Replenishment Policy for EMQ Model with Rework, Multiple Shipments, Switching and Packaging

DOI : 10.17577/IJERTV2IS1344

Download Full-Text PDF Cite this Publication

Text Only Version

Replenishment Policy for EMQ Model with Rework, Multiple Shipments, Switching and Packaging

W. Ritha1 and Nivetha Martin2

1 Department of Mathematics, Holy Cross College ( Autonomous ) ,Tiruchirapalli – 2

Presently the advancement of technology is mind-blowing .The manufacturers employ various tactics to make their production the best among their opponents. The products that are made are expected to be free from defects, but that is not possible always. The manufactured products become defective either due to technical faults or due to recklessness of the labourers. Thus the presence of defective items in a manufactured lot is quite common. To rectify the defects, the firm owners focus on rework and waste disposal of scrap items. As the processes involved in manufacturing and reworking are distinct, switching cost is incurred when the production process is shifted to the process of remanufacture and vice versa. This paper presents a mathematical model which determines optimal inventory replenishment policy for the Economic Manufacturing Quantity (EMQ) with rework and multiple shipments along with the inclusion of switching and packaging cost.

  1. Today the EMQ model is broadly applied industry wide. The classic economic manufacturing quantity model assumes all items produced are of perfect quality. However, in a real-life manufacturing system, due to process of deterioration or various other factors, generation of defective items seems inevitable. The defective items produced sometimes can be reworked and repaired. The items that are not fit for rework are expelled as waste. Thus rework helps in reducing the total costs of productioninventory. Many researchers namely Liu., Tang., Chiu et al., Jamal et al. developed EMQ models with rework. The classic EMQ model also assumes a continuous issuing policy for satisfying product demand. However, in real life vendorbuyer integrated supply chain environment, a multiple deliveries policy is commonly used in dealing with customers demands. Many studies have since been carried out to address various aspects of vendorbuyer supply chain optimization issues. To bridge the gap between the joint effect of rework and multi-shipment policy Yuan.et.al proposed an EMQ model to determine the optimal replenishment policy.The model developed by Yuan.et.al is modified by the inclusion of

    switching costs, which is the change over costs that is incurred at times of shifting from production to repair and vice versa. A variety of switching costs like additional setup cost to switch between workstations, jobs, or products, Switching the production rate, Machine start- up/shutdown, Machine cleaning, Tooling, Machine adjustment, Additional labor and so on.[1]. Packaging is yet another significant gaining phenomena whose usage is mandatory these days because of its role in safeguarding the quality of the products.Among the various types of packaging tertiary packaging is employed for the shipment of large quantities of goods [5].To comprise all the concepts such as rework, multiple shipment, switching and packaging along with its associated costs this model is proposed. The intention of this proposal is to determine the effect of including switching cost and packaging cost to EMQ model with rework and multiple replenishment. In this paper the EMQ model is formulated along with the discussion of 2 special cases. A numerical example is also presented which validate the model.

  2. This paper incorporates rework process, multiple shipments along with switching and packaging costs into an imperfect EMQ model with random defective rate. Consider a manufactured product has a flat annual demand rate and this item can be produced at a constant production rate P. The process may randomly generate a portion x of defective items at a production rate d. All items produced are screened and inspection cost is included in the unit production cost C. All defective items produced are reworked at a rate of P1, immediately after the regular process ends. A portion 1 (where 0 1 1) of reworked items fails and becomes scrap. To prevent a shortage from occurring, the production rate P is assumed to be larger than the sum of demand rate and production rate of defective items d. That is: (P d ) > 0 or (1 x /P) > 0; where d can be expressed as d = Px. Let d1 denote the production rate of scrap items during the rework process, then d1 can be expressed as: d1 = P 1 1. It is further assumed that a multiple shipment policy is employed and the finished items can only be delivered to customers at the end of the rework when the whole lot is quality assured. Fixed quantity n instalments of a finished batch are delivered to customers at a fixed interval of time during production downtime t3. In addition to the above cost repair setup cost r is incurred before the commencement of the rework process. Also the cost of switching from production to rework (r1) and rework to delivery (d1) are included.

    1. The following assumptions are used throughout this paper

      1. Shortages are not allowed.

      2. Remanufactured products are considered as good ones.

      3. The production process is shifted to remanufacturing process only once during the cycle length T.

The following notations as in [11] including the additional notations are as follows

= Maximum level of on- hand inventory in units when regular production process ends.

H = the maximum level of on- hand inventory in units when the rework process finishes t1 = the production uptime for the proposed EMQ model

t2 = time required for reworking of defective items

t3 = time required for delivering all quality assured finished products

n = number of fixed quantity instalments of the finished batch to be delivered by request to customers

tn = a fixed interval of time between each instalment of finished products delivered during production downtime t3

Q = manufacturing batch size, to be determined for each cycle I(t) = on-hand inventory of perfect quality items at time t

Id (t) =on-hand inventory of defective items at time t

TC(Q) = total production-inventory-delivery costs per cycle for the proposed model

TC1 (Q) = total production-inventory-delivery costs per cycle when all defective items are reworked and repaired (i.e. special case 1: 1 =0)

TC2 (Q) = total production-inventory-delivery costs per cycle when no defective items are produced (i.e. special case 2: x =0)

E[TCU(Q)] = the long run average costs per unit time for the proposed model E[TC1U(Q)] = the long run average costs per unit time for the model in special case 1 E[TC2U(Q)] = the long run average costs per unit time for the model in special case 2

x = defective rate ; = demand rate; C = variable production cost;K = production set up cost ;Ck

= variable rework cost; Cs = disposal cost; K1 = fixed delivery cost per shipment;CT = variable delivery cost per shipment; h = variable holding cost for time reworked;p = holding cost during

uptime t1; p = holding cost during the rework time t2; p = holding time during the delivery time t3;T = cycle length

The additional notations that are introduced newly are as follows

r = repair set up cost; r1 = switching cost from production to repair; d1 = switching cost from repair to delivery; p = packaging cost per unit that is to be delivered

The production cycle length is T = t1 +t2 + t3 and

For any given production cycle the total productioninventorydelivery costs are TC(Q).

= +K + CR [xQ] + s [ xQ 1 ] +n K1 + CT [Q(1- 1 x)] +

+ + ] + p ( H + r1 + d1

+ r + p[Q(1- 1 x)] (1)

Where , , , ,

Eq. (1) consists of variable production costs, the production setup cost, variable rework costs, disposal costs, fixed and variable delivery costs, variable holding cost for items reworked, holding cost (p) during uptime t1, holding cost (p ) during reworking time t2, and holding cost (p) for finished goods during the delivery time t3 where n fixed-quantity instalments of the finished batch are delivered to customers at a fixed interval of time, repair setup cost, delivery setup cost ,switching cost and packaging cost.Defective rate x is assumed to be a random variable with a known probability density function. To take this randomness into account, one can use the expected value of x in the cost analysis. Substituting all related parameters in TC(Q), the expected productioninventory cost per unit time E[TCU(Q)] can be obtained.

= + +

]

=

+ +

+ ]

The optimal inventory replenishment lot size can be obtained by minimizing the expected cost function E[TCU(Q)].Differentiating E[TCU(Q)] with respect to Q, the first and second derivatives of E[TCU(Q)] are shown in Eqs. (2) and (3).

+ +

] (2)

(3)

Eq. (3) is resulting positive, because variables K, n, K1, , Q, and (1 E[x]) are all positive. The second derivative of E[TCU(Q)] with respect to Q is greater than zero. Therefore, E[TCU(Q)] is a convex function for all Q different from zero. Then, the optimal replenishment lot size Q* can be obtained by setting the first derivative of E[TCU(Q)] equal to

zero

++

] = 0

And the optimal order quantity is (4) Special cases to the proposed model

Case 1. When 1 = 0.

Suppose that the rework process is perfect, i.e. all reworked items are repaired.

The expected productioninventorydelivery cost per unit time for this specific model becomes

++

+

]

By following the above procedure we obtain

(7)

Suppose all items produced are of perfect quality, i.e. x = 0.

The expected productioninventorydelivery cost per unit time for this specific model becomes

+

.In this case the optimal order quantity is

(10)

Assume a manufactured item can be produced at a rate of 60,000 units per year and has a flat demand rate of 3400 units per year. A random defective rate x is assumed during the production uptime, where x follows a uniform distribution over the interval [0, 0.3]. All defective items are reworked at a rate of P1 = 2200 units per year. A portion 1 = 0.1 of reworked items fails during the reworking and becomes scrap. The following are values of other variables considered in this example: C = 100 per item, K = 20,000 per production run,K1 = 4350 per shipment, a fixed cost. CT = 0.1 per item delivered, CR = 60, repaired cost for each item reworked,Cs = 20, disposal cost for each scrap item, n = 4 installments of the finished batch are delivered per cycle, h = 20 per item per year,p = 40 per item per year.p = 30 per item per yearp = 35 per item per year = 80 ,

a fixed cost,r1 = 50, a fixed cost,d1 = 45, a fixed cost. By using Eq. (4) the optimal replenishment policy Q*= 2723 is obtained.

The optimal replenishment policy Q* = 2721 for special case 1 (i.e. situation when all reworked items are 100% repaired) is obtained by using Eq.(7)

For special case 2 (i.e. a situation when all items produced are of perfect quality) the optimal lot size Q* = 3075 is obtained by using Eq.(10).

This paper studies the optimal inventory replenishment policy for the economic manufacturing quantity model with rework, multiple shipments, switching and packaging cost. It also comprises of a model with two special cases .This model is very helpful to the inventory managers for maintaining balance between the process of production and rework also it facilitates the firm owners to allocate the setup cost for rework to make it desirable

  1. Ahmed M.A. El Saadany, Mohamad Y. Jaber, The EOQ repair and waste disposal model with switching costs, Computers & Industrial Engineering 55 (2008) 219233

  2. Chiu,S.W., Chen,K.K., Chang,H.H. Mathematical method for expediting scrap-or-rework decision making in EPQ model with failure in repair, Mathematical and Computational Applications 13 (2008) 137145.

  3. Chiu,S.W. King,C., Chiu,Y.S.P. Optimal production lot sizing with rework, scrap rate, and service level constraint, Mathematical and Computer Modelling 46 (2007) 535549.

  4. Dobos,I., & Richter, K. (2000). The integer EOQ repair and waste disposal model Further analysis. Central European Journal of Operations Research, 8(2), 173194.

  5. Davis .G , Song, J.H.,2006. Biodegradable packaging based on raw materials from crops and their impact on waste management. Industrial Crops and Products 23, 147161.

  6. Jamal,A.M.M., Sarker,B.R. Optimal batch size for a production system operating under a just-in-time delivery system, International Journal of Production Economics 32 (1993) 255 260.

  7. Lu,L. A one-vendor multi-buyer integrated inventory model, European Journal of Operational Research 81 (1995) 312323.

  8. Viswanathan,S. Optimal strategy for the integrated vendorbuyer inventory model, European Journal of Operational Research 105 (1998) 3842.

  9. Liu,J.J., Yang,P. Optimal lot-sizing in an imperfect production system with homogeneous reworkable jobs, European Journal of Operational Research 91 (1996) 517527.

  10. So,K.C., Tang,C.S. Optimal operating policy for a bottleneck with random rework, Management Sciences 41 (1995) 620636.

  11. Yuan-Shyi, Peter Chiu, Shang-Chih Liu, Chun-Lin Chiu,Huei-Hsin Chang, Mathematical modeling for determining the replenishment policy for EMQ model with rework and multiple shipments, Mathematical and Computer Modelling 54 (2011) 21652174