th 31st March 2009, pp: 1-6.

  5. T. Suresh Kumar, V. Sankar, Reliability Analysis of Unified Power Flow Controllers & Series Compensator for a Transmission system, i-managers journal on Electrical Engineering Vol. 2, No. 2, Oct-Dec 2008, pp: 47-52.

  6. Ajit Kumar Verma, A. Srividya, Bimal C. Deka, Impact of a FACTS controller on reliability of composite power generation and transmission system, Elsevier, Electric Power Systems Research, Vol. 72, Issue 2, Dec. 2004, pp: 125-130.

  7. Roy Billinton, Yu Cui Reliability Evaluation of Composite Electric Power Systems Incorporating FACTS, IEEE Canadian Conference on Electrical & Computer Engineering, 2002.

  8. Roy Billinton, Mahmud Fotuhi-Firuzabad, Sherif Omar Faried, Saleh Aboresshaid Impact of Unified Power Flow Controllers on Power System Reliability, IEEE Transactions on Power System, Vol. 15, No. 1, Feb 2000, pp 410-415.

  9. M. Fotuhi-Firuzabad, R. Billinton, S. O. Faried,

    S. Aboreshaid, Power System Reliability using Unified Power Flow Controllers, IEEE, 2000, pp: 745-750.

  10. Roy Billinton, Ronald N. Allan, Reliability Evaluation of Power Systems, 2nd Edition, Plenum Press, New York, 1996. Reprinted in India, B.S. Publications 2007.

  11. Roy Billinton, Ronald N. Allan, Reliability Evaluation of Engineering Systems, Plenum Press, New York, 1994. Reprinted in India, B.S. Publications, 2007.