Traffic Signal and Junction Design: A Case Study of Rajkot City

DOI : 10.17577/IJERTV6IS070302

Download Full-Text PDF Cite this Publication

Text Only Version

Traffic Signal and Junction Design: A Case Study of Rajkot City

Vaishali Parmar

Department of civil engineering, Indus University Ahmedabad, India

Ruchika Lalit

Department of civil engineering, Indus University Ahmedabad, India

AbstractThe increase in development and, hence traffic hindering create a critical need to operate our transportation systems with maximum capability. Real time traffic signal control is a main part of new part of the new urban traffic control systems aimed at achieving the best utilization of the road network. The use of traffic signal for control of different streams of vehicular and pedestrian traffic is wide in most of the towns and city. This study focused on the junction of the Rajkot city which is located in the saurashtra region of Gujarat state. A classified volume count survey had been carried out to monitor the traffic and the collected data was utilized for the design of traffic signals using Websters formula. Based on the analytical part, author suggested an auxiliary lane design as per IRC 41- 1994.

Keywords Traffic Signal, Auxiliary Lane, Traffic Management, Traffic Volume,

  1. INTRODUCTION

    Traffic signals are the means of retaining a resolute flow of traffic in an suitable way and to reduce the conflicts at junctions as well as roads. They provide more efficiency if designed properly. The first traffic signal is stated to have been used in London as early as in 1868 and was of the semaphore – arm type with red and green lamps for night use. During the

    100 years since then traffic signals have been original to a high grade of difficulty. Providing effective real time traffic signal control for a large hard traffic for a network is a very inspiring circulated control difficult. Signal system process is further more hard by the new advance that views the traffic signal system as a small part of a combined multimodal transportation system.

    The urban traffic system is a very difficult system which involves many relationships among them is more complex. The setup the system for an area with the traffic needs to be calculated and before setting it up. This helps in the calculation and the efficiency of the flow through the area and types out the correction that can be applied to growth the traffic flow.

  2. AIM AND OBJECTIVES

    Aim of this study is to prepare a plan for traffic signal by study of junction design. In particular, in this work we show that i) the geometric and signal setting features of typical traffic signal. ii) Traffic flow pattern through the signal. iii) Estimate the performance of a signal iv) and suggest the remedial measures to improve the performance of the traffic signal.

  3. GENERAL BACKGROUND

    1. Signals in India

      According to Indian Practice, an amber period of 2 seconds as an change intermission between finish of related green drive and display of red signal or between finish of a red signal and origination of related green movement.

    2. Pedestrian Signal

      According to IRC:093 the Traffic Signals suggests the following symbols for foot-travelers. The red standing man signifies that dont cross signal and the green walking man represents cross signal. A flashing amber signal is a danger sympathy beacons normally used to warn of blockade and joints to increase regularity signs and to warn of midblock cross – walks

      Fig1: Pedestrian Signal Indications as per Indian practice

    3. Signal Face

      • The minimum number of lenses in a signal face is three – red, amber and green. The lenses in a signal face can be prepared in a vertical or horizontal straight line. The relative points are red, amber and green. A simple signal face with three lenses in a vertical line is indicated in the Fig2.

        • The lenses are normally of two sizes, viz., 200mm and 300 mm diameter. The larger size is used where the 85th percentile line speeds exceeds 65

          K.P.H For problematic area, for all arrow signal, for Caution where signalization may be unforeseen and for conflicts where drivers may view both traffic control and lane directions control signs simultaneously.

          Fig2: Signal Face

          A. Methodology

          Fig4: Location of Rajkot city

          • Do not mix complete spellings and abbreviations of units: Wb/m2 or webers per square meter, not webers/m2. Spell units when they appear in text: …a few henries, not …a few H.

          • Use a zero before decimal points: 0.25, not .25. Use cm3, not cc. (bullet list)

    4. Traffic Cycle time in Indian practice

      In Indian practice, a typical example of signal indications in a three phase signal is red, green and amber. The amber interval is change interval between end of related green movement and starting of a red signal or between finish of a red signal and origination of related green movement. . In the first case it is Permission Amber and in the second case it is called Initial Amber". The amber period is generally 2 seconds.

      Fig3: Signal indications in a two phase signal

  4. CASE STUDY OF RAJKOT CITY

    Rajkot is the fourth-largest city in the state of Gujarat, India, after Ahmedabad, Surat and Vadodara. Rajkot is the centre of the Saurashtra region of Gujarat. Rajkot is having approximately 1.2 millions of population as of 2015 and metropolitan area is 170km2

    To install the traffic signal and for the geometric design of junction we have to conduct out several types of surveys:

    1. Classified volume count survey

    2. Road side interview survey

    3. Public and Para-Transit Transportation survey

    4. Origin and Destination survey

    5. Home interview survey

    6. Registration plate number survey

    7. Parking survey

    8. Pedestrian survey

        • Main purposes of traffic survey:

          The main purposes of traffic survey are traffic monitoring, traffic control and management, traffic enforcement, traffic forecasting, model calibration and validating etc.

          In this research work, we had perform classifeid volume count survey there are two major methods of counting vehicle for volume survey

          1. Manual Counting Method

          2. Automatic counting method.

    From the above two methods we had conducted manual volume counting method.

      • Importance of Traffic Volume Study:

    1. Increase the efficiency and life of roads

    2. Reduces traffic volume at a particular section

    3. Provide better means for development of infrastructures

    4. Provide better means to utilize other roads in case of special events in the city

    5. Provide estimate of no vehicles against no of persons Methodology

    Identify applicable sponsor/s here. If no sponsors, delete this text box (sponsors).

    1. Location of volume count survey

      Fig5: Location Map

      Fig 6: Location of Mavdi chowk

    2. Data Collection and Result Analysis

      As we had collected the volume count survey data during morning peak hour and evening peak hour. The data collected during the survey is represented from the following table:

      Sl No

      Time Period

      LCV

      HCV

      NMT

      Tot al

      Oth ers

      From

      To

      Two Wheel er

      Auto Rick- shaw

      Car/ Jeep

      Tem po

      Bus

      Truck

      Trac tor

      Bicy cle

      Animal Drawn Cart

      0.5

      1.2

      1

      1.4

      2.2

      2.2

      4

      0.4

      1.5

      2

      1

      8:00

      8:1

      298

      18

      68

      5

      8

      2

      2

      4

      0

      2

      281

      2

      8:15

      8:3

      300

      20

      70

      3

      6

      4

      2

      6

      0

      1

      265

      3

      8:30

      8:4

      309

      16

      74

      7

      3

      4

      1

      3

      0

      2

      281

      4

      8:45

      9:0

      319

      23

      69

      6

      3

      3

      3

      5

      0

      5

      282

      5

      9:00

      9:1

      329

      24

      71

      5

      2

      2

      5

      9

      0

      8

      282

      6

      9:15

      9:3

      341

      28

      79

      10

      6

      7

      6

      7

      0

      6

      301

      7

      9:30

      9:4

      352

      29

      80

      12

      5

      6

      5

      10

      0

      7

      319

      8

      9:45

      10:

      378

      24

      86

      12

      3

      3

      2

      7

      0

      3

      364

      9

      10:0

      10:

      380

      30

      71

      9

      2

      2

      1

      3

      0

      1

      369

      10

      10:1

      10:

      388

      31

      67

      10

      2

      4

      1

      5

      0

      2

      350

      11

      10:3

      10:

      365

      29

      62

      4

      3

      3

      1

      7

      0

      0

      325

      12

      10:4

      11:

      342

      30

      59

      2

      1

      3

      2

      3

      0

      2

      344

      Table1. Morning peak hour data

      PCU (Passenger Car Unit)

      Morning peak hour data

      PCU = Volume/Capacity PCU = 3531.14/3600 PCU = 0.98087

      Sl No

      Time Period

      LCV

      HCV

      NMT

      Total

      Oth ers

      Fro m

      To

      Two Wheel er

      Auto Rick- shaw

      Car/ Jeep

      Tem po

      Bus

      Truck

      Trac tor

      Bicy cle

      Animal Drawn Cart

      0

      1

      1

      2

      2

      0

      1

      2

      1

      8:0

      8:1

      2

      22

      3

      4

      1

      2

      1

      1

      0

      0

      233

      2

      8:1

      8:3

      3

      21

      4

      3

      2

      1

      1

      9

      0

      1

      213.2

      3

      8:3

      8:4

      3

      29

      4

      4

      5

      2

      2

      4

      1

      0

      233

      4

      8:4

      9:0

      3

      27

      5

      5

      3

      3

      1

      1

      0

      1

      242.6

      5

      9:0

      9:1

      3

      30

      5

      8

      1

      2

      1

      4

      0

      2

      271.9

      6

      9:1

      9:3

      3

      34

      5

      1

      2

      1

      2

      5

      0

      3

      278.5

      7

      9:3

      9:4

      399

      32

      60

      9

      1

      0

      1

      7

      0

      1

      303.4

      8

      9:4

      10:

      409

      33

      68

      8

      1

      0

      1

      14

      0

      1

      3250

      9

      10:

      10:

      4

      24

      7

      7

      6

      2

      1

      4

      0

      1

      321.5

      10

      10:

      10:

      4

      20

      7

      7

      3

      2

      1

      8

      1

      2

      337.1

      11

      10:

      10:

      4

      19

      7

      6

      4

      0

      0

      1

      0

      1

      345.3

      12

      10:

      11:

      4

      24

      8

      5

      2

      1

      0

      4

      0

      0

      353

      Table2. Evening peak hour data

      Evening peak hour data

      PCU = Volume/Capacity PCU = 3457.90/3600 PCU = 0.960

      Fig 7: Traffic composition during morning peak hour

      Fig 8: Traffic composition during Evening peak hour

      Design of signal Timing

      1. For Morning Peak data

        From equation Websters formula we have, Optimum cycle length in seconds

        L = Total lost per cycle

        = 6 seconds (lost time per cycle)

        <>y = Flow / Saturation flow of an approach s = 650 w PCU/ per hour

        Therefore,

        • For phase I

          s = 650 X 6 = 3900 PCU/per hour

        • For Phase II,

          The width of the road occupied by the vehicle is considered to be 5 m whose saturation value is provided accordingly to equation and hence the saturation value has to be increased as per observation by 650.

          s = (1890 X 650)/525 = 8190 PCU/per hour

        • For phase III, Therefore,

        s= [(1890 X 650)/525] X 3 = 8190 PCU/per hour

        Now,

        Y = y1+y2+y3…………… (Since it's a three phase signal) where, y is the ratio of actual flow to saturation flow.

          1. ., Y = Volume/Saturation flow for critical approach in each phase

            y= q/s

            • For Phase I,

        y1 = 1696/3900

        = 0.43

        • For Phase II, y2= 1969/8190

          = 0.24

        • For Phase III, y3= 1927/8190

          = 0.23

          Therefore,

          Y = 0.43+0.24+0.23

          Y = 0.90

          From equation

          140 seconds

          Therefore, the total effective green time can be given as

          = 140-60

          = 130 seconds Effective green time for each phase,

          Where

          g= (y1/Y) X total effective green

        • For Phase I,

          g1= (0.43/0.90) X 134

          = 64.02 seconds

        • For Phase II,

          g2= (0.24/0.90) X 134

          = 42.72 seconds

        • For Phase III,

          g3= (0.23/0.90) X 134

          = 34.24 seconds

          However, provide a minimum green time of 15 seconds. Therefore taking g3 as 34.24 seconds. The total cycle time by providing 3 seconds for amber is found to be 143 seconds

          Fig 9: Timing Diagram (Morning Peak)

      2. For Evening Peak data From equation

    Effective green time for each phase, Where

    We have, L = 6 seconds (lost time per cycle)

    Considering the saturation to be high, Taking, s = 650 w PCU/ per hour

    Therefore,

      • For phase I,

        s = 650 X 6 = 3900 PCU/per hour

      • For Phase II,

        The width of the road occupied by the vehicle is considered to be 5 m whose saturation value is provided accordingly to equation and hence the saturation value has to be increased as per observation by 650.

        s= [(1890 X 650)/525] X 3 = 8190 PCU/per hour

      • For phase III, Therefore,

        s= [(1890 X 650)/525] X 3 = 8190 PCU/per hour

        Now,

        Y = y1+y2+y3…………… (Since it's a three phase signal) where, y is the ratio of actual flow to saturation flow. i.e

        y= q/s

      • For Phase I,

        y1 = 1608/3900

        = 0.41

      • For Phase II, y2= 2010/8190

        = 0.24

      • For Phase III, y3= 2238/8190

        = 0.27

        Therefore,

        Y = 0.41+0.24+0.27

        Y = 0.92

        From equation

        C0 = 175 seconds

        Therefore, the total effective green time can be given as

        = 175- 6

        = 169 seconds

        g= (y1/Y) X total effective green

      • For Phase I,

        g1= (0.41/0.92) X 169

        = 75.13 seconds

      • For Phase II,

        g2= (0.24/0.92) X 169

        = 44 seconds

      • For Phase III,

    g3= (0.27/0.92) X 169

    = 49.59 seconds

    However, provide a minimum green time of 15 seconds. Thus taking g3 as 49.59 seconds. The total cycle time by providing 3 seconds for amber is found to be 178 seconds.

    Fig 10: Timing Diagram (Evening Peak)

  5. SOLUTION

    1. Provide proper timing cycle to peak hour morning and evening time

    2. Provide Auxiliary Lanes at road to reduce traffic

      congestion

      • As per IRC 41-1994, Intersection operation can be increased by including auxiliary lanes for right turn (fig1), or left turn (fig2) or through lanes.

      • When turning speeds are more than 25 km ph., the lane generally separated by an island, which also serves as pedestrian refugee

      • Right turn lane is provided by recessing the median.

      • The length of the lane usually varies from 30 to 90 m, depending upon flow.

    Fig 11: Suggestion view for left side

  6. CONCLUSION

    On the basis of comparative studies of the traffic signal and junction design, we have conclude that an auxiliary on junction with slope of 10:1 at the intersection of road width two auxiliary lane are provide to reduce traffic congestion problem. A great care should be taken to design junction at inter section for pedestrian and bicycle track .with the study of traffic volume count survey it is given in IRC that if traffic volume less than 5000 so we have to give rotary or round about, but in our study traffic volume count is more than 5000, so we conclude suggest Auxiliary lane on both side of the road.

    ACKNOWLEDGMENT

    We would like to take this opportunity to express our profound gratitude and deep regard to the final year B.Tech students of RK University, Rajkot for their exemplary work, valuable feedback and constant encouragement throughout the duration of the project.

    Fig 12: Suggestion view for right side

  7. REFERENCES

  1. Dr. Santosh Ajalihal, Dr. T.S. Reddy, Kayitha Ravinder. Proceedings of eastern asia society for transportation studies vol 5 (2005): 1009-1024.

  2. Ibrahim, Johnnie Ben-Edige and Iffazun Mohd. University Technology Malaysia (January 2010): ISSN 1819-6608 vol 5 no.1 .

  3. Justo, S.K Khanna and. Highway Engineering. New Delhi: Khanna publication, n.d.

  4. Kadiyali, L.R. Traffic Engineering and Transport Planning. New Delhi: Khanna publications, n.d.