- Open Access
- Total Downloads : 431
- Authors : Daniel Ogheneovo Johnson
- Paper ID : IJERTV4IS090029
- Volume & Issue : Volume 04, Issue 09 (September 2015)
- Published (First Online): 14-09-2015
- ISSN (Online) : 2278-0181
- Publisher Name : IJERT
- License: This work is licensed under a Creative Commons Attribution 4.0 International License
Reliability Evaluation of 11/0.415kv Substations a Case Study of Substations in Ede Town
Daniel Ogheneovo Johnson
Department of Electrical and Electronic Engineering Federal Polytechnic,
Ede, Nigeria
Abstract – This paper presents the results of reliability evaluation of 11/0.415 substations in Ede town (Osun State, Nigeria). Accurate data on 11/0.415kV substations does not exist but there is daily record of complains of outages by customers with date, identified fault and the substations affected. From this record, outage duration, outage frequency and the number of customers affected were estimated based on the time and nature of the fault. These data were used to evaluate reliability indices of each 11/0.415kV substations. The results show that out of the 29 substations under assessment, only all customers on three (Rinsayo, INEC, Winner) substations experience significant stable power availability for months. There was improved reliability for customers on St. Anthony, Sabo and NITEL substations. For others substations, it was either there is no specifics trend of reliability performance or the power reliability was getting worse. The results also show that different customers experience different levels of reliability and availability of supply even if they are under the same feeder and/or substation.
Keywords: Availability, Feeder, Reliability, Reliability Indices, Substation
-
INTRODUCTION
Reliability is a key factor in power system design, planning and operation, particularly for substation. Substations are use for raising voltage level for transmission and stepping down for power distribution. Substation consists of power transformer, feeder pillars; switching, measurement, protection and control devices to ensure safe and efficient operation.
11/0.415kV substations are common sight on streets and perform the function of distributing and coordinating power supply to specific group of consumers in a given neighborhood. 11/0.415kV substation is the final stage of electric power distribution system in Nigeria, as the circuits leaves the substation at 240/415V to enter consumers terminals. Much of the outages at distribution level occur at this final stage [1]. Therefore, ensuring a very reliable substation at this final stage of power distribution is a very important issue.
Substations play key role in reliability of any electric power systems. At distribution level, it is use in dividing long power lines into smaller sections. This helps to reduce any interruption to the continuity of supply when a section
is not functional or faulty or during maintenance work. By knowing how to calculate the reliability of different substation configurations, an engineer can use this information to help design a system with the best overall reliability. But determining the reliability of a substation can also be important for existing installations as it can help locate weak points that may be contributing to overall system unreliability [2].
Reliability engineering has both quantitative and qualitative aspects; measurements of reliability are necessary. However measuring reliability does not make a product reliable, only by designing-in reliability, can a product achieve its reliability targets. By identifying possible causes of failure and elimination will obviously help to improve product reliability [3].
Most power outages are caused by storm and weatherrelated damage to overhead distribution power lines. Heavy winds and storm can cause trees to touch power lines, contact of two phases and sometimes can cause lines, poles to break and fall. Animal contact (snake, lizard, bird), overloading, vehicular accidents, equipment failure, and human error also contribute to cause of power outages [4]. Aging of equipment and installation; and use of substandard cables/materials are other factor affecting reliability of power distribution systems.
-
RELIABILITY DEFINITIONS Reliability is a very broad concept and multiple of definitions abound in many literatures. In Engineering, Reliability is commonly defined as the probability that an item will perform a required function without failure under stated condition for a stated period of time.
In EPRI White Paper [5], the authors pointed out that Reliability cannot be discussed apart from the objectives of the system. The goals of the power distribution system are identified as:
-
covering the territory (an aspect of adequacy),
-
having sufficient capacity for peak demand (another aspect of adequacy),
-
being able to operate under adverse conditions (security), and
-
providing a stable voltage (quality).
The definitions of reliability in the literature address some common aspects of electric power systems. These include continuity of service, meeting customer demands, and the vulnerability of the power system. Reliability concerns are often split into three categories:
Adequacy, or the capacity and energy to meet demand,
-
Customer Average Interruption Duration Index
(CAIDI). It is also a measure of time. CAIDI is the average time needed to restore service to the average customer per sustained interruption. It is given by the sum of customer interruption durations divided by the total number of customer interrupted.
which is the ability of the electric system to supply the aggregate electrical demand and energy requirements of the customers at all times, taking into account scheduled and
= Ni
Ni
= Summation of Customer-hour
(3)
reasonably expected unscheduled outages of system elements. System adequacy relates to the existence of sufficient generation, transmission and distribution facilities within the system to satisfy the customer load demand [6].
Security, or the ability to withstand disturbances, that is the ability of the electric system to withstand sudden disturbances such as electric short circuits or unanticipated
Total number of customer interrupted (4)
-
System Average Interruption Frequency Index
(SAIFI). SAIFI is a measure of numbers of times (frequency) . SAIFI is the average number of time that a consumer experiences an interruption of supply in a given period of time (day, month or year). SAIFI is dimensionless
loss of system elements; and
Quality, or acceptable frequency, voltage and harmonic characteristics
= Ni
Nt
= Total Number of customers interrupted
(5)
The North American Reliability Council [7], define Reliability as the degree of performance of the elements of the bulk electric system that results in electricity being delivered to customers within accepted standards and in the amount desired.
Reliability of power distribution system may be described or measured by outage duration, the time required to restore supply, the frequency of the outage and the numbers of customers affected as well as the magnitude of adverse effects on the electric supply.
Total number of registered customer (6)
-
Average System Availability Index (ASAI).
It is the same as System Reliability Index SRI. It is a measure of the overall reliability of the system. It represents the percentage of time during the year (8760hours) or month (720hours) or day (24hours) that the average customer has power supply.
= 100[1 ( × ) ( × ))]
N xd
-
-
RELIABILITY EVALUATION Reliability analysis is a vital tool for critical identification
ASAI = 100 1
i
>
Nt xT
(8)
of sensitive components of electric power systems that needs more attention for better improvement and at the same time to increase the system availability [8]. There are indices that are in use for measuring or evaluating reliability of power distribution system. The indices require existing data of interruption frequency, outage duration, number of affected consumers. Some of the indices are:
-
System Average Interruption Duration Index (SAIDI). It is a measure of duration. It measure
the number of minutes/hours over a period of time (day, month or year) that the average customer is without power. It is given by
Where T is the period under investigation
In this work, these four indices are use to quantify and evaluate the reliability of power substation in Ede town.
-
-
RESEARCH METHODOLOGY Reliability analysis uses either qualitative or quantitative techniques. Qualitative techniques imply that reliability assessment must depend solely upon engineering experience and judgment. Quantitative methodologies use statistical (involve data collection) approaches to reinforce engineering judgments. Quantitative techniques describe the historical performance of existing systems and utilize the historical performance to predict the effects of changing
= Ni
Nt
= Summation of Customer-hour
(1)
conditions on system performance [9]. In this research, quantitative techniques combined with theoretical methods are used to evaluate the distribution system reliability.
Where
Total number of registered customer (2)
After receiving official permission from Ibadan Electricity Distribution Company (IBEDC)
Ni is the number customer affected by the outage Nt is the total number of registered customer, and d is the duration of the outage
The following data were collected from the company:
-
Numbers of feeders (33, 11kV)
-
Numbers of 11/0.415 substations
-
Numbers of outages on each feeders
-
Duration of each outages
-
Causes of outages
-
Number of consumers on each feeder
-
Number of consumers on every circuit on each transformer/substation
-
Equipment in the reserve (transformer, feeder pillar, fuse, pole, overhead cables etc)
-
Age of distribution equipment/item
Accurate data on fault, outages, causes of outages, duration of outage exist on 33 and 11kV feeders exist. However, similar data on 415kV does not exist but there is daily record of complains of outages by customers with date, identified fault and the substations affected. A rough estimate of outage duration was gotten from the time the complain was lodged plus the average time it takes to clear fault plus five hours (assumed time it takes before customer complains). There was also timetable for everyday load shedding which the staff. Shedding of load on some substations was carried out every day. This is to safeguard the substations transformers from failure due to overloading.
The number of customers affected was deduced from numbers of metering unit on affected substation transformer. The nature of fault also determines the number of customer affected. For instance, a single phase off (single-phasing) on the secondary side of transformer will definitely affect one-third of the total customers on the substation. Similarly, a phase off on a 415V upriser circuit affects one-third of the customers on the circuit which may be one-sixth of customer on the substation if it has two circuits or around one-ninth population of customers on the substation if it has three circuits. After getting the estimated values, reliability indices like SAIDI, CAIDI, SAIFI and ASAI was use to estimate the reliability of each of 29 substations supplied by the major 11kV township feeder.
-
-
ANALYSIS AND DISCUSSION OF RESULT Table 1 gives the name of substations, the substation capacity, the stations transformer voltage ratio, the numbers of circuits (i.e. the numbers of three-phase circuit that emanate from feeder pillar), the substations customer population, and the date fault occurred. The seventh column is the numbers of customers affected by the fault, followed by estimated outage duration (in hours) of each fault and then the customer-hour on the last column, which is a summation of the product of numbers of affected customers and outage duration in hour.
Table 1: Substations and outage data for the month of March
MARCH
Substation Name
Transformer Capacity
Volt Ratio
Number of Circuits
Customer Population
Date of Fault
Number of
Affected Customers
Duration (hour)
Customer Hours
Wuraola
500KVA
11/0.415 KV
3
259
17
86
6
516
St Anthony
500KVA
11/0.415 KV
3
265
4,11
Everyday LS
2(88) +
88*31= 2904
2(6)+
14*31=446
39248
LevelCrossing
500KVA
11/0.415 KV
3
227
12,19,24
3(76) = 228
3(6)=18
1368
Poly Junction
500KVA
11/0.415 KV
3
260
14,16
2(87) = 174
8+6=14
1218
440 Adejare
500KVA
11/0.415 KV
3
208
5,14,15,24,24,26,27
6(69)+208 = 622
6(6)+8=44
4148
Alusekere
500KVA
11/0.415 KV
3
300
14,22
2(100) = 200
2(6)=12
1200
Deeper Life
500KVA
11/0.415 KV
3
230
10
77
6
462
Apaso
500KVA
11/0.415 KV
2
303
15,18,21
3(100) = 303
3(6)=18
1800
CAC
500KVA
11/0.415 KV
2
150
11,14,15,18,23,24
,25,26,27
7(50)+2(100)
=550
7(6)+2(8)=58
3700
Olukolo
500KVA
11/0.415 KV
2
220
–
–
–
–
Obada
500KVA
11/0.415 KV
2
125
14,21,27
2(63) + 125 = 188
2(6)+24=36
3756
Palace
500KVA
11/0.415 KV
3
363
9,14,19,22,25,26,30
6(121)+ 363 =
1089
6(6)+6=42
6534
Olaiya
500KVA
11/0.415 KV
3
250
12,24
2(83) = 166
2(6)=12
996
Akewula
500KVA
11/0.415KV
3
250
23, 27
2(250)= 500
6 + 24 = 30
7500
Apena
500KVA
11/0.41KV
2
249
<>– –
–
–
INEC
500KVA
11/0.415 KV
3
125
8
125
6
750
Winners
300KVA
11/0.415 KV
3
120
–
–
–
–
Adogbe
300KVA
11/0.415 KV
2
234
1
78
6
468
Sabo
300KVA
11/0.415 KV
3
210
4,5,18,19,31
Everyday LS
5(70) = 350
+70*31= 2520
5(6)=30
+14*31= 464
32480
Rinsayo
300KVA
11/0.415 KV
3
95
–
–
–
–
Sawmill
300KVA
11/0.415 KV
2
350
23
117
6
702
Agbale II
300KVA
11/0.415 KV
2
50
–
–
–
–
Ojoro
300KVA
11/0.415 KV
3
127
24
43
6
256
Agate/Asawo
300KVA
11/0.415 KV
3
244
28,31
82+244 = 326
6+6=12
1956
NITEL
300KVA
11/0.415 KV
3
256
4,11,19,22,23,25,27,30
Everyday LS
8(86) = 688
+128*31= 4656
8(6) = 48
+14*31= 482
59680
Agbale I
300KVA
11/0.415 KV
2
105
11,20,25,26
3(35) +105 = 210
3(6)+6=24
1260
ElerinJunction
200KVA
11/0.415 KV
2
135
24,24,25
Everyday LS
2(45)+ 135=225
+67*31 = 2302
2(6)+6=18
+14*31= 452
30428
Camp Young
200KVA
11/0.415 KV
4
100
17
34
6
204
Iso Isu
300KVA
11/0.415 KV
3
460
10,12,28,29
Everyday LS
3(153)+ 460 = 919
+153*31 = 5662
3(6)+8=26
+14*31= 460
72836
The last three columns are bit technical. Taking Iso-Isu substation as an example (the last row), fault occurs on 10th, 12th, 28th and 29th of the month of March. Three of the four faults affected one-third of the customer population (153) because one phase of the transformer secondary side went off.
The fourth fault affected the entire substation population. At this substation, there was everyday load shedding because the total customers load is higher than the transformer capacity. So one of the three circuits had to be switched off at peak load duration of 6pm to 8am, a period of 14 hours. At other period of the day, all the circuits are on because the transformer can conveniently accommodate the load.
From the explanation above, the total customer affected by the four outages experience at this substation for this month is (3 × 153 + 460) = 919. This is apart from those affected by load shedding which is 153 customers everyday for 31 days in the month. This gives 4743 customers. So the total customers affected by outages for the month of March is
So the total outage duration for average customer on this substation for the month of March is 158.34hours.
= Ni
Ni
= Summation of Customer-hour
Total number of customer interrupted
72836
= 12.86 hours
5662
This means that on the average, it takes 12.86hour to restore supply once there is supply. In other words, outage last for 12.86hour on the average for the month of March for customers on this substation.
= Ni
Nt
= Total Number of customers interrupted Total number of registered customer
(919 + 4743) = 5662 customers.
Still on Iso-Isu substation, each of the three outages last for average of 6hours which gives 18hours outage. The fourth
5662
460
12.31
times
outage last for 8hours. The outage duration due to shedding of load is (14hours × 31days) = 434 hours. So the total
This is the number of outages experienced by customers on
this substation.
outage duration for the months is 18 + 8 + 434 = 460 hours. For the customer-hour on the seventh column, it is
ASAI = 100 1
Ni xd
(153 × 6) + (153 × 6) + (153 × 6) + (153 × 6) +
(460 × 8) + 31(153 × 14) = 72836.
Nt xT
=
Ni
1001
72836
= 78.72%
Nt
460×744
= Summation of Customer-hour Total number of registered customer
72836
This is the percent of the time supply is available to average customer in the month.
Other substations reliability indices are similarly analysed and obtained for the month of March. This was done
SAIDI
460
=158.34hours
covering twelve month periods from March 2014 to February 2015 and the result tabulated in Table 2 to 5. The tables also show the monthly average of the reliability on the last column.
Tables 2 gives the monthly outage duration in hours for customers on each substation. Table 3 shows the average duration of each outage, i.e. the average time it took to restore supply each time there is power failure. Table 4 provides the number of times outage occurred for every month. Table 5 presents percentage availability of supply of each substation for each month.
Customers on Elerin Junction substation suffer unavailability of supply most. The customers experienced outage for 197 to 225 hours every month for the period of one year under the study. Iso Isu is another substation badly affected with average of 149 hours of outage every month. This was due to shedding of load experienced at these two substations. Sabo and St. Anthony substations also experienced shedding of load from March to August; and NITEL substation from March to October.
Rinsayo is the substation that enjoys regular supply most. For the first 11 months, the customers on the substation did not experience any outage. Winners, INEC, Apena, Agbale II, Adogbe, Apena and Poly Junction are among the substations with better availability of supply.
Customers on Rinsayo substation had no outage until February and it took 6hours to restore supply which translate to 30minute monthly average for the whole year. The station had the highest percentage availability.
It should be noted that though the table 2 to 5 give the reliability performance of the substations fed by 11kV township feeder, it is not however, the true everyday reality of the substation. This is because happenings at generation, transmission, at 33 and 11kV feeders further impact reliability of power at the substations. While the reliability evaluation of the entire power system is an important requirement in overall power system planning and operation, it is not usually onducted on a complete power system due to its complexity [6]. Rather, the reliability evaluation of each subsystem is usually conducted independently. This kind of analysis generally assumes that the other parts of the system are fully reliable and capable of performing their intended functions [10].
-
CONCLUSION AND RECOMMENDATION
The information presented in this paper is reflection of the 11/0.415 kV substations reliability at Ede town, covering a period from March 2014 to February 2015. The findings will also provide IBEDC the state of reliability of each substation; this should facilitate proper monitoring, maintenance and upgrade of substations.
While more substations should be planned for, in the meantime, the IBEDC can divert some load on substations subjected to power rotation (due to outage during peak periods) to nearby substations that can accommodate such load.
A proper detail data and record of each substation should be kept by utility company in respect to outage duration, outage frequency as well as record of component/equipment failure. The author had serious challenges in getting these data during the course of this research simply because it is not being kept.
A standard way of reporting fault and outages at the consumers end should be devised rather than the method of individual customer coming to utility office to complain. This method will never give accurate time the fault or the outage occurs. The electric service provider should employ modern and better technology (intelligent monitoring device) to achieve this [11].
Equipment and materials needed for maintenance should readily be available. Electric poles, fuse, jumper wires, distribution cables, cross-arm and others materials should be available in store. It is good for at least two or three spare transformers to be available at every business district. A situation where the community has to provide these when needed prolong down time which affect reliability
Immediate response by technical staff to clear fault is highly recommended as this will significantly reduce down time. It is also important to adequately remunerate electricity staff, particularly those in
technical department of repairs and maintenance. Their condition of service should be improved. Good compensation in case of any hazard should be ensured.
ACKNOWLEDGEMENT
The author is grateful to the Management and Staff of Ibadan Electricity Distribution Company IBEDC, Ede, for their cooperation in providing record of complains and technical information required to carry out this research.
REFERENCES
-
H.A Boknam, S. Park, C. Shin, S. Kwon and S. Park, Power Quality Monitoring on Distribution Network using Distribution Automation System, 19th International Conference on Electricity Distribution Vienna, Paper 0426, 2007.
-
Daniel Nack, Reliability of Substation Configurations
Iowa State University, 2005
-
Warwich Manufacturing. Introduction to Reliability Engineering. University of Warwich 2007
-
US Department of Energy, Electricity Delivery and Energy Reliability. Smart Grid Investment Programme 2012 www.smartgrid.gov accessed on 4 March 2015
-
Electric Power Research Institutes White Paper (EPRI) Reliability of Electric Utility Distribution Systems, Palo Alto, CA: 1000424. 2000
-
Popoola J., Ponnle A.., Ale T. Reliability Worth Assessment of Electric Power Utility in Nigeria: Residential Customer Survey Results School of Electrical and Information Engineering, University of Witwatersrand Johannesburg, South Africa, 2011
-
North American Electric Reliability Council (NERC),Long-Term Reliability Assessment. September 2004. Available at http://www.nerc.com/~filez/rasreports.html
-
Adefarati T., Babarinde A., Oluwole S. and Oluseyi K. Reliabilty Evaluation of Ayede 330/132kV Substation, International Journal of Engineering and Innovative Technology Vol 4 Issue 4 October 2014
-
Dan Zhu Power System Reliability Analysis with Distributed Generators, MSc Thesis, Department of Electrical Engineering, Virginia Polytechnic Institute and State University, 2003
-
Y ang, F. 2007. A Comprehensive Approach for Bulk Power System Reliability Assessment. PhD Thesis, Georgia Institute of Technology, Atlanta, Georgia, USA, March, 2007 Available at:
http://etd.gatech.edu/theses/available/etd- 04012007- 205524/unrestricted/yang_fang_ 200705phd.pdf>.
-
Komolafe O.A. and Akinwumi A.O. 2014. Intelligent Monitoring of Substation to Improve Distribution Network Reliability, Department of Electronic and Electrical, Engineering, Obafemi Awolowo University, Ile- Ife, Nigeria
Table 2: Twelve Months SAIDI (outage duration hr) of all the Substations (Mar. 2014-Feb.2015)
Substation Name |
Mar. |
Apr. |
May |
June |
July |
Aug. |
Sept. |
Oct. |
Nov. |
Dec. |
Jan. |
Feb. |
Average |
Wuraola |
1.99 |
0.00 |
3.98 |
3.98 |
3.98 |
0.00 |
7.97 |
15.96 |
3.98 |
19.95 |
7.97 |
9.99 |
6.65 |
St Anthony |
148.11 |
1.39 |
150.10 |
139.47 |
146.11 |
149.49 |
0 |
0 |
0 |
0 |
3.98 |
0 |
61.55 |
Level Crossing |
6.03 |
0.00 |
8.01 |
6.19 |
4.02 |
10.32 |
8.04 |
16.04 |
20.05 |
20.04 |
34.04 |
2.05 |
11.24 |
Poly Junction |
4.68 |
2.01 |
0 |
2.01 |
0 |
0 |
1.80 |
2.01 |
0 |
6.06 |
4.02 |
0 |
1.88 |
440 Adejare |
19.94 |
1.21 |
23.94 |
14.13 |
6.06 |
7.96 |
16 |
3.98 |
7.96 |
5.77 |
18.10 |
7.66 |
11.06 |
Alusekere |
4.00 |
4.67 |
20.00 |
6.00 |
6.00 |
2.00 |
4 |
14 |
2 |
0 |
4.00 |
18 |
7.06 |
Deeper Life |
2.01 |
6.03 |
2.01 |
0 |
0 |
8.01 |
16.02 |
12.03 |
12.03 |
6.03 |
16.03 |
26. 11 |
8.86 |
Apaso |
5.94 |
4.00 |
10.00 |
6.00 |
4.00 |
12.00 |
12 |
9.01 |
0.00 |
2.00 |
2.00 |
20 |
7.25 |
CAC |
24.67 |
2.00 |
6.00 |
6.00 |
4.00 |
18.00 |
18 |
16 |
4 |
30.00 |
40.00 |
20 |
15.72 |
Olukolo |
0 |
0 |
11.98 |
2.02 |
7.99 |
8.02 |
5.97 |
0 |
0 |
3.98 |
0 |
4.01 |
3.66 |
Obada |
30.05 |
0 |
16.08 |
0 |
4.03 |
2.02 |
8.02 |
2.02 |
6.05 |
2.02 |
21.03 |
13.04 |
8.70 |
Palace |
18.00 |
0 |
4.00 |
6.05 |
6.00 |
2.00 |
22 |
2 |
6 |
2.00 |
14.00 |
4 |
7.34 |
Olaiya |
3.98 |
4.03 |
5.98 |
8.02 |
9.96 |
0 |
0 |
1.99 |
0 |
2.02 |
5.98 |
2.02 |
3.67 |
Akewula |
30.00 |
4.03 |
29.98 |
10.20 |
7.97 |
6.00 |
9.96 |
3. 98 |
3.98 |
2.02 |
19.97 |
23.97 |
12.84 |
Apena |
0 |
2.00 |
8.00 |
2.02 |
12.00 |
0 |
4 |
10 |
4 |
4.00 |
0 |
0 |
3.84 |
INEC |
6.00 |
0 |
0 |
0 |
0 |
0 |
12.05 |
8.02 |
0 |
0 |
0 |
0 |
2.17 |
Winners |
0 |
0 |
0 |
0 |
6.00 |
4.00 |
6 |
0 |
12 |
2.00 |
0 |
10 |
3.33 |
Adogbe |
2.00 |
6.00 |
0 |
0 |
0 |
2.00 |
20 |
0 |
2 |
6.00 |
0 |
22 |
5.00 |
Sabo |
154.67 |
142 |
164.67 |
144.00 |
148.67 |
146.67 |
6 |
4 |
2 |
6.00 |
6.00 |
4 |
77.39 |
Rinsayo |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
0 |
6 |
0.50 |
Sawmill |
2.01 |
0 |
4.01 |
2.01 |
86.4 |
2.01 |
1.95 |
8.01 |
2.01 |
12.03 |
2.01 |
2.01 |
10.37 |
Agbale II |
0 |
0 |
6.00 |
2.04 |
0 |
2.04 |
2.04 |
6.12 |
0 |
6.00 |
6.12 |
6 |
3.03 |
Ojoro |
2.02 |
0 |
16.25 |
2.03 |
2.03 |
3.97 |
17.92 |
7.94 |
5.95 |
7.94 |
3.97 |
5.97 |
6.34 |
Agate/Asawo |
8.02 |
8.07 |
2.02 |
0.00 |
5.98 |
0 |
2.02 |
11.98 |
1.99 |
9.96 |
9.96 |
13.99 |
6.17 |
NITEL |
233.13 |
220.08 |
219.02 |
212.02 |
222.98 |
228.95 |
219.96 |
231.11 |
210 |
4.03 |
13.98 |
3.98 |
168.27 |
Agbale I |
12.00 |
0 |
8.00 |
0.00 |
7.94 |
16.00 |
22 |
10 |
8 |
10.00 |
16.00 |
22 |
10.16 |
Elerin Junction |
225.39 |
212.44 |
225.39 |
212.44 |
221.03 |
215.39 |
208.44 |
218.61 |
211.56 |
218.61 |
218.61 |
197.45 |
215.45 |
Camp Young |
2.04 |
0 |
8.16 |
2.04 |
4.08 |
10.50 |
0 |
2.04 |
0 |
3.96 |
13.94 |
2.04 |
4.07 |
Iso Isu |
158.34 |
142.62 |
147.97 |
144.63 |
151.32 |
150.34 |
140.61 |
147.30 |
146.63 |
167.32 |
145.30 |
146.88 |
149.11 |
Table 3 Twelve Months CAIDI of all the Substations (Mar. 2014-Feb.2015)
CAIDI |
Mar. |
Apr. |
May |
June |
July |
Aug. |
Sept. |
Oct. |
Nov. |
Dec. |
Jan. |
Feb. |
Average |
Substation Name |
|||||||||||||
Wuraola |
6.00 |
14.00 |
6.00 |
6.79 |
5.93 |
13.75 |
6 |
6 |
6 |
6.67 |
6.00 |
7.5 |
7.55 |
St Anthony |
13.52 |
13.29 |
14.00 |
13.75 |
6 |
– |
0 |
– |
– |
6.00 |
– |
5.56 |
|
Level Crossing |
6.00 |
6.00 |
6.00 |
6.00 |
5.85 |
6 |
6.85 |
6.66 |
6.00 |
7.28 |
6 |
5.22 |
|
Poly Junction |
7.00 |
6.00 |
– |
6.00 |
– |
6 |
6 |
6 |
– |
6.00 |
6.00 |
– |
4.08 |
440 Adejare |
6.67 |
7.00 |
6.00 |
6.00 |
6.00 |
6 |
8 |
6 |
6 |
6.00 |
6.75 |
2.88 |
6.10 |
Alusekere |
6.00 |
6.00 |
7.50 |
6.00 |
6.00 |
6 |
4 |
7 |
6 |
– |
6.00 |
6 |
5.54 |
Deeper Life |
6.00 |
6.00 |
6.00 |
– |
– |
6 |
6 |
6.04 |
6.00 |
6.86 |
39 |
7.33 |
|
Apaso |
5.94 |
6.00 |
6.00 |
6.00 |
6.00 |
6 |
6 |
6 |
– |
5.99 |
6.00 |
6 |
5.49 |
CAC |
6.73 |
6.00 |
6.00 |
6.00 |
6 |
6 |
6 |
6 |
6.43 |
7.06 |
6.67 |
5.74 |
|
Olukolo |
7.20 |
6.00 |
6.00 |
6 |
6 |
0 |
– |
6.00 |
0.00 |
6 |
3.60 |
||
Obada |
19.98 |
6.00 |
– |
6.00 |
6 |
6 |
6 |
6.00 |
12.58 |
7.09 |
6.30 |
||
Palace |
6.00 |
6.00 |
6.00 |
6.00 |
6.00 |
7.33 |
6 |
6 |
6.00 |
7.00 |
6 |
5.69 |
|
Olaiya |
6.00 |
6.00 |
6.00 |
6.00 |
6.00 |
6 |
6 |
– |
6.00 |
6.00 |
6 |
5.00 |
|
Akewula |
15.00 |
6.00 |
10.01 |
6.00 |
5.93 |
6 |
6 |
6 |
6.00 |
6.00 |
9.01 |
81.95 |
|
Apena |
6.00 |
6.00 |
6.00 |
6 |
6 |
6 |
6.00 |
– |
– |
3.50 |
|||
INEC |
6.00 |
– |
– |
– |
6 |
6 |
6 |
– |
– |
– |
– |
2.00 |
|
Winners |
6.00 |
– |
– |
6.00 |
6 |
6 |
0 |
6 |
6.00 |
0.00 |
7.50 |
3.63 |
|
Adogbe |
6.00 |
13.74 |
– |
– |
– |
13.75 |
6 |
0 |
6 |
6.00 |
0.00 |
6 |
4.79 |
Sabo |
12.89 |
12.35 |
13.50 |
13.52 |
6 |
6 |
6 |
6.00 |
6.00 |
6 |
7.36 |
||
Rinsayo |
– |
– |
– |
6 |
– |
– |
– |
– |
6 |
1.00 |
|||
Sawmill |
6.00 |
6.00 |
6.00 |
43.14 |
6 |
6 |
6 |
6 |
6.00 |
6.00 |
6 |
8.60 |
|
Agbale II |
6.00 |
6.00 |
– |
6 |
6 |
6 |
– |
6.00 |
6.00 |
6 |
4.00 |
||
Ojoro |
5.95 |
6.00 |
6.00 |
6.00 |
6.00 |
6.75 |
5.86 |
6 |
6.00 |
6.00 |
6 |
5.55 |
|
Agate/Asawo |
6.00 |
13.19 |
6.00 |
– |
5.93 |
13.09 |
6 |
6 |
6 |
6.00 |
6.00 |
10. 50 |
7.06 |
NITEL |
12.82 |
13.83 |
13.82 |
13.51 |
9.33 |
13.20 |
12.95 |
14 |
6.00 |
7.00 |
6 |
10.21 |
|
Agbale I |
6.00 |
13.66 |
6.00 |
– |
6.00 |
14 |
6 |
7.5 |
6 |
7.50 |
6.00 |
6 |
6.55 |
Elerin Junction |
13.22 |
13.48 |
13.66 |
12.87 |
6 |
14 |
14 |
14 |
14.00 |
14.00 |
14 |
11.94 |
|
Camp Young |
6.00 |
13.74 |
6.00 |
6.00 |
2.43 |
13.29 |
6 |
– |
6.00 |
7.01 |
6 |
6.04 |
|
Iso Isu |
12.86 |
14.00 |
13.81 |
13.50 |
13.29 |
13.75 |
14 |
13.75 |
13.27 |
12.50 |
14.00 |
12.38 |
13.34 |
Table 4: Twelve Months SAIFI of all the Substations (Mar. 2014-Feb.2015)
SAIFI |
Mar. |
Apr. |
May |
June |
July |
Aug. |
Sept. |
Oct. |
Nov. |
Dec. |
Jan. |
Feb. |
Average |
Substation Name |
|||||||||||||
Wuraola |
0.33 |
9.96 |
0.66 |
0.57 |
0.67 |
10.62 |
1.33 |
2.66 |
0.66 |
2.99 |
1.33 |
1.33 |
2.76 |
St Anthony |
10.96 |
– |
11.29 |
9.96 |
10.63 |
2.01 |
– |
0 |
– |
– |
0.66 |
– |
3.79 |
Level Crossing |
1.00 |
3.34 |
1.34 |
1.03 |
0.69 |
1.34 |
2.34 |
3.01 |
3.34 |
4.67 |
2.01 |
2.01 |
|
Poly Junction |
0.67 |
2.01 |
– |
0.33 |
– |
1.33 |
0.30 |
0.33 |
– |
0.81 |
0.67 |
– |
0.54 |
440 Adejare |
2.99 |
6.67 |
4.00 |
2.36 |
1.01 |
0.33 |
2 |
0.66 |
1.33 |
0.96 |
2.68 |
2.66 |
2.30 |
Alusekere |
0.67 |
1.00 |
2.67 |
1.00 |
1.00 |
1.34 |
1 |
2 |
0.33 |
– |
0.67 |
3 |
1.22 |
Deeper Life |
0.33 |
6.67 |
0.34 |
– |
– |
2.00 |
2.67 |
2.00 |
1.99 |
1.00 |
2.34 |
0.67 |
1.67 |
Apaso |
1.00 |
0.33 |
1.67 |
1.00 |
0.67 |
3.00 |
2 |
1.50 |
– |
0.33 |
0.33 |
3.33 |
1.01 |
CAC |
3.67 |
1.00 |
1.00 |
0.67 |
1.34 |
3 |
2.67 |
0.67 |
4.67 |
5.67 |
3 |
1.09 |
|
Olukolo |
0.00 |
1.66 |
0.34 |
1.33 |
0.34 |
0.99 |
0 |
– |
0.66 |
0.00 |
0.67 |
0.5 |
|
Obada |
1.50 |
2.68 |
– |
0.67 |
0.33 |
1.34 |
0.34 |
1.01 |
0.34 |
1.67 |
1.84 |
0.98 |
|
Palace |
3.00 |
0.67 |
0.67 |
1.01 |
1.00 |
3 |
0.33 |
1 |
0.33 |
2.00 |
0.67 |
1.14 |
|
Olaiya |
0.66 |
0.67 |
1.00 |
1.34 |
1.66 |
1.00 |
0.33 |
– |
0.34 |
0.99 |
0.34 |
0.69 |
|
Akewula |
2.00 |
0.33 |
3.00 |
1.70 |
1.34 |
1.66 |
0.66 |
0.66 |
0.34 |
3.33 |
2.66 |
1.47 |
|
Apena |
0.00 |
1.33 |
0.34 |
2.00 |
0.67 |
1.67 |
0.67 |
0.67 |
– |
– |
0.61 |
||
INEC |
1.00 |
– |
– |
– |
0.67 |
2.01 |
1.34 |
– |
– |
– |
– |
0.42 |
|
Winners |
0.00 |
1.00 |
– |
– |
1.00 |
0.33 |
1 |
0 |
2 |
0.33 |
– |
1.33 |
0.42 |
Adogbe |
0.33 |
10.33 |
– |
– |
– |
10.67 |
3.33 |
0 |
0.33 |
1.00 |
– |
3.67 |
2.47 |
Sabo |
12.00 |
13.33 |
10.67 |
11.00 |
1 |
0.67 |
0.33 |
1.00 |
1.00 |
0.67 |
4.31 |
||
Rinsayo |
0.00 |
– |
– |
– |
0.33 |
0 |
– |
– |
– |
1 |
0.11 |
||
Sawmill |
0.33 |
0.67 |
0.33 |
2.00 |
0.34 |
0.33 |
1.33 |
0.33 |
2.01 |
0.33 |
0.33 |
0.69 |
|
Agbale II |
0.00 |
1.00 |
0.34 |
– |
0.66 |
0.34 |
1.02 |
– |
1.00 |
1.02 |
1 |
0.53 |
|
Ojoro |
0.34 |
1.34 |
2.71 |
0.34 |
0.34 |
2.65 |
1.35 |
0.99 |
1.32 |
0.66 |
0.99 |
1.09 |
|
Agate/Asawo |
1.34 |
16.67 |
0.34 |
– |
1.01 |
17.49 |
0.34 |
1.20 |
0.33 |
1.66 |
1.66 |
1.33 |
3.61 |
NITEL |
18.19 |
15.84 |
15.34 |
16.51 |
1.71 |
16.66 |
17.85 |
15 |
0.67 |
1.99 |
0.66 |
10.04 |
|
Agbale I |
2.00 |
15.55 |
1.33 |
– |
1.32 |
15.39 |
3.67 |
1.33 |
1.33 |
1.33 |
2.67 |
3.67 |
4.13 |
Elerin Junction |
17.05 |
16.72 |
15.56 |
17.05 |
1.75 |
14.89 |
15.61 |
15.11 |
15.61 |
15.61 |
14. 10 |
13.26 |
|
Camp Young |
0.34 |
10.37 |
1.36 |
0.34 |
1.68 |
11.31 |
0.34 |
– |
0.66 |
1.99 |
0.34 |
2.39 |
|
Iso Isu |
12.31 |
9.96 |
10.71 |
10.71 |
11.38 |
10.62 |
10.04 |
10.71 |
11.05 |
13.38 |
10.38 |
12.38 |
11.14 |
Table 5: Twelve Months ASAI of all the Substation (Mar. 2014-Feb.2015)
ASAI |
Mar. |
Apr. |
May |
June |
July |
Aug. |
Sept. |
Oct. |
Nov. |
Dec. |
Jan. |
Feb. |
Average |
Substation Name |
|||||||||||||
Wuraola |
99.73 |
100 |
99.47 |
99.45 |
99.47 |
100 |
98.89 |
97.85 |
99.45 |
97.32 |
98.93 |
98.51 |
99.09 |
St Anthony |
80.09 |
99.81 |
79.81 |
80.63 |
80.36 |
79.91 |
100 |
100 |
100 |
100.00 |
99.47 |
100 |
91.37 |
Level Crossing |
99.19 |
100 |
98.92 |
99.14 |
99.46 |
98.61 |
98.88 |
97.84 |
97.22 |
97.31 |
95.42 |
99.69 |
98.47 |
Poly Junction |
99.37 |
72.20 |
100 |
99.72 |
100.00 |
100 |
99.75 |
99.73 |
100 |
99.19 |
99.46 |
100 |
97.45 |
440 Adejare |
97.32 |
99.83 |
96.78 |
98.03 |
99.13 |
98.93 |
97.78 |
99.47 |
98.89 |
99.22 |
97.57 |
98.86 |
98.48 |
Alusekere |
99.46 |
9.93 |
97.31 |
99.16 |
99.19 |
99.73 |
99.44 |
98.12 |
99.72 |
100.00 |
99.46 |
97.32 |
91.57 |
Deeper Life |
99.73 |
0.01 |
99.73 |
100 |
100 |
98.92 |
97.78 |
98.38 |
98.33 |
99.19 |
97.85 |
96. 14 |
98.84 |
Apaso |
99.20 |
99.44 |
98.66 |
99.16 |
99.46 |
98.39 |
98.33 |
98.79 |
100 |
99.73 |
99.73 |
97.02 |
98.99 |
CAC |
96.68 |
99.72 |
99.19 |
99.16 |
99.46 |
97.58 |
97.50 |
97.85 |
99.44 |
95.97 |
94.62 |
97.02 |
97.85 |
Olukolo |
100.00 |
100 |
98.39 |
99.50 |
98.93 |
98.92 |
99.17 |
100 |
100 |
99.47 |
100 |
99.40 |
99.48 |
Obada |
95.96 |
100 |
97.84 |
100.00 |
99.46 |
99.73 |
98.89 |
99.73 |
99.16 |
99.73 |
97.17 |
98. 06 |
98.81 |
Palace |
97.58 |
100 |
99.46 |
99.16 |
99.19 |
99.73 |
96.94 |
99.73 |
99.17 |
99.73 |
98.12 |
99.40 |
99.02 |
Olaiya |
99.46 |
99.44 |
99.20 |
98.89 |
98.66 |
100 |
100 |
99.73 |
100 |
99.73 |
99.20 |
99.69 |
91.17 |
Akewula |
95.97 |
99.44 |
95.97 |
98.58 |
98.95 |
99.19 |
98.62 |
99.47 |
99.45 |
99.73 |
97.32 |
96.43 |
98.26 |
Apena |
100.00 |
99.72 |
98.93 |
99.50 |
98.39 |
100 |
99.44 |
98.66 |
99.44 |
99.46 |
100 |
100 |
99.46 |
INEC |
99.19 |
100 |
100 |
100 |
100.00 |
100 |
98.33 |
98.92 |
100 |
100.00 |
100 |
100 |
99.70 |
Winners |
100.00 |
100 |
100 |
100 |
99.19 |
99.46 |
99.12 |
100 |
98.33 |
99.73 |
100 |
98. 50 |
99.53 |
Adogbe |
99.73 |
99.16 |
100 |
100 |
100.00 |
99.73 |
97.22 |
100 |
99.72 |
99.19 |
100 |
96.73 |
99.29 |
Sabo |
79.21 |
80.27 |
77.87 |
80.00 |
80.02 |
80.29 |
99.12 |
99.46 |
99.72 |
99.19 |
99.19 |
99.40 |
89.48 |
Rinsayo |
100 |
100 |
100 |
100.00 |
100 |
100 |
100 |
100 |
100 |
100.00 |
100 |
99. 11 |
99.93 |
Sawmill |
99.73 |
100 |
99.46 |
99.72 |
88.39 |
99.73 |
99.73 |
98.92 |
99.72 |
98.35 |
99.73 |
99.70 |
98.60 |
Agbale II |
100.00 |
100 |
99.19 |
99.72 |
100.00 |
99.73 |
99.72 |
99.18 |
100 |
99.19 |
99.18 |
99. 11 |
99.57 |
Ojoro |
99.73 |
100 |
97.82 |
99.72 |
99.73 |
99.73 |
97.51 |
98.93 |
99.17 |
98.93 |
99.47 |
99. 11 |
99.15 |
Agate/Asawo |
98.92 |
98.87 |
99.73 |
100.00 |
99.20 |
100 |
99.72 |
98.39 |
99.72 |
98.66 |
98.66 |
97.92 |
90.82 |
NITEL |
68.67 |
69.43 |
70.56 |
70.55 |
70.03 |
69.23 |
69.45 |
68.94 |
70.83 |
99.46 |
98.12 |
99.4 |
77.06 |
Agbale I |
98.39 |
100 |
98.93 |
100.00 |
98.93 |
97.85 |
96.94 |
98.66 |
98.89 |
98.66 |
97.85 |
96.73 |
98.49 |
Elerin Junction |
69.71 |
70.49 |
69.71 |
70.49 |
70.29 |
71.05 |
71.05 |
70.62 |
70.62 |
70.62 |
70.62 |
70.62 |
70.49 |
Camp Young |
99.73 |
100 |
98.90 |
99.71 |
99.45 |
98.59 |
100 |
99.73 |
100 |
99.47 |
98.13 |
99.69 |
99.45 |
Iso Isu |
78.72 |
80.19 |
80.11 |
79.91 |
79.66 |
79.79 |
80.47 |
80.20 |
79.63 |
77.51 |
80.47 |
78.4 |
79.59 |